Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
May 28, 2010 Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT - LICENSE AMENDMENT REQUEST FOR APPROVAL OF THE CYBER SECURITY PLAN (TAC NO. ME2635)
Dear Sir:
By letter dated November 19, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093230831), Entergy Nuclear Operations, Inc., (ENO, the licensee),
submitted a license amendment request (LAR) for Palisades Nuclear Plant (PNP). The proposed LAR includes the cyber security plan, proposed changes to paragraph 2.E of the Renewed Facility Operating License No. DPR-20, and a proposed Cyber Security Plan Implementation Schedule. The proposed cyber security plan has been submitted in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.54. The purpose of this letter is to inform you that the U.S. Nuclear Regulatory Commission (NRC) staff has completed an initial review of this LAR. In accordance with the Office of Nuclear Reactor Regulation Office Instruction LIC-109, Acceptance Review Procedures, (ADAMS Accession No. ML091810088),
Section 3.1.3, the NRC staff has decided to forgo the traditional acceptance review due to the complexity and first-of-a-kind nature of this application. While the NRC staff has docketed your application, the NRC staff is not rendering a judgment as to the acceptability of the submittal within the context of an acceptance review.
The cyber security plan submittal prepared for PNP is based on an earlier version of Nuclear Energy Institute (NEI) guidance. The NRC staff had significant generic concerns with this guidance. As a result of NRC staff discussions with NEI and the Executive Task Force of the industry Nuclear Security Working Group (NSWG), NEI and NSWG committed to representing operating power reactor licensees in resolving these concerns.
Through numerous interactions, the NRC staff has communicated its generic concerns with the NEI guidance. The security-related nature of the information required these interactions to be conducted in closed meetings not open to the public. A publicly available list of the specific issues discussed with NEI and NSWG was communicated to the licensees via e-mail dated March 9, 2010 (ADAMS Accession No. ML100680284).
By letter dated April 28, 2010 (ADAMS Accession No. ML101180434), NEI submitted Revision 6 to NEI 08-09, Cyber Security Plan for Nuclear Power Reactors (ADAMS Accession No. ML101180347), which contains changes that address the NRC staff concerns associated with previous versions. Based on a technical review of the document, the Office of Nuclear Security
Vice President, Operations and Incident Response, in its letter dated May 5, 2010, (ADAMS Accession No. ML101190371) concluded that submission of a cyber security plan using the template provided in NEI 08-09, Revision 6, dated April 2010, would be acceptable for use by licensees to comply with the requirements of 10 CFR 73.54, with the exception of the definition of cyber attack.
Therefore, to resolve the NRC staffs concerns with the requested LAR, ENO is requested to review the list of generic issues provided to the industry cyber security writing team and forwarded to all licensees via e-mail dated March 9, 2010 and provide a revised submittal. For those generic issues that will not be addressed in the revised submittal, please provide additional information or justification in the revised submittal.
For any changes to the Cyber Security Plan proposed in the LAR, ENO is requested to indicate that the revised submittal supersedes, in its entirety, the previous submittal (or indicate what portions are superseded).
As an alternative to, and a potentially less resource intensive method than, addressing the individual issues, ENO may submit a revised Cyber Security Plan consistent with Regulatory Guide (RG) 5.711 or submit a revised Cyber Security Plan consistent with NEI 08-09, Revision 6. However, if this option is exercised, the NRC staff expects that the existing application will be withdrawn and the revised application resubmitted at the same time.
The NRC staff requests that the ENOs response or revised application be submitted within 60 days of the date of this letter. Please contact me if circumstances result in the need to revise the requested response date.
Following receipt and review of your response, you will be advised by separate correspondence if any further information is needed to support the NRC staff=s detailed technical review.
If you have any questions regarding this matter, I may be reached at (301) 415-8371.
Sincerely,
/RA PTam for/
Mahesh Chawla, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 cc: Distribution via ListServ 1
In January 2010, the NRC staff issued RG 5.71, Cyber Security Programs for Nuclear Facilities (ADAMS Accession No. ML090340159). This guidance provides an approach that the NRC staff deems acceptable for complying with the Commissions regulations regarding the protection of digital computers, communications systems, and networks from a cyber security attack.
ML101190371) concluded that submission of a cyber security plan using the template provided in NEI 08-09, Revision 6, dated April 2010, would be acceptable for use by licensees to comply with the requirements of 10 CFR 73.54, with the exception of the definition of cyber attack.
Therefore, to resolve the NRC staffs concerns with the requested LAR, ENO is requested to review the list of generic issues provided to the industry cyber security writing team and forwarded to all licensees via e-mail dated March 9, 2010 and provide a revised submittal. For those generic issues that will not be addressed in the revised submittal, please provide additional information or justification in the revised submittal.
For any changes to the Cyber Security Plan proposed in the LAR, ENO is requested to indicate that the revised submittal supersedes, in its entirety, the previous submittal (or indicate what portions are superseded).
As an alternative to, and a potentially less resource intensive method than, addressing the individual issues, ENO may submit a revised Cyber Security Plan consistent with Regulatory Guide (RG) 5.711 or submit a revised Cyber Security Plan consistent with NEI 08-09, Revision 6. However, if this option is exercised, the NRC staff expects that the existing application will be withdrawn and the revised application resubmitted at the same time.
The NRC staff requests that the ENOs response or revised application be submitted within 60 days of the date of this letter. Please contact me if circumstances result in the need to revise the requested response date.
Following receipt and review of your response, you will be advised by separate correspondence if any further information is needed to support the NRC staff=s detailed technical review.
If you have any questions regarding this matter, I may be reached at (301) 415-8371.
Sincerely,
/RA/
Mahesh Chawla, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.50-255 cc: Distribution via ListServ 1
In January 2010, the NRC staff issued RG 5.71, Cyber Security Programs for Nuclear Facilities (ADAMS Accession No. ML090340159). This guidance provides an approach that the NRC staff deems acceptable for complying with the Commissions regulations regarding the protection of digital computers, communications systems, and networks from a cyber security attack.
Distribution:
PUBLIC LPL3-1 Reading RidsAcrsAcnw_MailCTR Resource RidsRgn3MailCenter Resource RidsNrrDirsItsb Resource RidsNrrDorlDprResource P. Pederson, NSIR RidsNrrDorlLpl3-1 Resource RidsOgcRp Resource C. Erlanger, NSIR RidsNrrLABTully Resource RidsNrrPMPalisades Resource ADAMS Accession No.: ML101440377 OFFICE LPL3-1/PM LPL3-1/LA LPL3-1/BC NAME MChawla BTully RPascarelli/PTam for DATE 05 / 27 /10 05 / 28 /10 05 /28 /10