1 WBN2Public Resource From:

Stegen, Amanda [Amanda.Stegen@pnl.gov]

Sent:

Wednesday, April 28, 2010 5:54 PM To:

Wiebe, Joel; Keller, Tonya K Cc:

WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah

Subject:

RE: RAI Response ThanksJoel-

Welookforwardtogettingtheinformation.ItwouldbegreattogetacopyoftheCDwhenyoureceiveit.

Amanda

From: Wiebe, Joel [1]

Sent: Wednesday, April 28, 2010 1:47 PM To: Stegen, Amanda; Keller, Tonya K Cc: WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah

Subject:

RE: RAI Response

Per the attached e-mail it will be available in ADAMS on 5/3. I have also requested a CD of the attachments from TVA, which I should get tomorrow.

Joel From: Stegen, Amanda [2]

Sent: Wednesday, April 28, 2010 3:54 PM To: Wiebe, Joel; Keller, Tonya K Cc: WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah

Subject:

RE: RAI Response

HiJoel,

Iwaswonderingifyouhadanyideasaboutwhenwemightgettheseattachments.IknowtheADAMspeoplewere workingongettingthemprocessed,butIdidntknowiftheyhadfinishedupornot.

Thanks,

Amanda

From: Wiebe, Joel [3]

Sent: Wednesday, April 21, 2010 9:59 AM To: Stegen, Amanda; Keller, Tonya K Cc: WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah

Subject:

RE: RAI Response

Sorry, we don't have electronic copies. The only paper copy is with our ADAMS folks who are diligently processing it into the electronic files.

From: Stegen, Amanda [4]

Sent: Wednesday, April 21, 2010 12:48 PM To: Wiebe, Joel; Keller, Tonya K

2 Cc: WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah

Subject:

RE: RAI Response

ThanksJoel,

Iappreciateyousendingthisalong,itwillbehelpful.TVAsubmitted18attachmentswiththeRAIletter.Itappearsthe motiontodismisshasoneoftheseattachments(listofconsultations,permitsetc),butdoesnotincludetheother17 attachments(seelistbelow).IsthereanywaytosendaCDwiththeseattachments?

Thanks,

Amanda

Attachments to Enclosure 1:

1. Groundwater Investigation Report, Watts Bar Nuclear Plant, Spring City, Tennessee, Prepared by ARCADIS G&M Inc. for TVA, August 2004
2. 2. Table G-5, Federal, State, and Local Authorizations (COMPLETE - ATTACHED TO THE PETITION TO DISMISS CONTENTION 1)
3. 3. TVA Nuclear Power Group (NPG) Calculation WBNTSR-008 R11, Control Room Operator and Offsite Doses Due to a Steam Generator Tube Rupture
4. FENCDOSE Run, Time Dependent Releases, 21 uCi/g I-131 equivalent preaccident Iodine spiking case (TSR8F11Aout.txt)
5. FENCDOSE Run, Time Dependent Releases, 0.265 uCi/g I-131 equivalent accident initiate Iodine spike case (TSR8FBout.txt)
6. TVA NPG Calculation WBNTSR-009 R11, Control Room Operator and Offsite Doses from a Fuel Handling Accident
7. TVA NPG Calculation WBNTSR-080 R6, Control Room Operator and Offsite Doses Due to a Loss of AC Power
8. FENCDOSE File, Time Dependent Releases, realistic case (TSR80FA6.txt)
9. FENCDOSE File, Time Dependent Releases, 1% failed fuel case (TSR80FB6.txt)
10. TVA NPG Calculation WBNAPS3-077 R11, Offsite and Control Room Operator Doses Due to a Main Steam Line Break
11. FENCDOSE Run, Time Dependent Releases, preaccident 21 uCi/gm I-131 equivalent case (APS77F10A.txt)
12. FENCDOSE Run, Time Dependent Releases, 0.265 uCi/gm I-131 accident initiated Iodine spike (APS77F10B.txt)
13. TVA NPG Calculation WBNTSR-064 R8, Offsite and Control Room Operator Doses Due to a Waste Gas Decay Tank Rupture
14. TVA NPG Calculation TI-RPS-197 R21, Offsite Doses Due to a Regulatory Guide 1.4 Loss of Coolant Accident
15. Met files used in the ARCON96 X/Q calculations

3

16. 1976 TVA Report, Impingement at Watts Bar Steam Plant
17. Table 3-7, Total Numbers of Each Native Mussel Species Collected During Preoperational (1983-1994) and Operational (1996-1997) Surveys Near Watts Bar Nuclear Plant
18. Appendix A-2, Results of 14 Native Mussel Surveys at 12 Sites in the Vicinity of Watts Bar Nuclear Plant, 1983-1997

From: Wiebe, Joel [5]

Sent: Wednesday, April 21, 2010 4:55 AM To: Stegen, Amanda; Keller, Tonya K Cc: WBN2HearingFile Resource; Beissel, Dennis

Subject:

RE: RAI Response

Amanda/Tonya, TVA has filed a motion to dismiss contention 1 based on the April 9, 2010, submittal. The enclosures to the April 9, 2010, submittal appear to be included at the end of the attached document.

Joel From: Stegen, Amanda [6]

Sent: Tuesday, April 20, 2010 12:22 PM To: Wiebe, Joel; Keller, Tonya K; Imboden, Andy Cc: WBN2HearingFile Resource; Beissel, Dennis; Krieg, Rebekah; Bryce, Robert W; Cort, Katherine A

Subject:

RE: RAI Response

ThanksJoel,

ManyoftheRAIresponsesTVAsubmittedrefertotheattachments,sothesoonerwegetthemthebetter.Staffhave beenreviewingtheletterthatTVAsentandtherearesomequestions/clarificationsthathavecomeup.Oncewereview thewholepackage,wewouldliketoscheduleacallwithTVAtodiscusssomeoftheitems.Atthistime,Iknowwewill needtodiscussafewhydrology,landuse,andaquaticquestions.Onceweseetherestofthesubmittal,theremaybea fewmoreareasthatneedclarification,butwewillletyouknow.

Thanks,

Amanda

From: Wiebe, Joel [7]

Sent: Tuesday, April 20, 2010 8:31 AM To: Keller, Tonya K; Imboden, Andy Cc: Stegen, Amanda; WBN2HearingFile Resource

Subject:

RE: RAI Response

This is another large hardcopy submittal. It will take some time for the attachments to be processed into ADAMS.

From: Keller, Tonya K [8]

Sent: Monday, April 19, 2010 12:30 PM To: Wiebe, Joel; Imboden, Andy Cc: Stegen, Amanda

Subject:

FW: RAI Response

4

JoelandAndy,

IunderstandthatDennisisoutthisweek,caneitherofyoupleasecheckonthisforme.Weneedtheattachmentsthat gowiththeRAIresponse.

Thanks,

Tonya Keller Program Specialist Pacific Northwest National Laboratory

From: Stegen, Amanda Sent: Friday, April 16, 2010 9:30 AM To: Beissel, Dennis; Keller, Tonya K; Krieg, Rebekah Cc: Bryce, Robert W

Subject:

RE: RAI Response

HiDennis,

DoyouhavealltheattachmentsthatgowiththisRAIresponse?Thisisonlypartofthesubmittalandmanyofthe responsesreferencetheattachments.Iwillcheckwiththeteamabouttheavailabilitytheweekofthe24thandgetback toyou.ItlookslikeTVAhasansweredallthequestions,withtheexceptionofH16,whichtheysaytheywillhaveto NRCbyApril23rd.Iwillalsosendtheseouttotheteamtohavethemcheckoncompletenessoftheresponses.Iwilllet youknowifweneedclarificationonanyoftheRAIresponses.

Thanks-

Amanda

From: Beissel, Dennis [9]

Sent: Friday, April 16, 2010 6:35 AM To: Stegen, Amanda; Keller, Tonya K; Krieg, Rebekah Cc: Bryce, Robert W

Subject:

FW: RAI Response

Is this the remainder of what we need? Can we do the writing session the week of May 24th??

From: Milano, Patrick Sent: Friday, April 16, 2010 8:08 AM To: Beissel, Dennis Cc: Wiebe, Joel; WBN2HearingFile Resource

Subject:

RAI Response

In case you haven't seen this yet.

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

6 Mail Envelope Properties (92F211CFD9586C4B9AC51FA33071B0FE017B96A1BDBB)

Subject:

RE: RAI Response Sent Date:

4/28/2010 5:53:33 PM Received Date:

4/28/2010 5:53:36 PM From:

Stegen, Amanda Created By:

Amanda.Stegen@pnl.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Beissel, Dennis" <Dennis.Beissel@nrc.gov>

Tracking Status: None "Krieg, Rebekah" <rebekah.krieg@pnl.gov>

Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov>

Tracking Status: None "Keller, Tonya K" <Tonya.Keller@pnl.gov>

Tracking Status: None Post Office:

EMAIL04.pnl.gov Files Size Date & Time MESSAGE 7661 4/28/2010 5:53:36 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: