1 WBN2Public Resource From:
Wiebe, Joel Sent:
Wednesday, April 21, 2010 12:59 PM To:
'Stegen, Amanda'; 'Keller, Tonya K' Cc:
WBN2HearingFile Resource; Beissel, Dennis; 'Krieg, Rebekah'
Subject:
RE: RAI Response Sorry, we don't have electronic copies. The only paper copy is with our ADAMS folks who are diligently processing it into the electronic files.
From: Stegen, Amanda [1]
Sent: Wednesday, April 21, 2010 12:48 PM To: Wiebe, Joel; Keller, Tonya K Cc: WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah
Subject:
RE: RAI Response
ThanksJoel,
Iappreciateyousendingthisalong,itwillbehelpful.TVAsubmitted18attachmentswiththeRAIletter.Itappearsthe motiontodismisshasoneoftheseattachments(listofconsultations,permitsetc),butdoesnotincludetheother17 attachments(seelistbelow).IsthereanywaytosendaCDwiththeseattachments?
- Thanks,
Amanda
Attachments to Enclosure 1:
- 1. Groundwater Investigation Report, Watts Bar Nuclear Plant, Spring City, Tennessee, Prepared by ARCADIS G&M Inc. for TVA, August 2004
- 2. 2. Table G-5, Federal, State, and Local Authorizations (COMPLETE - ATTACHED TO THE PETITION TO DISMISS CONTENTION 1)
- 3. 3. TVA Nuclear Power Group (NPG) Calculation WBNTSR-008 R11, Control Room Operator and Offsite Doses Due to a Steam Generator Tube Rupture
- 4. FENCDOSE Run, Time Dependent Releases, 21 uCi/g I-131 equivalent preaccident Iodine spiking case (TSR8F11Aout.txt)
- 5. FENCDOSE Run, Time Dependent Releases, 0.265 uCi/g I-131 equivalent accident initiate Iodine spike case (TSR8FBout.txt)
- 6. TVA NPG Calculation WBNTSR-009 R11, Control Room Operator and Offsite Doses from a Fuel Handling Accident
- 7. TVA NPG Calculation WBNTSR-080 R6, Control Room Operator and Offsite Doses Due to a Loss of AC Power
- 8. FENCDOSE File, Time Dependent Releases, realistic case (TSR80FA6.txt)
- 9. FENCDOSE File, Time Dependent Releases, 1% failed fuel case (TSR80FB6.txt)
2
- 10. TVA NPG Calculation WBNAPS3-077 R11, Offsite and Control Room Operator Doses Due to a Main Steam Line Break
- 11. FENCDOSE Run, Time Dependent Releases, preaccident 21 uCi/gm I-131 equivalent case (APS77F10A.txt)
- 12. FENCDOSE Run, Time Dependent Releases, 0.265 uCi/gm I-131 accident initiated Iodine spike (APS77F10B.txt)
- 13. TVA NPG Calculation WBNTSR-064 R8, Offsite and Control Room Operator Doses Due to a Waste Gas Decay Tank Rupture
- 14. TVA NPG Calculation TI-RPS-197 R21, Offsite Doses Due to a Regulatory Guide 1.4 Loss of Coolant Accident
- 15. Met files used in the ARCON96 X/Q calculations
- 16. 1976 TVA Report, Impingement at Watts Bar Steam Plant
- 17. Table 3-7, Total Numbers of Each Native Mussel Species Collected During Preoperational (1983-1994) and Operational (1996-1997) Surveys Near Watts Bar Nuclear Plant
- 18. Appendix A-2, Results of 14 Native Mussel Surveys at 12 Sites in the Vicinity of Watts Bar Nuclear Plant, 1983-1997
From: Wiebe, Joel [2]
Sent: Wednesday, April 21, 2010 4:55 AM To: Stegen, Amanda; Keller, Tonya K Cc: WBN2HearingFile Resource; Beissel, Dennis
Subject:
RE: RAI Response
Amanda/Tonya, TVA has filed a motion to dismiss contention 1 based on the April 9, 2010, submittal. The enclosures to the April 9, 2010, submittal appear to be included at the end of the attached document.
Joel From: Stegen, Amanda [3]
Sent: Tuesday, April 20, 2010 12:22 PM To: Wiebe, Joel; Keller, Tonya K; Imboden, Andy Cc: WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah; Bryce, Robert W; Cort, Katherine A
Subject:
RE: RAI Response
ThanksJoel,
ManyoftheRAIresponsesTVAsubmittedrefertotheattachments,sothesoonerwegetthemthebetter.Staffhave beenreviewingtheletterthatTVAsentandtherearesomequestions/clarificationsthathavecomeup.Oncewereview thewholepackage,wewouldliketoscheduleacallwithTVAtodiscusssomeoftheitems.Atthistime,Iknowwewill needtodiscussafewhydrology,landuse,andaquaticquestions.Onceweseetherestofthesubmittal,theremaybea fewmoreareasthatneedclarification,butwewillletyouknow.
- Thanks,
Amanda
3
From: Wiebe, Joel [4]
Sent: Tuesday, April 20, 2010 8:31 AM To: Keller, Tonya K; Imboden, Andy Cc: Stegen, Amanda; WBN2HearingFile Resource
Subject:
RE: RAI Response
This is another large hardcopy submittal. It will take some time for the attachments to be processed into ADAMS.
From: Keller, Tonya K [5]
Sent: Monday, April 19, 2010 12:30 PM To: Wiebe, Joel; Imboden, Andy Cc: Stegen, Amanda
Subject:
FW: RAI Response
JoelandAndy,
IunderstandthatDennisisoutthisweek,caneitherofyoupleasecheckonthisforme.Weneedtheattachmentsthat gowiththeRAIresponse.
- Thanks,
Tonya Keller Program Specialist Pacific Northwest National Laboratory
From: Stegen, Amanda Sent: Friday, April 16, 2010 9:30 AM To: Beissel, Dennis; Keller, Tonya K; Krieg, Rebekah Cc: Bryce, Robert W
Subject:
RE: RAI Response
- HiDennis,
DoyouhavealltheattachmentsthatgowiththisRAIresponse?Thisisonlypartofthesubmittalandmanyofthe responsesreferencetheattachments.Iwillcheckwiththeteamabouttheavailabilitytheweekofthe24thandgetback toyou.ItlookslikeTVAhasansweredallthequestions,withtheexceptionofH16,whichtheysaytheywillhaveto NRCbyApril23rd.Iwillalsosendtheseouttotheteamtohavethemcheckoncompletenessoftheresponses.Iwilllet youknowifweneedclarificationonanyoftheRAIresponses.
Thanks-
Amanda
From: Beissel, Dennis [6]
Sent: Friday, April 16, 2010 6:35 AM To: Stegen, Amanda; Keller, Tonya K; Krieg, Rebekah Cc: Bryce, Robert W
Subject:
FW: RAI Response
4 Is this the remainder of what we need? Can we do the writing session the week of May 24th??
From: Milano, Patrick Sent: Friday, April 16, 2010 8:08 AM To: Beissel, Dennis Cc: Wiebe, Joel; WBN2HearingFile Resource
Subject:
RAI Response
In case you haven't seen this yet.
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
10 Mail Envelope Properties (F371D08C516DE74F81193E6D891DC4AF304C3114B5)
Subject:
RE: RAI Response Sent Date:
4/21/2010 12:58:34 PM Received Date:
4/21/2010 12:58:36 PM From:
Wiebe, Joel Created By:
Joel.Wiebe@nrc.gov Recipients:
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Beissel, Dennis" <Dennis.Beissel@nrc.gov>
Tracking Status: None
"'Krieg, Rebekah'" <rebekah.krieg@pnl.gov>
Tracking Status: None
"'Stegen, Amanda'" <Amanda.Stegen@pnl.gov>
Tracking Status: None
"'Keller, Tonya K'" <Tonya.Keller@pnl.gov>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 6410 4/21/2010 12:58:36 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: