- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting
|
MONTHYEARGNRO-2009/00022, 2009-03 - NRC Written Examination Grade Report in Accordance with NUREG 1021, Revision 92009-03-0909 March 2009 2009-03 - NRC Written Examination Grade Report in Accordance with NUREG 1021, Revision 9 Project stage: Request ML0931404632009-11-0303 November 2009 License Amendment Request Regarding Power Range Neutron Monitoring System Upgrade Project stage: Request ML0934100662009-12-10010 December 2009 Acceptance Review of License Amendment Request for Power Range Neutron Monitoring System - Includes Revised Schedule for Completion Based on Late Submittal Project stage: Acceptance Review ML0931707702009-12-10010 December 2009 Request for Withholding Information from Public Disclosure - 10/1/2009 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC Project stage: Withholding Request Acceptance ML1000703852010-01-15015 January 2010 Request for Additional Information, License Amendment Request for Power Range Neutron Monitoring System Project stage: RAI ML1004308252010-02-0808 February 2010 Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1010902452010-04-22022 April 2010 Request for Additional Information Power Range Neutron Monitoring System Project stage: RAI ML1011901252010-05-0404 May 2010 Request for Additional Information, Round 3, License Amendment Request for Power Range Neutron Monitoring System Project stage: RAI ML1013805412010-05-17017 May 2010 Entergy Operations, Inc. - E-mail Attaching EOI and GE-Hitachi Nuclear Energy Presentation Slides and Affidavit Related to Meeting on May 25, 2010 Regarding Grand Gulf Nuclear Station, Unit 1 Project stage: Meeting ML1013805152010-05-17017 May 2010 GE-Hitachi Nuclear Energy Americas LLC Affidavit of Edward Schrull Request to Withhold from Public Disclosure, Enclosure 1 to GEH Letter GG-PRNM-168777-EC065, Grand Gulf Prnm Upgrade Project - Presentation for May 25, 2010, NRC Meeting Project stage: Meeting ML1014100942010-05-18018 May 2010 Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1013805592010-05-24024 May 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1013804212010-05-25025 May 2010 Entergy Operations, Inc. and GE-Hitachi Nuclear Energy Slide Presentation for May 25, 2010 - NRC RAIs Regarding GGNS Prnm System LAR (Non-Proprietary) Project stage: Other ML1014703852010-05-25025 May 2010 Licensee Slides from 5/25/10 Meeting to Discuss Response to Requests for Additional Information on License Amendment Request for Digital Power Range Neutron Monitoring System (Nonproprietary Version) Project stage: Response to RAI ML1014704032010-05-25025 May 2010 Affidavit for 5/25/10 NRC Meeting to Discuss Response to Requests for Additional Information on License Amendment Request for Digital Power Range Neutron Monitoring System Project stage: Response to RAI GNRO-2010/00040, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2010-06-0303 June 2010 Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1015202692010-06-0909 June 2010 5/25/2010 Summary of Meeting with Entergy Operations, Inc., to Discuss the Licensees Response to NRC Staffs Request for Additional Information Dated 5/4/2010 Installation of a Digital Power Range Neutron Monitoring System Project stage: RAI ML1018001492010-06-18018 June 2010 Schedule for Responding to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Request ML1017904372010-06-30030 June 2010 0000-0102-0888-RI, Plant-Specific Responses Required by Numac Prnm Retrofit Plus Option III Stability Trip Function Topical Report, (NEDC-3241OP-A) Project stage: Other ML1016703442010-07-0202 July 2010 Request for Withholding Information from Public Disclosure - GE-Hitachi Nuclear Energy Americas LLC Affidavit Dated 6/2/2010 Project stage: Withholding Request Acceptance ML1021500292010-07-29029 July 2010 Responses to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1021404062010-08-10010 August 2010 Request for Withholding Information from Public Disclosure, E. Schrull, GE-Hitachi Nuclear Energy Americas LLC Affidavit Dated 7/23/2010 Project stage: Withholding Request Acceptance GNRO-2010/00064, Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2010-09-29029 September 2010 Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1027307312010-10-14014 October 2010 Request for Withholding Information from Public Disclosure, 9/28/2010 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC Project stage: Withholding Request Acceptance GNRO-2010/00075, Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2010-12-13013 December 2010 Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI GNRO-2010/00070, Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2010-12-14014 December 2010 Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1111704242011-04-27027 April 2011 E-mail, Request for Additional Information, Round 4, License Amendment Request for Power Range Neutron Monitoring System Project stage: RAI ML1111704322011-04-27027 April 2011 Request for Additional Information, Round 4, License Amendment Request for Power Range Neutron Monitoring System Project stage: RAI GNRO-2011/00032, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-05-0303 May 2011 Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1113204932011-05-12012 May 2011 E-mail, Request for Additional Information, Round 5, License Amendment Request for Power Range Neutron Monitoring System Project stage: RAI GNRO-2011/00038, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-05-16016 May 2011 Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI GNRO-2011/00039, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-05-26026 May 2011 Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI GNRO-2011/00042, Responses to NRC Requests for Additional Information Re License Amendment Request for Power Range Neutron Monitoring System2011-05-31031 May 2011 Responses to NRC Requests for Additional Information Re License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1113905962011-06-0202 June 2011 Request for Withholding Information from Public Disclosure, 4/28/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00032 Project stage: Withholding Request Acceptance ML1113906562011-06-0202 June 2011 Request for Withholding Information from Public Disclosure, 5/11/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00038 Project stage: Withholding Request Acceptance GNRO-2011/00044, Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-06-13013 June 2011 Responses to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI ML1117402132011-06-23023 June 2011 Email, Request for Additional Information, Round 6, License Amendment Request for Power Range Neutron Monitoring System Project stage: RAI GNRO-2011/00045, Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-06-28028 June 2011 Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Supplement GNRO-2011/00057, Response to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-07-22022 July 2011 Response to NRC Requests for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI GNRO-2011/00066, Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-09-28028 September 2011 Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI GNRO-2011/00089, Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System2011-10-18018 October 2011 Response to NRC Request for Additional Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System Project stage: Response to RAI GNRO-2011/00090, Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System (TAC No. ME2531) - Software Evaluation Report2011-10-26026 October 2011 Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System (TAC No. ME2531) - Software Evaluation Report Project stage: Supplement GNRO-2011/00091, Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System (TAC No. ME2531) – V&V Summary Test Report2011-11-0808 November 2011 Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System (TAC No. ME2531) – V&V Summary Test Report Project stage: Supplement GNRO-2011/00110, Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System (TAC No. ME2531) – V&V Summary Test Report2011-12-0101 December 2011 Supplemental Information Pertaining to License Amendment Request for Power Range Neutron Monitoring System (TAC No. ME2531) – V&V Summary Test Report Project stage: Supplement ML1204406022012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 5/19/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00039 Project stage: Withholding Request Acceptance ML1204406602012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 11/29/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00110 Project stage: Withholding Request Acceptance ML1204406532012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 11/3/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00091 Project stage: Withholding Request Acceptance ML1204406462012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 10/20/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00090 Project stage: Withholding Request Acceptance ML1204406382012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 9/22/2011 Affidavit Executed by J. Harrison, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00066 Project stage: Withholding Request Acceptance ML1204406272012-02-27027 February 2012 Request for Withholding Information from Public Disclosure, 7/21/2011 Affidavit Executed by E. Schrull, GE-Hitachi Nuclear Energy Americas LLC, Attachment 1 to GNRO-2011/00057 Project stage: Withholding Request Acceptance 2010-07-29
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 22, 2010 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: POWER RANGE NEUTRON MONITORING SYSTEM (TAC NO. ME2531)
Dear Sir or Madam:
By application dated November 3, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093140463), Entergy Operations, Inc. (Entergy, the licensee), requested U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to the Grand Gulf Nuclear Station, Unit 1, Technical Specifications to reflect installation of the digital General Electric - Hitachi Nuclear Measurement Analysis and Control Power Range Neutron Monitoring System.
The NRC staff reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were discussed with Mr. G. Davant, et aI., of your staff on April 12, 2010. Please provide a response to the enclosed questions within 30 days of the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at fred./yon@nrc.gov.
Sincerely, CF~
Carl. F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION POWER RANGE NUCLEAR MONITORING SYSTEM UPGRADE GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416 By application dated November 3, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093140463), Entergy Operations, Inc. (the licensee),
requested U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to the Grand Gulf Nuclear Station, Unit 1 (GGNS), Technical Specifications (TSs) to reflect installation of the digital General Electric - Hitachi Nuclear Measurement Analysis and Control Power Range Neutron Monitoring (PRNM) System. The NRC staff requests the following additional information from the licensee to complete its review of the proposed application.
- 1.
In its application dated November 3, 2009, the licensee stated that the Oscillation Power Range Monitor (OPRM) Upscale function will not be relied upon to mitigate a stability event during the initial OPRM Monitoring Period (for a minimum of 90 days not to exceed one fuel cycle after plant startup following the 2012 refueling outage) and GGNS will implement Backup Stability Protection (BSP) measures specified in Boiling Water Reactor Owners' Group (BWROG) document OG-02-0119-260, GE to BWROG Detect and Suppress II Committee, "Backup Stability Protection (BSP) for Inoperable Option III Solution," as an alternate method for detecting and suppressing instabilities until the OPRM Monitoring Period has been successfully completed.
Please provide: (1) a description of the alternate method for detection and suppression of instabilities proposed in the application with respect to the approach stated in BWROG document OG-02-0119-260; (2) identification of the differences between the proposed alternate method and the Interim Corrective Actions specified in NRC Bulletin 88-07, "Power Oscillations in Boiling Water Reactors (BWRs)," dated June 15, 1988; (3) a description of which option is to be taken in compliance with five stability controls outlined in BWROG document OG-02-0119-260 when deliberate entry into the Controlled Entry Region occurs, and its analysis basis to confirm compliance; and (4) the reason to take more than 90 days (up to one fuel cycle) to activate the OPRM system for GGNS, when there are more than 90 reactor years of fully-armed operational data already available for OPRM system.
- 2.
Please provide, in detail, the action to be taken (if applicable, to GGNS) should an error occur in the Global Nuclear Fuel-Americas (GNF-A) 3D MONICORE (30M) software with application of a generic constant 10 percent bypass flow assumption in the BWROG's methodology to calculate the Boiling Boundary (BB) which can lead to an error in the calculation of the BB value which would be non-conservative with regard to stability.
- 3.
Please provide a description for the proposed PRNM system design features other than an OPRM capability such as Detect and Suppress Solution - Confirmation Density and a Enclosure
- 2 future plan to implement extended power uprate in conjunction with the Maximum Extended Load Line Limit Analysis Plus (MELLLA+) for GGNS.
- 4.
Please provide a realistic schedule to implement Option III stability solution for GGNS including an upgrade of the simulator for operator training.
- 5.
Please identify which cycle-specific parameters specified in TS 5.6.5.a will be supported by the proposed two approved methodologies for TS 5.6.5.b. According to guidance in NRC Generic Letter (GL) 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications," dated October 3, 1988, all the approved methodologies listed in TS 5.6.5.b should: (1) identify which cycle-specific parameters listed in TS 5.6.5.a corresponding to approved methods are used to calculate the parameters; and (2) identify the revision or date of approval, if applicable, for the methodologies listed in TS 5.6.5.b. In accordance with GL 88-16, please provide, as necessary, the revised TS 5.6.5.a and TS 5.6.5.b for NRC staff review.
April 22, 2010 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUB..IECT:
GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION RE: POWER RANGE NEUTRON MONITORING SYSTEM (TAC NO. ME2531)
Dear Sir or Madam:
By application dated November 3, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093140463), Entergy Operations, Inc. (Entergy, the licensee), requested U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to the Grand Gulf Nuclear Station, Unit 1, Technical Specifications to reflect installation of the digital General Electric - Hitachi Nuclear Measurement Analysis and Control Power Range Neutron Monitoring System.
The NRC staff reviewed the information provided in your application and determined that additional information is required in order to complete its review. The enclosed questions were discussed with Mr. G. Davant, et aL, of your staff on April 12, 2010. Please provide a response to the enclosed questions within 30 days of the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at 301-415-2296 or via e-mail at fred.lyon@nrc.gov.
Sincerely, IRA!
Carl. F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION: