ML101100396

From kanterella
Jump to navigation Jump to search
Revision of Technical Requirements Manual Unit 1
ML101100396
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/07/2010
From:
Susquehanna
To:
Office of Nuclear Reactor Regulation
References
028401, 2010-15062
Download: ML101100396 (41)


Text

(OfQA Apr.

07, 2010 HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-15062 USER INFORMATION:

Name: GERLACH*ROSE M EMPL#:028401 CA#:0363 Address: NUCSA2 Phone#:

254-3194 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSE M 04/06/2010 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM1 TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS ADD MANUAL TABLE OF CONTENTS DATE: 04/03/2010 DATE: 04/05/2010 CATEGORY:

DOCUMENTS ID:

TEXT 3.8.1 REMOVE:

REV:I TYPE: TRM1 ADD:

REV:

2 CATEGORY:

DOCUMENTS ID:

TEXT 3.8.3 REMOVE:

REV:0 TYPE:

TRM1 ADD:

REV:

1 CATEGORY:

ID:

TEXT SREMOVE:

DOCUMENTS TYPE:

TRM1 B3.3.10 REV:1 ADD:

REV:

2 C)

Cý?of A CATEGORY:

DOCUMENTS TYPE: TRM1 ID:

TEXT LOES ADD:

REV:

57 REMOVE:

REV:56 CATEGORY:

ID:

TEXT REMOVE:

DOCUMENTS TYPE: TRM1 TOC REV:16 ADD:

REV:

17 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED' WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date:

0 Procedure Name TEXT LOES

Title:

LIST OF EF]

4/05/2010 Rev 57 FECTIVE SECTIONS Issue Date 04/05/2010 Change ID Change Number TEXT TOC

Title:

17 04/05/2010 TABLE OF CONTENTS TEXT 1.1 0

11/18/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1

02/04/2005

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2

Title:

TEXT 3.0

Title:

8 02/12/2010 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE LDCN 4414 4

05/23/2008 TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 0

11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 5

04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 11 03/16/2010

Title:

CORE OPERATING LIMITS REPORT (COLR)

Page ~i of 15 Report Date: 04/05/10 Page 1 of.15 Report Date: 04/05/10

SSES MANU.AL~

Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1 0

11/18/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2

11/09/2007

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3. 3. 3

Title:

INSTRUMENTATION 2

11/09/2007 METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5

05/23/2008

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2

10/19/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1

11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3

04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION PageZ of 15 Report Date: 04/05/10 Page 2 of 15 Report Date: 04/05/10

SSES MANUJAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1

Title:

REACTOR TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 1

04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS' 2

04/17/2008 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1

04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1

11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING-INSTRUMENTATION TEXT 3.5.3 0

1 11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS:-

TEXT 3.6.1 0

11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/18/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 of

.15 Report Date: 04/05/10

SSES MANTUAIL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT 0

11/18/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN 0

11/18/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER.LEVEL 2

04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3

04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3

SYSTEMS C02 SYSTEMS 2

SYSTEMS HALON SYSTEMS 04/16/2009 04/16/2009 2

04/16/2009 SYSTEMS FIRE HOSE STATIONS 2

04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 7

01/20/2010 SYSTEMS FIRE DETECTION INSTRUMENTATION LDCN 3503 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0

11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 04/05/10 Page 4 of

.15 Report Date: 04/05/10

SSES MANTJAIL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.2

Title:

PLANT TEXT 3.7.5.3

Title:

PLANT TEXT 3.7. 6

Title:

PLANT 0

11/18/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1

04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2

06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7

Title:

PLANT SYSTEMS MONITORING 2

09/05/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION TEXT 3.7.8 4

06/21/2007

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12./14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 0

04,/16/2009

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 2

04/05/2010

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES LDCN 4760 TEXT 3.8.2.1 2

11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT 3.8.3 1

04/05/2010

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES Page 5 of 15 Report Date: 04/05/10

SSES MANUAL.

Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.4 0

11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5 0

11/18/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0

11/18/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 1

06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3..9.2 0

11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/18/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04./26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2 2

08/08/2006

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1

04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2

04/17/2008

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page 6 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRMI1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.2

Title:

RADIOACTIVE TEXT 3.11.1.3

Title:

RADIOACTIVE TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

04/26/2006 LIQUID EFFLUENTS DOSE 1

04/26/2006 LIQUID WASTE TREATMENT SYSTEM 1

12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2

05/02/2007 RADIOACTIVE LIQUID PROCESS-MONITORING INSTRUMENTATION 3

04/26/2006 DOSE RATE 1

04/26/2006 DOSE -

NOBLE GASES..

1 04/26/2006 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/18/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3

11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4

09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1

04/26/2006 TOTAL DOSE 4

08/08/2006 MONITORING PROGRAM Page 2 of 15 Report Date: 04/05/10 Page 7 o f

_15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.2 2

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2 4

04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4. 1

Title:

TEXT 4. 2

Title:

TEXT 4. 3

Title:

TEXT 4.4

Title:

TEXT 4. 5

Title:

TEXT 4. 6

Title:

TEXT 4. 7

Title:

0 CONTROLS 08/31/1998 ORGANIZATION ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0

08/31/1998 CONTROLS REPORTABLE EVENT ACTION 0

08/31/1998 CONTROLS SAFETY LIMIT VIOLATION 1

12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0

08/31/1998 CONTROLS REPORTING REQUIREMENTS 0

08/31/1998 CONTROLS RADIATION PROTECTION PROGRAM 0

08/31/1998 CONTROLS TRAINING Page ~

of 15 Report Date: 04/05/10 Page 8 of

.15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.0 4

05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT B3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM'ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT B3.1.3 3

03/31/2006

Title:

REACTIVITY CONTROLSYSTEMS.BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1

Title:

CORE OPERATING L TEXT B3.3.1

Title:

INSTRUMENTATION TEXT B3.3.2

Title:

INSTRUMENTATION TEXT B3.3.3

Title:

INSTRUMENTATION TEXT B3.3.4

Title:

INSTRUMENTATION TEXT B3.3.5

Title:

INSTRUMENTATION TEXT B3.3.6

Title:

INSTRUMENTATION IMITS 0

11/19/2002 BASES CORE OPERATING LIMITS REPORT (COLRY 0

11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 1

11/09/2007 BASES SEISMIC MONITORING INSTRUMENTATION 3

12/18/2008 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 3

11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 2

11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3

10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Pa~e~

of 15.

Report Date: 04/05/10 Page 9 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.7 1

11/09/2007

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1

10/22/2003

Title:

INSTRUMENTATION BASES TRM REACTOR PROTECTION SYSTEM (RPS)

INSTRUMENTATION TEXT B3.3.9

Title:

OPRM INSTRUMENTATION TEXT B3.3.10

Title:

INSTRUMENTATION BASES 3

04/17/2008 2

04/05/2010 REACTOR RECIRCULATION PUMP MG SET STOPS-LDCN 4709 TEXT B3.3.11 1

10-/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION 0

TEXT B3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1

Title:

REACTOR TEXT B3.4.2

Title:

REACTOR TEXT B3.4.3

Title:

REACTOR TEXT B3.4.4

Title:

REACTOR TEXT B3.4.5

Title:

REACTOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1

COOLANT SYSTEM BASES 04/16/2009 STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0

COOLANT SYSTEM BASES 0

COOLANT SYSTEM BASES 11/19/2002 REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 11/19/2002 REACTOR VESSEL MATERIALS TEXT B3.5.1 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT Page j&

of 15 Report Date: 04/05/10 Page 10 of 15 Report Date: 04/05/10

SSES MANUIAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.5.2 1

11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION*

TEXT B3.5.3 1

11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY'TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

-: 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERýPOSiTION INDICATION TEXT B3.6.3 2

04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0

11/1972002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0

11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL TEXT B3.7.3.1 2

01/07/2008

Title:

PLANT SYSTEMS BASES FIRESUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2

04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0

11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1

04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS Page 1.1 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name: TRI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 0

TEXT B3.7.3.5

Title:

PLANT TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT TEXT B3.7.5.3

Title:

PLANT TEXT B3.7.6

Title:

PLANT 1

04/26/2006 SYSTEMS BASES FIRE HOSE STATIONS 1

04/26/2006 SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 SYSTEMS BASES FIRE RATED ASSEMBLIES 1

Q1/12/2004 SYSTEMS BASES FIRE DETECTIONINSTRUMENTATION 0

11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 LIQUID HOLDUP TANKS 2

06/27/2008 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2

01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3

06/21/2007

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC Page 12.

of 15 Report Date: 04/05/10 Page 12 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRMl Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11

Title:

STRUCTURAL TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT B3.8.3

Title:

ELECTRICAL TEXT B3.8.4

Title:

ELECTRICAL TEXT B3.8.5

Title:

ELECTRICAL TEXT B3.8.6

Title:

ELECTRICAL TEXT B3.8.7 0

04/16/2009 INTEGRITY 2

03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

1 09/17/2004 POWER BASES MOTOR OPERATED-VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

0

11/19/2002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0

11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 1

02/04/2005 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1

06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS Page 13 of 15 Report Date: 04/05/10 Page 13 o f 1-5 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1

.03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION.(ISFSI)

TEXT B3.10.4 1

Title:

MISCELLANEOUS BASES LEADING 04/17/2008 EDGE FLOW METER (LEFM)

TEXT B3.11.1.1

Title:

RADIOACTIVE TEXT B3.11.1.2

Title:

RADIOACTIVE TEXT B3.11.1.3

Title:

RADIOACTIVE TEXT B3.11.1.4

Title:

RADIOACTIVE 0

BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0

11/19/2002 BASES LIQUID EFFLUENTS DOSE 0

11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM.

0 11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS 0

11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0

11/19/2002 K

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES Page 14

~

15 Report Date: 04/05/10 Page 14 of 15 Report Date: 04/05/10

SSES MANUJAL Manual Name:

TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM 0

BASES 11/19/2002 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN TEXT B3.11.2.4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4

11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 1

01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0

11/19/2002

Title:

RADIOACTIVE EFFWUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2

01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS.BASES LAND USE CENSUS TEXT B3.11.4.3

Title:

RADIOACTIVE EFFLUENTSý TEXT B3.12.1

Title:

LOADS CONTROL PROGRAM TEXT B3.12.2

Title:

LOADS CONTROL PROGRAM TEXT B3.12.3

Title:

LOADS CONTROL PROGRAM 0

11/19/2002 BASES INTERLABORATORY COMPARISON PROGRAM 1

10/04/2007 BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 0

11/19/2002 BASES HEAVY LOADS REQUIREMENTS 0

11/19/2002 BASES LIGHT LOADS REQUIREMENTS Page i5~

of 15 Report Date: 04/05/10 Page 15 o f 1ý5 Report Date: 04/05/10

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 USE AND APPLICATION.......................................................................

TRM/1.0-1 1.1 D efin itio ns.........................................................................................

T R M /1.0-2 2.0 PLANT PROGRAMS.......................................................................................

2.0-1 2.1 Plant Programs..........................................................................................

2.0-1 2.2 Instrument Trip Setpoint Table..........................................................

TRM/2.0-5 3.0 APPLICABILITY......................................................................................

TRM/3.0-1 3.0 TRO) - TR for Operation (TRO) Applicability.....................................

TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability......................................

TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS.......................................................

TRM/3.1-1 3.1.1 Alternate Rod Injection......................................................................

TRM/3.1-1 3.1.2 CRD Housing Support................................................................................

3.1-4 3.1.3 Control Rod Block Instrumentation............................................................

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve......................................................................................

TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT...................................................

TRM/3.2-1 3.2.1 Core Operating Limits Report............................................................

TRM/3.2-1 3.3 INSTRUMENTATION..............................................................................

TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation.................. *............................. TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation...................................................

TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation........................................

TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation.................................

TRM/3.3-9 3.3.5 Section Not Used..............................................................................

TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation......................................

TRM/3.3-13 3.3.7 Turbine Overspeed Protection System..............................................

TRM/3.3-17 3.3.8 Section Not Used..............................................................................

TRM/3.3-19 3.3.9 OPRM Instrumentation......................................................................

TRM/3.3-22 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops..............................................................................

TRM/3.3-23 3.3.11 MVP Isolation Instrumentation...........................................................

TRM/3.3-25 3.3.12 W ater Monitoring Instrumentation.....................................................

TRM/3.3-27 3.4 REACTOR COOLANT SYSTEM.............................................................

TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry...................................................

TRM/3.4-1 3.4.2 Not Used...........................................................................................

TRM/3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors.........................................

3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit.................................

TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program................................

TRM/3.4-13 SUSQUEHANNA - UNIT 1 TRM / TOC-1 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC..........................................

TRM/3.5-1 3.5.1 A D S M anual Inhibit...........................................................................

T R M /3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................................

3.5-3 3.5.3 Long Term Nitrogen Supply to ADS...........................................................

3.5-6 3.6 C O N TA IN M E N T..............................................................................................

3.6-1 3.6.1 VENTING or PURGING.............................................................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ica tio n....................................................................................................

3.6 -2 3.6.3 Suppression Pool Alarm Instrumentation....................................................

3.6-3 3.6.4 Primary Containment Closed System Boundaries.............................

TRM/3.6-6 3.7 P LA N T SY S T E M S..........................................................................................

3.7-1 3.7.1 Emergency Service Water System (Shutdown)..........................................

3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level..............................................

3.7-3 3.7.3.1 Fire Suppression Water Supply System............................................

TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems............................................................

TRM/3.7-8 3.7.3.3 C02 Systems....................................................................................

TRM/3.7-12 3.7.3.4 Halon Systems..................................................................................

TRM/3.7-16 3.7.3.5 Fire Hose Stations.............................................................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses..................................

TRM/3.7-22 3.7.3.7 Fire Rated Assemblies......................................................................

TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation..........................................................

TRM/3.7-26 3.7.4 Solid Radwaste System..............................

TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor................................................

3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture.....................................................

3.7-39 3.7.5.3 Liquid Holdup Tanks.........................................................................

TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation..........................................................

TRM/3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation................................................................

TRM/3.7-42 3.7.8 S nubbers...........................................................................................

T R M /3.7-44 3.7.9 Control Structure HVAC....................................................................

TRM/3.7-50 3.7.10 Spent Fuel Storage Pools.................................................................

TRM/3.7-52 3.7.11 Structural Integrity.............................................................................

TRM/3.7-55 SUSQUEHANNA UNIT 1 TRM/TOC-2 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / TOC-2 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.8 ELECTRICAL POWER...........................................................................

TRM/3.8-1 3,8.1 Primary Containment Penetration Conductor Overcurrent P rotective D evices............................................................................

T R M /3.8-1 3,8.2.1 Motor Operated Valves Thermal Overload Protection -

C o ntinuous........................................................................................

T R M /3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Automatic.......................................

TRM/3.8-11 3,8.3 Diesel Generator (DG) Maintenance Activities..................................

TRM/3.8-13 3.8.4 24VDC Electrical Power Subsystem..................................................

TRM/3.8-15 3.8.5 Degraded Voltage Protection............................................................

TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling.......................................................

3.8-24 3.8.7 Battery Monitoring and Maintenance Program..................................

TRM/3.8-26 3.9 REFUELING OPERATIONS...........................................................................

3.9-1 3.9.1 D e cay T im e................................................................................................

3.9-1 3.9.2 C om m unications........................................................................................

3.9-2 3.9.3 R efueling P latform......................................................................................

3.9-3 3.10 MISCELLANEOUS...................................................................................

TRM/3.10-1 3.10.1 Sealed Source Contamination.............................................................

TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation...............................

3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).........................

TRM/3.10-7 3.11 RADIOACTIVE EFFLUENTS..................................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Concentration...........................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Dose........................................................................

TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System.......................................................

TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation..............

3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation................... TRM/3.11-13 3.11.2.1 D ose R ate........................................................................................

T R M /3.11-17 3.11.2.2 Dose - Noble Gases.........................................................................

TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in P articulate Form................................................................................

T R M /3.11-21 3.11.2.4 Gaseous Radwaste Treatment System.............................................

TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System..............................................

TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation...................................................................................

T R M /3.11-25 3.11.3 T otal D ose...........................................................................................

T R M /3.11-33 3.11.4.1 Monitoring Program.............................................................................

TRM/3.11-35 3.11.4.2 Land Use Census................................................................................

TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program..................................................

TRM/3.11-47 SUSQUEHANNA - UNIT 1 TRM /TOC-3 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.12 LOADS CONTROL PROGRAM..............................................................

TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.................................................

TRM/3.12-1 3.12.2 Heavy Loads Requirements....................................................................

TRM/3.12-3 3.12.3 Light Loads Requirements......................................................................

TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS......................................................................

4.0-1 4.1 O rg a n iza tio n....................................................................................................

4.0-1 4.2 Reportable Event Action..................................................................................

4.0-2 4.3 Safety Limit Violation......................................................................................

4.0-3 4.4 Procedures and Programs..............................................................................

4.0-4 4.5 Reporting Requirements.....................................................................

............ 4.0-5 4.6 Radiation Protection Program..........................................................................

4.0-7 4.7 T ra in in g...........................................................................................................

4.0 -8 SUSQUEHANNA -

UNIT I TRM I TOC-4 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / TOC-4 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 A p p lica b ility................................................................................................

B 3.0 -1 B 3.0 (TRO) - TR for Operation (TRO) Applicability.............................................

B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability...............................................

B 3.0-9 B 3.1.1 Alternate Rod Injection......................................................................

TRM/B 3.1-1 B 3.1.2 CRD Housing Support.......................................................................

TRM/B 3.1-4 B 3.1.3 Control Rod Block Instrumentation....................................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve......................................................................................

T R M /B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR)........................................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation................................................

TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation...................................................

TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation........................................

TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation.................................

TRM/B 3.3-4 B 3.3.5 Section Not Used..............................................................................

TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation...............................................

B 3.3-10 B 3.3.7 Turbine Overspeed Protection System..............................................

TRM/B 3.3-14 B 3.3.8 Section Not Used..............................................................................

TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation......................................................................

TRM/B 3.3-17 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and M echanical Stops..............................................................................

TR M /B 3.3-18 B 3.3.11 MVP Isolation Instrumentation...........................................................

TRM/B 3.3-20 B 3.3.12 Water Monitoring Instrumentation.....................................................

TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry............................................................

B 3.4-1 B 3.4.2 N ot U sed..........................................................................................

T R M /B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors................................

TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit.................................

TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program.........................................

B 3.4-6 B 3.5.1 A D S M anual Inhibit....................................................................................

B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation........................ TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS..................................................

TRM/B 3.5-4 SUSQUEHANNA -

UNIT 1 TRM I TOC-5 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / TOC-5 EFFECTIVE DATE 03/2512010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.6.1 VENTING or PURGING....................................................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ica tio n....................................................................................................

B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation...........................................

TRM/B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries.............................

TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)..........................................

B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level..............................................

B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System............................................

TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems............................................................

TRM/B 3.7-5 B 3.7.3.3 C0 2 system s....................................................................................

TR M /B 3,7-7 B 3.7.3.4 Halon Systems..................................................................................

TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.............................................................................

TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses..................................

TRM/B 3,7-11 B 3.7.3.7 Fire Rated Assemblies......................................................................

TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation..........................................................

TRM/B 3.7-14 B 3.7.4 Solid Radwaste System....................................................................

TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor................................................

B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture.....................................................

B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks..................................................................................

B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation..........................................................

TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation................................................................

TRM/B 3.7-22 B 3.7.8 S nubbers...........................................................................................

T R M /B 3.7-24 B 3.7.9 Control Structure HVAC....................................................................

TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools.................................................................

TRM/B 3.7-33 B 3.7.11 Structural Integrity.............................................................................

TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective D evices............................................................................

TR M /B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous........................................................................................

T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic..........................................................................................

T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities...........................................

B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem...........................................................

B 3.8-6 B 3.8.5 Degraded Voltage Protection............................................................

TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling..............................................

TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program..................................

TRM/B 3.8-18 B.3.9.1 D ecay T im e................................................................................................

B 3.9-1 B 3.9.2 C om m unications........................................................................................

B 3.9-2 SUSQUEHANNA -

UNIT 1 TRM I TOC-6 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM /TOC-6 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

PPL Rev. 17 SECTION B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Refueling Platform......................................................................................

B 3.9-3 Sealed Source Contamination....................................................................

B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation...................... TRM/B 3.10-2 Independent Spent Fuel Storage Installation (ISFSI).........................

TRM/B 3.10-4 Liquid Effluents Concentration....................................................................

B 3.11-1 Liquid Effluents Dose.................................................................................

B 3.11-4 Liquid W aste Treatment System................................................................

B 3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation.................................

B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation.................... TRM/B 3.11-10 Dose Rate.........................................................................................

TRM/B 3.11-12 Dose - Noble Gases..................................................................................

B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in P a rticulate Fo rm.........................................................................................

B 3.11-18 Gaseous Radwaste Treatment System.............................................

TRM/B 3.11-20 Ventilation Exhaust Treatment System..............................................

TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation.................................................................................

TRM/B 3.11-24 T ota l D o se..................................................................................................

B 3.11-26 Monitoring Program...........................................................................

TRM/B 3.11-28 Land Use Census.......................................................................................

B 3.11-34 Interlaboratory Comparison Program................................................

TRM/B 3.11-36 Crane Travel - Spent Fuel Storage Pool..........................................

TRM/B 3.12-1 Heavy Loads Requirements..............................................................

TRM/B 3.12-2 Light Loads Requirements................................................................

TRM/B 3.12-3 TRM1 text TOC 03/24/2010 SUSQUEHANNA -

UNIT I TRM/TOC-7 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / TOC-7 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 03/25/2010 TOC TABLE OF CONTENTS 1.0 2.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM / 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Page TRM /2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 3.0 APPLICABILITY Page TRM / 3.0-1 Page TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 10/04/2002 08/31/1998 01/28/2005 06/25/2002 04/02/1999-03/27/2008 05/15/2008 03/27/2008 11/15/2004 02/02/2010 11/15/2004 03/27/2008 11/15/2004 11/15/2005 04/14/2008 04/12/2007 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/22/2006 04/07/2009 03/27/2008 02/18/1999 02/18/1999 07/07/1999 03/11/2010 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 04/12/2007 3.1 3.2 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Page TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM / 3.3-7 Page 3.3-8 Page TRM / 3.3-9 3.3 SUSQUEHANNA

- UNIT I TRM / LOES-1 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-1 EFFECTIVE DATE 03125/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.4 3.5 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM / 3.3-11 Page TRM / 3.3-11a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 through TRM / 3.3-21 Page TRM / 3.3-22 Page TRM / 3.3-22a Pages TRM / 3.3-22b through TRM / 3.3-22d Page TRM / 3.3-23 Pages TRM / 3.3-24 and TRM / 3.3-25 Page TRM / 3.3-26 Pages TRM / 3.3-27 and TRM / 3.3-28 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page TRM / 3.4-9 Page TRM / 3.4-10 Page TRM / 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Pages TRM / 3.5-4 and TRM / 3.5-5 Pages 3.5-6 and 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-3 Page TRM / 3.6-4 Page 3.6-5 Pages TRM / 3.6-6 through TRM / 3.6-8 12/17/1998 10/31/2007 06/02/2005 04/14/2008 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 03/27/2008 11/15/2004 03/22/2006 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 03/27/2008 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 08/31/1998 03/31/2006 3.6 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 Page TRM / 3.7-4 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7.13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM 3.7-26 Page TRM 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Pages TRM / 3.7-31 and TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Page TRM / 3.7-34a Page TRM / 3.7-35 Pages TRM / 3.7-36 and TRM / 3.7-37 Pages 3.7-38 and 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-41 Page TRM / 3.7-41a Page TRM / 3.7-42 Page TRM / 3.7-43 Pages TRM / 3.7-44 through TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Pages TRM / 3.7-55 through TRM / 3.7-57 04/07/2009 08/02/1999 04/07/2009 12/29/1999 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 08/09/2005 01/13/2010 11/16/2001 01/09/2004 11/16/2001 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 SUSQUEHANNA

- UNIT I TRM / LOES-3 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-3 EFFECTIVE DATE 03/2512010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM /3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Page TRM / 3.8-7 Pages TRM / 3.8-8 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM /3.8-13 Page TRM / 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Pages TRM / 3.8-28 and TRM / 3.8-29 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 04/02/2002 01/28/2005 03/25/2010 04/02/2002 10/31/2007 12/03/2004 09/03/2004 12/03/2004 03/25/2010 08/31/1998 04/02/2002 08/31/1998 04/02/2002 08/31/1998 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 08/31/1998 03/31/2006 08/31/1998 08/31/1998 08/01/2006 03/22/2006 03/31/2006 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 and 3.10-3 Pages 3.10-2 and 3.10-3 Page TRM / 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 and 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages TRM / 3.11-7 through TRM / 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM /3.11-13 SUSQUEHANNA

- UNIT 1 TRM / LOES-4 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM /3.11-17 Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM / 3.11.30 through TRM / 3.11.32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-43 Page TRM / 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM /4.0-8 12/03/2004 09/01/1998 03/31/2006 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 08/01/2006 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA

- UNIT I TRM / LOES-5 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Page TRM / B 3.1-5 Pages TRM / B 3.1-6 and TRM / B 3.1-7 Page TRM / B 3.1-8 B 3.1 B 3.2 B 3.3 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B 3.3-2a Page TRM / B 3.3-3 Page TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 and TRM / B 3.3-16 Page TRM / B 3.3-17 Pages TRM / B 3.3-17a through TRM / B 3.3-17c Page TRM / B 3.3-17d Pages TRM / B 3.3-17e and TRM / B 3.3-17f Page TRM / B 3.3-18 Page TRM / B 3.3-19 Page TRM / B 3.3-20 Page TRM / B 3.3-21 Pages TRM / B 3.3-22 and TRM / B 3.3-23 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 11/15/2005 03/22/2006 02/18/1999 08/31/1998 04/07/2000 10/31/2007 12/11/2008 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 10/31/2007 10/22/2003 03/22/2006 03/22/2006 03/27/2008 03/22/2006 03/25/2010 05/16/2008 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA-UNIT 1 TRM / LOES-6 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA'- UNIT 1 TRM / LOES-6 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 B 3.5 B 3.6 B 3.7 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 Pages TRM / B 3.4-2 and TRM / B 3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 through TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages B.3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Page TRM / B 3.7-6 Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Page TRM / B 3.7-10a Page TRM / B 3.7-11 Page TRM / B 3.7-1 la Pages TRM / B 3.7-12 through TRM / B 3.7-14 Page TRM / B 3.7-14a Page TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Page TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-28 Pages TRM / B 3.7-29 and TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/27/2008 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 12/03/2004 03/09/2001 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-7 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 through TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11.23 Page TRM / B 3.11.23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 and B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.7-31 through B 3.7-35 Page TRM / B 3.11-36 04/15/2003 12/03/2004 07/05/2000 04/01/2009 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 08/10/2004 04/02/2002 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 08/31/1998 03/22/2006 08/23/1999 08/30/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/30/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/30/1998 11/30/2005 12/03/2004 08/30/1998 02/12/1999 SUSQUEHANNA

- UNIT 1 TRM / LOES-8 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-8 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 57 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 09/19/2007 02/05/1999 TRM1 text LOES 3/24/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-9 EFFECTIVE DATE 03/25/2010

Reactor Recirculation Pump MG Set Stops PPL Rev. 2 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES TRO In the case of recirculation control system failures (e.g., transistors, resistors, etc.) causing upscale signal failure, the reactor is protected by high pressure or high flux scram. Such faults have been analyzed in Chapter 15 and include both MG sets going to full speed simultaneously. For this analysis, the Integrated Control System (ICS) Recirculation MG Set Speed Control logic is assumed to fail such that it causes a speed increase for both recirculation pumps.

Pump overspeed occurs during the course of a LOCA due to blowdown through the broken loop pump. Design studies determined that rotating component failure missiles caused by the overspeed was not sufficient to cause damage to the containment or to vital equipment, consequently no protective or preventative provision is made for this pump overspeed condition.

No credit is taken for electrical or mechanical stops to limit the speed of the recirculation pumps in these analyzed events.

Normally, operator implementation or procedural controls maintains the recirculation system within the system design limits and initial conditions of analyzed events. The reactor recirculation pump MG set stops are set with some operating margin above these limits. As such, the stops serve as backups to the operator control over normal operation. Additionally, in the event of a fault that results in inadvertent MG set speed increases above the normal operating limits, the stops can provide protection from the automatic reactor scram that terminate the analyzed worse case events. Therefore, the MG set stops also serve to provide additional plant reliability protection.

The electrical stop is the primary means for backing up procedural controls and for automatically limiting recirculation flow. The electrical stop is implemented as a high output limiter in the Integrated Control System (ICS)

Recirculation MG Set Speed Control logic. This adjustable limiter function is applied to the analog speed demand signal (e.g. Scoop Tube position "command"). The mechanical stop provides a diverse and redundant backup to the electrical stop limiting mechanism. The mechanical stop is implemented via a physical bolt on the Scoop Tube actuator.

ACTIONS The Actions are modified by a Note allowing separate Condition entry for each recirculation pump. The Required Actions provide appropriate compensatory measures for each recirculation loop independent of the other loop.

(continued)

SUSQUEHANNA - UNIT 1 TRM / B 3.3-18 EFFECTIVE DATE 03/25/2010

Reactor Recirculation Pump MG Set Stops PPL Rev. 2 B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES ACTIONS A. 1 (continued)

Either the electrical or the mechanical stop can provide backup protection to the procedural controls in place to maintain recirculation pump operation within the system design limits and initial conditions of analyzed events. In the event one of these un-creditied backup features is inoperable it is reasonable to extend the restoration time (in the event conditions do not permit more timely corrective action) until the next scheduled required calibration. With the backup protection of the electrical or mechanical stop remaining OPERABLE, backup protection remains and allows time to schedule and plan appropriate repairs. Since there is no assumed credit for either backup function, this Completion Time is considered appropriate.

B. 1 With both the electrical and mechanical stops inoperable for any recirculation pump MG set, the automatic backup protection is not available. In this case, the scoop tube is locked in place to protect against unintended / inadvertent speed increases. This action conservatively compensates for lack of backup protection and allows continued operation until at least one MG set stop function (electrical or mechanical) is restored to operable status. The Required Action is modified by a Note allowing intermittent unlocking of the scoop tube. This may be required for power reductions or other power level adjustments. The administrative control consists of stationing a dedicated operator at the controls while the scoop tube is unlocked and the duration should be limited to the time necessary to complete the change in core flow.

TRS The TRS assures that the stops are demonstrated OPERABLE at least once per cycle. Normal scoop tube positioner calibration is performed after each refueling outage. Inoperable stops are detectable on line during scoop tube positioner calibration.

REFERENCES

1. FSAR Section 5.4.1.4.
2. FSAR Section 7.7.2.3.1.
3. FSAR Section 15.4.5.

SUSQUEHANNA - UNIT 1 TRM / B 3.3-19 EFFECTIVE DATE 05/16/2003

Primary Containment Penetration Conductor Overcurrent Protective Devices 3.8.1 PPL Rev. 2 3.8 Electrical Power 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices TRO 3.8.1 The primary containment penetration conductor overcurrent protective devices in Table 3.8.1-1 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2 and 3 ACTIONS

-NOTE-Separate condition entry is allowed for each device.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more containment A.1 Deenergize the circuit(s) and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> penetration conductor declare the affected system overcurrent protective or component inoperable.

devices inoperable.

AND A.2 Verify affected circuit Once per 7 days deenergized.

B.

Required Action and B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time for Condition A AND not met.

B.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SUSQUEHANNA - UNIT 1 TRM / 3.8-1 EFFECTIVE DATE 04/02/2002

Primary Containment Penetration Conductor Overcurrent Protective Devices 3.8.1 PPL Rev. 2 TECHNICAL. REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.1.1


NOTE-For each circuit breaker found inoperable, an additional representative sample of Ž10% of all the circuit breakers of the inoperable type shall be functionally tested until no more failures are found or all circuit breakers of that type have been functionally tested.

Perform a functional test on a representative sample of

>_ 10% of each type of lower voltage circuit breaker.

24 months TRS 3.8.1.2 Perform a functional test on each overcurrent relay.

24 months NOTE The provisions of TRS 3.0.2 are not applicable TRS 3.8.1.3 Subject each circuit breaker to inspection and 120 months preventive maintenance.

SUSQUEHANNA - UNIT 1 TRM / 3.8-2 EFFECTIVE DATE 01/28/2005

Primary Containment Penetration Conductor Overcurrent Protective Devices 3.8.1 PPL Rev. 2 TABLE 3.8.1-1 (Page 1 of 2)

PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES Circuit Breaker Designation System/Equipment Powered A.

Type 1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

150A Frame - Thermal Magnetic 11B237043 1B237043A 1B219022 1B219022A 1B219023 1B219023A 11B246011 11B246011A 1 B229022 1B229022A 113229023 1B229023A 1 B236042 1 B236042A 1 B236032 11B236032A 11B236011 11B236011A 1 B236033 1B236033A 1 B236053 IB236053A 1 B236082 1B236082A 1 B236043 11B236043A 1B236021 1B236021A 1 B246091 1 B246091A 1B246103 11B246103A 1B246102 1B246102A 1 B246061 1 B246061A 1 B246072 11B246072A 1 B246081 1 B246081A 1 8246051 1 B246051A 1B236123 1B236123A 11B246121 11B246121A 1 B236052 1B236052A 113237073 11B237073A 1B237082 11B237082A 1 B253021 1 B253021A 1 B263023 1B263023A 1 B253041 183253041A 11B263021 11B263021A Rx Recirc/HV-B31-1 F023A Rx Recirc/HV-B31-1 F031A Rx Recirc/HV-B31-1 F032A Rx Recirc/HV-B31-1 F023B Rx Recirc/HV-B31-1 F031 B Rx Recirc/HV-B31 -1 F032B Drywell Air Flow/i V41 1A Drywell Air Flow/1V412A Drywell Air Flow/iV413A Drywell Air Flow/IV414A RWCU/HV-G33-1 F001 Drywell Air Flow/1V415A Drywell Air Flow/iV416A Drywell Air Flow/IV417A Drywell Air Flow/I V411B Drywell Air Flow/1V412B Drywell Air Flow/1V413B Drywell Air Flow/1V414B Drywell Air Flow/1V415B Drywell Air Flow/1V416B Drywell Air Flow/1V417B Drywell Air Flow/1 V418A Drywell Air Flow/IV418B RH R/HV-E11-1F009 RHR/HV-E 11-1 F022 HPCI/HV-E41-1 F002 NSSS/HV-1B21-1F011A NSSS/HV-B21-1F011B MSIV Hoist/TBB15 MSIV Hoist/TBB16 (continued)

SUSQUEHANNA - UNIT 1 TRM / 3.8-3 EFFECTIVE DATE 03/25/2010

Primary Containment Penetration Conductor Overcurrent Protective Devices 3.8.1 PPL Rev. 2 TABLE 3.8.1-1 (Page 2 of 2)

PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES Circuit Breaker Designation System/Equipment Powered B.

Type 150A Frame - Magnetic

1.

18236023 1B236023A

2.

1B246022 1B246022A

3.

18237072 1B237072A

4.

1B236102 1B236102A

5.

1B246112 1B246112A

6.

1B246113 1B246113A

7.

18253052 1B253052A

8.

1B263043 1B253043A

9.

1B263052 1B263052A

10.

1B263081 1B263081A

11.

1B246062 1B246062A

12.

1B246012 1B246012A

13.

1B253063 1B253063A

14.

1B263071 1B263071A

15.

18253043 1B253043A

16.

1B263072 1B263072A C.

Type 250A Frame - Thermal Magnetic

1.

18216092 1B216083

2.

18226103 1B226102

3.

1B236103 1B236122

4.

18246033 18246044 D.

Circuit Breakers Tripped by Overcurrent Relays

1.

1A20501 1A20502

2.

1A20601 1A20602 Cont. Inst. Gas/HV-12603 RCIC/HV-E51-1F007 NSSS/HV-B21-1 F016 NSSS/HV-B21-1 F001 NSSS/HV-B21-1 F002 NSSS/HV-B21-1 F005 RWC U/HV-G33-1 F102 RWCU/HV-G33-1 F100 RWC U/HV-G33-1 F106 RWCU/HV-G33-1 F101 RBCCW/HV-i 1346 RBCCW/HV-i 1345 Drywell Sump/1P402A Drywell Sump/1P402B Drywell Sump/1 P403A Drywell Sump/1 P403B Cont. H2 Recombiner/1E440A Cont. H2 Recombiner/1 E440B Cont. H2 Recombiner/1 E440C Cont. H2 Recombiner/1 E440D Rx Recirc/1P401A Rx Recirc/1 P401 B SUSQUEHANNA - UNIT I TRM / 3.8-4 EFFECTIVE DATE 03/25/2010

Diesel Generator (DG) Maintenance Activities 3.8.3 PPL Rev. 1 3.8 Electrical Power 3.8.3 Diesel Generator (DG) Maintenance Activities TRO 3.8.3 The Technical Requirements Surveillances specified in this TRO shall be performed at the Frequency specified for each DG.

APPLICABILITY:

When the associated DG is required to be OPERABLE ACTIONS NOTE-------

Separate condition entry is allowed for each Diesel Generator.

CONDITION REQUIRED ACTION COMPLETION TIME A.

TRO requirements not A.1 Declare affected DG Immediately met.

inoperable.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.3.1 Inspect diesel in accordance with 5 years procedures prepared in conjunction with its manufacturers recommendations for this class of standby service.

TRS 3.8.3.2 Verify that the auto-connected loads to each 24 months diesel generator do not exceed the 2000-hour rating of 4700 kW.

(continued)

SUSQUEHANNA - UNIT 1 TRM / 3.8-13 EFFECTIVE DATE 03/25/2010

Diesel Generator (DG) Maintenance Activities PPL Rev. 1 3.8.3 TECHNICAL REQUIREMENT SURVEILLANCE (continued)

SURVEILLANCE FREQUENCY TRS 3.8.3.3 Verify that the following diesel generator 24 months lockout features do not prevent diesel generator starting and/or operation when not required:

a.

Engine overspeed.

b.

Generator differential.

c.

Engine low lube oil pressure.

TRS 3.8.3.4 For each fuel oil storage tank 10 years

a.

Drain the fuel oil;

b.

Remove the sediment, and

c.

Clean the tank TRS 3.8.3.5 Perform a pressure test of those portions 10 years of the fuel oil system designed to Section III, Subsection ND of the ASME Code in accordance with ASME Code Section Xl Article IWD-5000.

SUSQUEHANNA - UNIT 1 TRM / 3.8-14 EFFECTIVE DATE 08/31/1998