Entergy Operations, Inc. and GE-Hitachi Nuclear Energy Slide Presentation for May 25, 2010 - NRC RAIs Regarding GGNS Prnm System LAR (Non-Proprietary)
ML101380421
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/25/2010
From:
Entergy Operations, GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Reactor Regulation
Lyon C Fred, NRR/DORL/LPL4, 301-415-2296
Shared Package
ML101380411 List:
References
TAC ME2531
Download: ML101380421 (23)


Text

1 NRC RAIs Regarding GGNS PRNM System LAR Entergy Operations, Inc.

GE Hitachi Nuclear Energy May 25, 2010

2 Purpose of the Meeting Discuss RAIs Ensure RAIs are understood Discuss approach to responses

3 PRNM System Overview A digital upgrade to the current APRM subsystem of the Neutron Monitoring System (NMS)

Results in greater instrument accuracy, redundancy, improved response times, and scram avoidance.

No setpoint drift System design and associated TS changes documented in PRNM LTR (NEDC-32410P-A); approved by NRC

4 PRNM System Overview (contd)

Supports plant operation at higher power levels Supports a different core stability solution needed for extended power uprate conditions Changing from Option E-I-A to Option III

5 Current APRM Configuration (e) HITACHI LPRM Inputs APRMC APRMG LPRM Inputs DIV III RPSA ~~~---------

LPRM Inputs APRMA APRME LPRM Inputs DIVI


.. RPS B LPRM Inputs APRMB APRM F LPRM Inputs DIV II LPRM Inputs APRMD APRMH LPRM Inputs DIVIV

-~ Entergy.

THE POW" R O f PE OP lf 'M

6 PRNM Configuration

((

{3}))

(e) HITACHI

-~ Entergy.

THE POW" R O f PE OP lf 'M

7 PRNM System - GGNS Block Diagram

((

{3}))

GEH PROPRIETARY INFORMATION (e) HITACHI

-~ Entergy.

THE POW" R O f PE OP lf 'M

8 2-Out-Of-4 Voter Logic

{3}))

((

GEH PROPRIETARY INFORMATION (e) HITACHI

-~ Entergy.

THE POW" R O f PE OP lf 'M

9 NMS-to-PRNM Comparison Current NM System LPRM Subsystem 44 LPRM strings, 176 LPRM signals APRM Subsystem 8 APRM channels 22 LPRM input signals to each APRM channel 8 outputs to RPS PRNM System

((

{3}))

GEH PROPRIETARY INFORMATION

10 NMS-to-PRNM Comparison (contd)

Current NM System Flow Subsystem 4 channels, 8 transmitters Option E-I-A Subsystem Period-Based Detection System (PBDS)

PRNM System GEH PROPRIETARY INFORMATION

{3}))

((

11 RAI Nos. 1 & 6 Changes to GGNS PRNM System platform from PRNM LTR BWR/6 design platform described in the PRNM LTR Describe PRNM System platform Identify differences between platform described in the PRNM LTR and GGNS-specific platform and reconcile

12 BWR/6 PRNM Panel Layouts

((

{3}))

(e) HITACHI

-~ Entergy.

THE POW" R O f PE OP lf 'M

13 RAI No. 2 Confirm plant requirements are met Review UFSAR to identify requirements for current APRM subsystem Compare to codes and standards specified in the PRNM LTR Revise Attachment 2 to reflect information (similar to MNGP approach)

14 RAI No. 3 Address software common-cause failure

PRNM software currently licensed for use via PRNM LTR

GGNS application same as other plants with PRNM System

Over 90 reactor-years of safe operation

Software functions thoroughly tested during the Factory Acceptance Test prior to installation

15 Plants with PRNM System Domestic

Hatch 1, 2

Browns Ferry 1, 2, 3

Nine Mile Point 2

Fermi 2

Peach Bottom 2, 3

Limerick 1, 2

Brunswick 1, 2

Susquehanna 1, 2

Monticello Foreign

Laguna Verde 1, 2

KKM

Santa Maria de Garona

Chinshan 1

Forsmark 1, 2, 3

16 RAI No. 4 Define data communications Developed compliance matrix per ISG-04; to be provided in the response Architecture diagram depicts data communication

17 PRNM System Architecture Diagram

((

{3}))

(e) HITACHI

-~ Entergy.

THE POW" R O f PE OP lf 'M

18 RAI No. 5 Document equipment EQ activities and confirm

Document EQ conditions in Attachment 2 Compare GGNS parameters with PRNM LTR

Equipment qualification performed as part of the Engineering Change process Performed after fabrication and prior to installation (~ 4th quarter 2010)

Documented in a Qualification Summary Report

Propose a License Condition to provide the report to NRC prior to startup from the 2012 refueling outage

19 RAI No. 7 Human Factors - Maintain current interface feel PRNM data to be presented on flat screen monitors currently used by control room operators Human Factors Evaluation (HFE) to be performed following design completion

(~ 4th quarter 2010)

Propose a License Condition to provide the report to NRC prior to startup from the 2012 refueling outage

20 RAI No. 8 Failure Rate Data Updating Table F.2 of the PRNM LTR to specifically reflect BWR/6 design; to be included in the response

21 RAI No. 9 Administrative Controls Access to GGNS Control Room granted via keycard

((

{3}))

Considering physical barriers (e.g.,

locking bars covering module controls)

Will develop a procedure to address access controls

22 RAI No. 10 Setpoint Methodology Setpoint calculations based on GEH methodology approved by NRC Establishes:

((

{3}))

Representative calculation available for review GEH PROPRIETARY INFORMATION

23 Closing Remarks (e) HITACHI