DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS Date: 04/20/10 PRIORITY OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK101100052

1) 02546 WC LIBRARY - MG01WC
2) 03044 MCG DOC CNTRL MISC MAN MG05DM Duke Energy QA CONDITION D] Yes
  • No
3) 03379 D E CALDWELL MG01MM
4) 03447 HARRY J SLOAN MG01 RP DOCUMENT TRANSMITTAL FORM OTHER ACKNOWLEDGEMENT REQUIRED
  • Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 03614 MCG OPS PROCEDURE GP MG010P ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE

6) 03744 OPS TRNG MGR. MG03OT
7) 03759 US NUC REG WASHINGTON, DC MCGUIRE NUCLEAR STATION Duke Energy
8) 04809 MCG PLANT ENG. LIBR. MG05SE McGuire
9) 05162 MCG SHIFT WORK MGRS MG01OP DCRM MGO2DM RECORD RETENTION # 581188
10) 09460 W C SPENCER MG01 RP 13225 Hagers Ferry Road
11) 09665 JON HTHOMPSON, USNRC Huntersville, N.C. 28078 SELECTED LICENSEE COMMITMENTS MANUAL (SLC)

Rec'd By Page 2 of 2 Date

_____ _____ _____ ~ t DOCUMENT NO QACOND REV #/ DATE DISTR CODE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 115 TOTAL SLC - LIST OF EFFECTIVE PAGES -NA 098 04/07/10 MADM-03A V1 vi V8 V2 vi 36 SLC MEMORANDUM NA 04/07/10 SLC 16.5.1 (ENTIRE SECTION) NA 115 04/07/10

___________________________________________ - J _____________ L _____________ t. ___ 1.___ I. ___ L ___ L___ ~ ___ C ___ C ___ C ___ ___ ________

REMARKS: PLEASE UPDATE ACCORDINGLY R T REPKO REPRO: 3 HOLE PUNCH / ONESIDED COPIES VICE PRESIDENT MCGUIRE NUCLEAR STATION RECIPIENT # 00422 PREVIOUSLY COMPLETED BY:

BIC BEAVER MG01RC BCB/TLC

~gID

April 7, 2010 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99 I

16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each. outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented, when steam generator nozzle dams are in Use or the RCS cold leg is open > 1 in 2.

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.


LJ I -- - - -- - - - -- - - - -- - - - -- - - -

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

il.

ý.

0 APPLICABILITY RCS level-< 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented. the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units I and 2 16.5,1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section). (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99

'I 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 .12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in2 .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.

-- - -- -- -NOTE---- ----------- 7---------

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

- 7- - - - - -

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented, the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM 4

To: All McGuire Nuclear Station SelectedLicensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99 I

16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.


---- ----- ---- ---- ---- I Uk


r-------------------------------------------

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented, the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM To: All McGuireNuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99 I

16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED. LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 ", 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 Revision 98

Inventory Control-Reduced Inventory Operation

,16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each outage schedule thatinvolves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in2 .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.

NOTE ----------------------

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented, the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC i6.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99 I

16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 w 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in2 .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.

NOTE ----------------------

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented, the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, 'are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99 I

16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0' 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLM ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5- REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99

.16.11.19 REVISIONO0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used -Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 22Reion9 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in2 .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.

- ------------------------------------------ ,'ILJ ..............................

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

\ ,----.,

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented, the required hot leg vent path.

AND A.2' Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION REVISION 115 0

0308/10 12/14/99 I

16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 ';

16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in2 .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.


I'J r-- -- - - - - - - - - - - - - - - - - - - -

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented. the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating, ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99 I

16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

SELECTED LICENSEE. COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 -,* REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT A detailed review of each outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in2 .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.

NOTE ----------------------

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented. the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115

April 7, 2010 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 97) List of Effective Sections (Rev 98)

SLC 16.5.1 (entire section) (Rev 82) SLC 16.5.1 (entire section) (Rev 115)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 90 3/13/07 16.3 REVISION 48 7/31/03 16.4 Not Issued 16.5.1 16.5.2 REVISION 115 REVISION 0 0308/10 12/14/99 I

16.5.3 REVISION 0- 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 REVISION 0 12/14/99 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 38 4/9/03 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED 6/11/03 16.6.3 REVISION 61 04/07/05 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 0 12/14/99 16.7.2 REVISION 80 10/1/05 16.7.3 REVISION 0 12/14/99 16.7.4 REVISION 1 4/11/00 16.7.5 REVISION 0 12/14/99 16.7.6 REVISION 103 12/03/08 16.7.7 REVISION 0 12/14/99 16.7.8 REVISION 77 10/12/05 16.7.9 REVISION 97 10/06/08 16.7.10 REVISION 0 12/14/99 16.7.11 REVISION 71 05/25/05 16.8.1 REVISION 98 11/1/07 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 65 12/21/04 16.9.1 REVISION 53 1/13/04 16.9.2 REVISION 81 6/15/06 16.9.3 REVISION 106 05/26/09 16.9.4 REVISION 83 7/12/06 16.9.5 REVISION 81 6/15/06 16.9.6 REVISION 107 5/18/09 16.9.7 REVISION 113 10/12/09 16.9.8 REVISION 96 9/10/07 16.9.9 REVISION 101 4/02/08 16.9.10 REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 16.9.13 Not Used - Rev 13 2/26/01 McGuire Units 1 and 2 I Revision 98

ftt~ i~8! ii SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 100 3/11/08 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 102 9/3/08 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 88 1/17/07 16.9.24 Not Used - Rev 74 6/20/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 84 7/19/06 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 0 12/14/99 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 84 7/19/06 16.11.8 REVISION 0  : 12/14/99 1 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 0 12/14/99 16.11.11 REVISION 41 8/21/03 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 1 4/11/00 16.11.17 REVISION 110 8/20/09 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 Not Used - Rev 75 8/05 16.13.3 Not Used - Rev 75 8/05 16.13.4 REVISION 58 5/11/04 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 Revision 98

Inventory Control-Reduced Inventory Operation 16.5.1 16.5 REACTOR COOLANT SYSTEM (RCS) 16.5.1 Inventory Control-Reduced Inventory Operation COMMITMENT -A detailed review of each outage schedule that involves operation at reduced inventory shall be conducted looking at evolutions which could perturb the RCS.

AND The RCS shall be properly vented when steam generator nozzle dams are in use or the RCS cold leg is open > 1 in2 .

AND The reactor shall be subcritical for at least 7 days, or as specified in Design Study CNDS-0242, or MGDS-0228/CNDS-0218.

NOTE ----------------------

Activities that could perturb the RCS during reduced inventory operation shall require prior notification of the operations shift manager.

APPLICABILITY RCS level < 60 inches (wide range) with irradiated fuel in the core.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RCS not properly A.1 Initiate action to provide Immediately vented, the required hot leg vent path.

AND A.2 Suspend all activities that Immediately could perturb RCS level or which may reduce the reliability of the operating ND loop.

McGuire Units 1 and 2 16.5.1-1 Revision 115

Inventory Control-Reduced Inventory Operation 16.5.1 TESTING REQUIREMENTS None BASES Generic Letter 88-17 and NUREG 1410 involve concerns associated with a loss of Residual Heat Removal (RHR) during RCS reduced inventory. Numerous events have occurred in the industry that resulted in a loss of RHR during reduced inventory operation. This is of great concern due to the potential for substantial core damage occurring in a relatively short time period. This SLC depicts those commitments that are extremely important to nuclear safety, however, are not presently covered by Technical Specifications.

Under the stated APPLICABILITY, when EITHER steam generator nozzle dams are in use OR the RCS cold leg side is opened with total opening of one square inch or greater, a hot leg vent path is required. The vent path may be satisfied by:

1. Hot leg nozzle dam not installed on the vented loop AND Removal of either of the following on the vented loop:
a. Hot leg diaphragm and manway OR
b. Cold leg diaphragm and manway (with associated cold leg nozzle dam installed*)

OR

2. Reactor vessel head is removed.
  • Installation of the associated cold leg nozzle dam avoids diversion of makeup flow (injected via a cold leg nozzle) intended for the core.

REFERENCES

1. Generic Letter 88-17, Loss of Decay Heat Removal
2. NUREG 1410, Loss of Vital AC Power and Residual Heat Removal During Mid-Loop Operation at Vogtle Nuclear Station.
3. Integrated Scheduling Management Procedure 3.1, Outage Planning and Execution Responsibilities McGuire Units 1 and 2 16.5.1-2 Revision 115

Inventory Control-Reduced Inventory Operation 16.

5.1 REFERENCES

(continued)

4. McGuire Nuclear Station responses to GL 88-17, dated January 3, 1989, February 2, 1989, March 10, 1989 and February 24, 1993.
5. Nuclear Station Directive NSD-403, Shutdown Risk Management (Modes 4, 5, 6, and No-Mode) per 10 CFR 50. 65(a)(4).
6. Design Study CNDS-0242, Catawba and McGuire Nuclear Stations, Shutdown By Decay Heat Level Before Mid-Loop Operation, Safety Analysis, Nuclear Engineering, Nuclear Services.
7. Design Study MGDS-0228/CNDS-0218, McGuire/Catawba Nuclear Stations, Loss of Decay Heat Removal With Steam Generator Mitigation, Safety Analysis, Engineering Support Section, Design Engineering Department.
8. PIP M-08-05725.
9. PIP M-09-04863.

McGuire Units 1 and 2 16.5.1-3 Revision 115