MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-14932 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#:

0363 Address: NUCSA2 Phone#:

254-3194 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSE M 04/06/2010 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/21/2010 ADD MANUAL TABLE OF CONTENTS DATE: 04/05/2010 CATEGORY:

DOCUMENTS TYPE: TRM2

-A-0 (

t"Jvc

Apr.

06, 2010 Page 2

of 2

ID:

TEXT 3.8.3 REMOVE:

REV:0 ADD:

REV:

1 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT LOES ADD:

REV:

58 REMOVE:

REV:57 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT TOC ADD:

REV:

17 REMOVE:

REV:16 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

04/05 Procedure Name TEXT LOES

Title:

LIST OF EFFECT:

/2010 Rev Issue Date 58 04/05/2010 IVE SECTIONS Change ID Change Number TEXT TOC

Title:

17 04/05/2010 TABLE OF CONTENTS TEXT 1.1 0

11/19/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1

Title:

TEXT 2.2

Title:

1 02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS 9

02/12/2010 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4

05/23/2008

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT 3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 4

05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8

05/14/2009

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

LDCN 4712 Page 1 of 15 Report Date: 04/05/10 Page 1 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0

11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2

Title:

INSTRUMENTATION 2

11/09/2007 SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2

11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 5

05/23/2008

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING.IINSTRUMENTATION TEXT 3.3.5 0

11/19/2002

Title:

INSTRUMENTATION THIS PAGE.INTENTIONALLY LEFT BLANK TEXT 3.3.6

Title:

INSTRUMENTATION 2

10/19/2005 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1

11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3

05/14/2009

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Page Z of 15 Report Date: 04/05/10 Page 2 of 15 Report Date: 04/05/10

SSES MAANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1

Title:

REACTOR TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.5.1 1

04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE.LIMIT 1

04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT.

TEXT 3.5.2 1

,'11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY.TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3. 7. 4

Title:

PLANT TEXT 3.7.5.1

Title:

PLANT 0

11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 2

04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3

04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3

04/16/2009 SYSTEMS C02 SYSTEMS 2

04/16/2009 SYSTEMS HALON SYSTEMS 2

04/16/2009 SYSTEMS FIRE HOSE STATIONS' 2

04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 8

01/20/2010 SYSTEMS FIRE DETECTION INSTRUMENTATION 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Page 4 of 15 Report Date: 04/05/10 Page 4 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.2

Title:

PLANT TEXT 3.7.5.3

Title:

PLANT TEXT 3.7. 6

Title:

PLANT 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1

04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 2

06/27/2008 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 2

09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7. 8

Title:

PLANT SYSTEMS SNUBBERS 6

06/21/2007 TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7. 11

Title:

PLANT SYSTEMS 10/02/2009 TEXT 3.8.1 2

02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2

11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT 3.8.3 1

04/05/2010

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES Page 5 of

.15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.4 1

02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0

11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6 0

11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 2

10/22/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/19/2002

.Title:

REFUELING OPERATIONS. COMMUNICATIONS TEXT 3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1

04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 1

04/26/2006

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE Page 6 of 15 Report Date: 04/05/10

SSES MANUAL Manual Narde:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE TEXT 3.11.2.3

Title:

RADIOACTIVE FORM TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE TEXT 3.11.4.2

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

12/14/2004 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2

05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3

04/26/2006 DOSE RATE 1

04/26/2006 DOSE -

NOBLE GASES 1

04/26/2006 DOSE -

IODINE, TRITIUM.,

AND RADIONUCLIDES1 IN PARTICULATE 0

11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3

11/14/2006 VENTILATION EXHAUST TREATMENT SYSTEM 4

09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1

04/26/2006 TOTAL DOSE 3

04/26/2006 MONITORING PROGRAM 2

04/26/2006 LAND USE CENSUS Pagel of ~

Report Date: 04/05/10 Page 7 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4

04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4. 1

Title:

TEXT 4.2

Title:

TEXT 4.3

Title:

TEXT 4. 4

Title:

TEXT 4.5

Title:

TEXT 4.6

Title:

TEXT 4. 7

Title:

TEXT B3.0 ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0

CONTROLS 0

CONTROLS 0

CONTROLS 1

CONTROLS 0

CONTROLS 09/27/2003 ORGANIZATION 09/27/2003 REPORTABLE EVENT ACTION 09/27/2003 SAFETY LIMIT VIOLATION 12/18/2008 PROCEDURES & PROGRAMS 09/27/2003 REPORTING REQUIREMENTS 0

0 09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0

CONTROLS 09/27/2003 TRAINING 4

05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY w

Page a of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.3 3

04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD AND CHECK VALVE TRANSIENT WITHOUT SCRAM ALTERNATE DRIVE (CRD)

HOUSING SUPPORT BLOCK INSTRUMENTATION SCRAM ACCUMULATORS INSTRUMENTATION TEXT B3.2.1

Title:

CORE OPERATING L TEXT B3.3.1

Title:

INSTRUMENTATION TEXT B3.3.2

Title:

INSTRUMENTATION TEXT B3.3.3

Title:

INSTRUMENTATION TEXT B3.3.4

Title:

INSTRUMENTATION TEXT B3.3.5

Title:

INSTRUMENTATION TEXT B3.3.6

Title:

INSTRUMENTATION TEXT B3.3.7

Title:

INSTRUMENTATION IMITS 0

11/19/2002 BASES CORE OPERATING LIMITS REPORT (COLR) 0 11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 1

11/09/2007 BASES SEISMIC MONITORING INSTRUMENTATION 2

11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION, 3

11/09/2007 BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 2

11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 3

10/19/2005 BASES TRM ISOLATION ACTUATION INSTRUMENTATION 1

11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM Page ~

of 15 Report Date: 04/05/10 Page9 of

.15 Report Date: 04/05/10

SSES MANUJAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.8

Title:

INSTRUMENTATION TEXT B3.3.9

Title:

INSTRUMENTATION TEXT B3.3.10

Title:

INSTRUMENTATION TEXT B3.3.11

Title:

INSTRUMENTATION 1

10/22/2003 BASES TRM RPS INSTRUMENTATION 3

05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 1

12/18/2008 BASES REACTOR RECIRCULATION PUMP MG 1

10/22/2003

.BASES MVP ISOLATION INSTRUMENTATION SET STOPS TEXT B3.3.12 0

. 04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1

Title:

REACTOR TEXT B3.4.2

Title:

REACTOR TEXT B3.4.3

Title:

REACTOR TEXT B3.4.4

Title:

REACTOR TEXT B3.4.5

Title:

REACTOR TEXT B3.5.1 0

11/19/2002 COOLANT SYSTEM BASESREACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM BASES -STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0

11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1

11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION Page 10 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.3 1

11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1

Title:

CONTAINMENT TEXT B3.6.2

Title:

CONTAINMENT INDICATION 0

11/19/2002 BASES VENTING OR PURGING 0

11/19/2002 BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION TEXT B3.6.3 1

04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1

Title:

PLANT TEXT B3.7.2

Title:

PLANT TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT TEXT B3.7.3.3

Title:

PLANT TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN),

0

ý 11/19/2002 ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL 2

01/07/2008 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2

04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0

11/19/2002 C02 SYSTEMS 1

04/26/2006 HALON SYSTEMS 1

04/26/2006 FIRE HOSE STATIONS Page 21 of 15.

Report Date: 04/05/10 Page 11 of 15 Report Date: 04/05/10

SSES MM~TANUA Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

,PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT TEXT B3.7.5.3

Title:

PLANT TEXT B3.7.6

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 1

04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 FIRE RATED ASSEMBLIES 1

01/12/2004 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGENMONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 LIQUID. HOLDUP TANKS, 2

06/27/2008 ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2

01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3

Title:

PLANT SYSTEMS BASES SNUBBERS 06/21/2007 TEXT B3.7.9 1

12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

(.

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS Page 12 of 15 Report Date: 04/05/10 Page 12 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.11

Title:

STRUCTURAL TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT B3.8.3

Title:

ELECTRICAL 1

10/02/2009 INTEGRITY 2

03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

0 11/19/2002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES:

TEXT B3.8.4 0

11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5

Title:

ELECTRICAL POWER TEXT B3.8.6

Title:

ELECTRICAL POWER TEXT B3.8.7 0

' 11/19/2002 BASES DEGRADED VOLTAGE PROTECTION 1

02/04/2005 BASES EMERGENCY SWITCHGEAR ROOM COOLING 1

06/15/2009

ý

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM Page ~

of 25.

Report Date: 04/05/10 Page 13 of 15 Report Date: 04/05/10

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1

04/10/2007

Title:

MISCELLANEOUS BASES SHUTDOWN.MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.11.1.1

Title:

RADIOACTIVE TEXT B3.11.1.2

Title:

RADIOACTIVE TEXT B3.11.1.3

Title:

RADIOACTIVE TEXT B3.11.1.4

Title:

RADIOACTIVE 0

11/19/2002 BASES LIQUID EFFLUENTS'CONCENTRATION EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 0

BASES 0

BASES 11/19/2002 LIQUID EFFLUENTS DOSE.

11/19/2002 LIQUID WASTE TREATMENT SYSTEM 0

11/19/2002 BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS 0

11/19/2002 BASES RADIOACTIVE LIQUID PROCESS: MONITORING INSTRUMENTATION TEXT B3.11.2.1 1

12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4

Title:

RADIOACTIVE EFFLUENTS 0

11/19/2002 BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN 0

BASES 11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM Page 14 of 15 Report Date: 04/05/10 Page 14 of

.15 Report Date: 04/05/10

SSES MAN1TA-L Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.5

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 4

11/14/2006 BASES VENTILATION EXHAUST TREATMENT SYSTEM 1

01/27/2004 BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING TEXT B3.11.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2

01/06/2006

Title:

RADIOACTIVE EFFLUENTS.BASES MONITORING PROGRAM TEXT B3.11.4.2 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES-:LAND USE CENSUS TEXT B3.11.4.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1

10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0

1i/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Date: 04/05/10 Page 15 of

.15 Report Date: 04/05/10

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 USE AND APPLICATION............................................................................

1.0-1 1.1 D efinitions.....................................................................................

T R M /1.0-2 2.0 P LA N T P R O G RA M S...................................................................................

2.0-1 2.1 P la nt P rog ram s......................................................................................

2.0-1 2.2 Instrument Trip Setpoint Table.....................................................

TRM/2.0-5 3.0 A P P LIC A B ILITY.................................................................................

T R M /3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability...............................

TRM/3.0-1 3.0

('RS) - TR Surveillance (TRS) Applicability..................................

TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS..................................................

TRM/3.1-1 3.1.1 Alternate Rod Injection.................................................................

TRM/3.1-1 3.1.2 C R D H ousing S upport...........................................................................

3.1-4 3.1.3 Control Rod Block Instrumentation........................................................

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve.................................................................................

T R M /3.1-9 3.2 CORE OPERATING LIMITS REPORT........................................................

3.2-1 3.2.1 Core Operating Limits Report................................................................

3.2-1 3.3 INSTRUMENTATION.........................................................................

TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation...........................................

TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation..............................................

TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation...................................

TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation............................

TRM/3.3-9 3.3.5 Section Not Used..........................................................................

TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation.................................

TRM/3.3-13 3.3.7 Turbine Overspeed Protection System.........................................

TRM/3.3-17 3.3.8 Section Not Used..........................................................................

TRM/3.3-19 3.3.9 OPRM Instrumentation................................................................

TRM/3.3-21 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops.........................................................................

TRM/3.3-22 3.3.11 MVP Isolation Instrumentation......................................................

TRM/3.3-24 3.3.12 Water Monitoring Instrumentation.................................................

TRM/3.3-26 3.4 REACTOR COOLANT SYSTEM..........................................................

TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry......................................................

3.4-1 3.4.2 N ot U sed.........................................................................................

T R M /3.4-6 3.4.3 Hligh/Low Pressure Interface Leakage Monitors....................................

3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit............................

TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program........................... TRM/3.4-13 SUSQUEHANNA UNIT 2 TRM / TOC-1 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM /TOC-1 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC......................................

TRM/3.5-1 3.5.1 ADS Manual Inhibit.......................................................................

TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS......................................................

3.5-6 3.6 C O N TA IN M E N T..........................................................................................

3.6-1 3.6.1 VENTING or PURGING.........................................................................

3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ic a tio n...............................................................................................

3.6 -3 3.6.3 Suppression Pool Alarm Instrumentation...............................................

3.6-4 3.6.4 Primary Containment Closed System Boundaries........................ TRM/3.6-7 3.7 PLANT SYSTEMS...............................................................................

TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)............................

TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level.........................................

3.7-3 3.7.3.1 Fire Suppression Water Supply System.......................................

TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................................

TRM!3.7-8 3.7.3.3 C0 2 system s................................................................................

T R M /3.7-12 3.7.3.4 Halon Systems............................................................................

TRM/3.7-16 3.7.3.5 Fire Hose Stations........................................................................

TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses.............................

TRM/3.7-22 3.7.3.7 Fire Rated Assemblies..................................................................

TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation......................................................

TRM/3.7-26 3.7.4 Solid Radwaste System................................................................

TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor...................

3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture.......................................

TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks.....................................................................

TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation..............................................................

3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation...........................................................

TRM/3.7-41 3.7.8 S nubbers......................................................................................

T R M /3.7-43 3.7.9 Control Structure HVAC................................................................

TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs)..............................................

TRM/3.7-51 3.7.11 Structural Integrity.........................................................................

TRM/3.7-54 3.8 ELECTRICAL POWER.......................................................................

TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices........................................................................

TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous...................................................................................

T R M /3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A uto m atic......................................................................................

T R M /3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities.............................

TRM/3.8-13 SUSQUEHANNA - UNIT 2 TRM /TOC-2 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.8.4 24VDC Electrical Power Subsystem.............................................

TRMI3.8-15 3.8.5 Degraded Voltage Protection.......................................................

TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling.................................................

3.8-24 3.8.7 Battery Monitoring and Maintenance Program..............................

TRM/3.8-26 3.9 REFUELING O PERATIO NS........................................................................

3.9-1 3.9.1 D e cay T im e...........................................................................................

3.9-1 3.9.2 C om m unications....................................................................................

3.9-2 3.9.3 R efueling P latform.................................................................................

3.9-3 3.10 M ISC ELLA N EO US.............................................................................

TRM /3.10-1 3.10.1 Sealed Source Contamination......................................................

TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation...........

3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).................... TRM/3.10-7 3.10.4 Section Not Used..........................................................................

TRM /3.10-8 3.11 RADIOACTIVE EFFLUENTS..............................................................

TRM/3.11-1 3.11.1 Liquid Eff luents.............................................................................

T R M /3.11-1 3.11.1.1 Liquid Effluents Concentration......................................................

TRM/3.11-1 3.11.1.2 Liquid Effluents Dose...................................................................

TRM /3.11-4 3.11.1.3 Liquid Waste Treatment System..................................................

TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation............... TRM/3.11-13 3.11.2 G aseous Effluents........................................................................

TRM /3.11-17 3.11.2.1 Dose Rate.....................................

TRM/3.11-17 3.11.2.2 Dose - Noble Gases..............................

TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form...........................................................................

T R M /3.11-21 3.11.2.4 Gaseous Radwaste Treatment System........................................

TRM/3.111-22 3.11.2.5 Ventilation Exhaust Treatment System.........................................

TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation.............................................................................

T R M /3.111-25 3.11.3 T otal D ose....................................................................................

T R M /3.11-33 3.11.4 Radiological Environmental Monitoring.........................................

TRM/3.11-35 3.11.4.1 M onitoring Program......................................................................

TRM /3.11-35 3.11.4.2 Land Use C ensus.........................................................................

TRM /3.11-45 3.11.4.3 Interlaboratory Comparison Program............................................

TRM/3.11-47 3.12 LOADS CONTROL PROGRAM..........................................................

TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool.......................................

TRM/3.12-1 3.12.2 Heavy Loads Requirements.........................................................

TRM/3.12.3 3.12.3 Light Loads Requirements............................................................

TRM/3.12-5 SUSQUEHANNA UNIT 2 TRM / TOC-3 EFFECTIVE DATE 03/25/2010 SUSQU EHAN NA - U N IT 2 TRM / TOC-3 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 4.0 ADMINISTRATIVE CONTROLS.................................................................

4.0-1 4.1 Organization..........................................................................................

4.0-1 4.2 Reportable Event Action.......................................................................

4.0-2 4.3 Safety Limit Violation.............................................................................

4.,0-3 4.4 Procedures and Programs.....................................................................

4.0-4 4.5 Reporting Requirements........................................................................

4.0-5 4.6 Radiation Protection Program................................................................

4.0-7 4.7 T ra in in g..................................................................................................

4.0 -8 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability......................................

B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability.........................................

B 3.0-9 B 3.1.1 Alternate Rod Injection................................................................

TRM/B 3.1-1 B 3.1.2 CRD Housing Support.........................................................................

B 3.1-4 B 3.1.3 Control Rod Block Instrumentation..............................................

TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve.........................................................................

TRM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR).................................................

B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation..........................................

TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation.............................................

TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation...............

TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation........................... TRM/B 3.3-4 B 3.3.5 Section Not Used.........................................................................

TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation........................................

B 3.3-10 B 3.3.7 Turbine Overspeed Protection System........................................

TRM/B 3.3-14 B 3.3.8 Section Not Used.........................................................................

TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation................................................................

TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops........................................................................

TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation.....................................................

TRM/B 3.3-22 B 3.3.12 Water Monitoring Instrumentation................................................

TRM/B 3.3-24 B 3.4.1 Reactor Coolant System Chemistry.....................................................

B 3.4-1 B 3.4.2 N ot U sed......................................................................................

T R M /B 3.4-2 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit........................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program..................................

B 3.4-6 B 3.5.1 A D S M anual Inhibit..............................................................................

B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation.................. TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS...................................................

B 3.5-4 B 3.6.1 VENTING or PURGING...............................................................

TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ica tio n..............................................................................................

B 3.6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation.............................................

B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)...................................

B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level.......................................

B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System......................................

TRM/B 3.7-3 SUSQUEHANNA

- UNIT 2 TRM/TOC-5 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM /TOC-5 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 17 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.7.3.2 Spray and Sprinkler Systems......................................................

TRM/B 3.7-5 B 3.7.3.3 C02 Systems..............................................................................

TRM/B 3.7-7 B 3.7.3.4 Halon Systems............................................................................

TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.......................................................................

TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................ TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies.................................................................

TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation.....................................................

TRM/B 3.7-14 B 3.7.4 Solid Radwaste System...............................................................

TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor.........................................

B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture..............................................

B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks.............................................................................

B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation....................................................

TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..........................................................

TRM/B 3.7-22 B 3.7.8 S nubbers....................................................................................

T R M /B 3.7-24 B 3.7.9 Control Structure HVAC...............................................................

TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools............................................................

TRM/B 3.7-33 B 3.7.11 Structural Integrity........................................................................

TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.......................................................................

TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous..................................................................................

T R M /B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic.....................................................................................

T R M /B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem............................................

TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection......................................................

TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling........................................

TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program.............................

TRM/B 3.8-18 B.3.9.1 D ecay T im e.........................................................................................

B 3.9-1 B 3.9.2 C om m unications..................................................................................

B 3.9-2 B 3.9.3 R efueling P latform...............................................................................

B 3.9-3 B 3.10.1 Sealed Source Contamination.............................................................

B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation........................

B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)................... TRM/B 3.10-4 B 3.10.4 Section Not Used.........................................................................

TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents Concentration...........................

B 3.11-1 B 3.11.1.2 Liquid Effluents Dose..........................................................................

B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System.........................................................

B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation..........................

B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation.............. TRM/B 3.11-10 SUSQUEHANNA - UNIT 2 TRM / TOC-6 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

PPL Rev. 17 SECTION B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Dose Rate....................................................................................

TRM/B 3.11-12 Dose - Noble Gases............................................................................

B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form..................................................................................

B 3.11-18 Gaseous Radwaste Treatment System.......................................

TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................

TRM/B 3.11-21 Radioactive Gaseous Effluent Monitoring Instrumentation............................................................................

TRM/B 3.11-24 T ota l D o se...........................................................................................

B 3.11-26 Monitoring Program.....................................................................

TRM/B 3.11-28 Land Use Census................................................................................

B 3.11-34 Interlaboratory Comparison Program...........................................

TRM/B 3.11-36 LOADS CONTROL PROGRAM...................................................

TRM/B 3.12-1 Crane Travel - Spent Fuel Storage Pool.....................................

TRM/B 3.12-1 Heavy Loads Requirements........................................................

TRM/B 3.12-2 Light Loads Requirements...........................................................

TRM/B 3.12-3 TRM2 Text TOC 3/25/2010 SUSQUEHANNA-UNIT2 TRM / TOC-7 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM / TOC-7 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Page TRM / 2.0-8 Page TRM / 2.0-9 Page TRM / 2.0-10 Page TRM /2.0-11 Page TRM /2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM /2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-54 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page 3.3-6 Page TRM 3.3-7 Page 3.3-8 03/25/2010 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 04/15/2009 11/15/2004 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 04/14/2008 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/17/2009 07/16/1999 10/31/2007 08/31/1998 10/31/2007 08/31/1998 3.1 3.2 3.3 SUSQUEHANNA-UNIT 2 TRM / LOES-1 EFFECTIVE DATE 03/252010 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 03/252010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-9 Page TRM / 3.3-9a Page TRM / 3.3-10 Page TRM /3.3-11 Page TRM / 3.3-1 la Page TRM / 3.3-12 Page TRM /3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 04/12/2007 12/17/1998 10/31/2007 06/02/2005 04/14/2008 03/30/2001 09/13/2005 12/14/1998 10/22/2003 06/27/2001 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.4 3.5 3.6 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Pages TRM / 3.7-25 and TRM / 3.7-26 Page TRM / 3.7-27 Page TRM / 3.7-28 Page TRM / 3.7-29 Page TRM / 3.7-30 Page TRM / 3.7-31 Page TRM / 3.7-32 Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Page TRM / 3.7-40a Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 10/31/2007 11/29/2006 01/13/2010 11/30/2005 11/16/2001 01/09/2004 10/05/2002 03/31/2006 02/01/1999 08/31/1998 03/31/2006 02/14/2005 06/20/2008 09/04/2008 08/31/1998 10/05/2006 06/07/2007 10/05/2006 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA-UNIT 2 TRM / LOES-3 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 Pages TRM / 3.8-2 and TRM / 3.8-3 Page TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 04/02/2002 01/28/2005 01/31/2005 04/02/2002 10/31/2007 08/10/2004 12/03/2004 03/25/2010 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 08/31/1998 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 03/31/2006 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.10 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 through 3.11-9 Page TRM / 3.11-10 Pages 3.11-11 and 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 12/03/2004 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA

- UNIT 2 TRM / LOES-4 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.11-18 Page TRM /3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA

- UNIT 2 TRM / LOES-5 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Page TRM / B 3.0-5 Page TRM / B 3.0-6 Page TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Pages TRM / B 3.3-2 and TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Pages TRM / B 3.3-4 and TRM / B 3.3-5 Pages TRM / B 3.3-6 through TRM / B 3.3-9 Page B 3.3-10 Pages TRM / B 3.3-11 and TRM / B 3.3-12 Page TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 04/14/2008 08/31/1998 04/12/2007 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 10/31/2007 10/31/2007 05/30/2006 10/31/2007 08/31/1998 09/13/2005 12/03/2004 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 12/11/2008 05/16/2003 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA

- UNIT 2 TRM / LOES-6 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 B 3.5 B 3.6 B 3.7 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 and TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-1Oa through TRM / B 3.7-1 la Pages TRM / B 3.7-12 through TRM / B 3.7-14 Pages TRM / B 3.7-14a and TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Page TRM / B 3.7-21a Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-32 Page TRM / B 3.7-33 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 01/09/2004 02/01/1999 08/31/1998 02/14/2005 06/20/2008 01/30/2008 10/05/2006 06/07/2007 10/05/2006 03/09/2001 04/15/2003 SUSQUEHANNA

- UNIT 2 TRM / LOES-7 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Pages TRM / B 3.7-39 and TRM / B 3.7-40 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM / B 3.8-3 Page TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 Page TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 01/28/2005 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 04/02/2002 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 03/25/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 58 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages B 3.11-31 through B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Pages TRM / B 3.12-2 and TRM / B 3.12-3 11/30/2005 12/03/2004 08/31/1998 02/12/1999 09/19/2007 02/05/1999 TRM12 text LOES.doc 3125/2010 0

SUSQUEHANNA - UNIT 2 TRMILOES-9 EFFECTIVE DATE 03/25/2010 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 03/25/2010

Diesel Generator (DG) Maintenance Activities 3.8.3 PPL Rev. 1 3.8 Electrical Power 3.8.3 Diesel Generator (DG) Maintenance Activities TRO 3.8.3 APPLICABILITY:

The Technical Requirements Surveillances specified in this TRO shall be performed at the Frequency specified for each DG.

When the associated DG is required to be OPERABLE ACTIONS NOTE ------------------------------------------------------

Separate condition entry is allowed for each Diesel Generator.

CONDITION REQUIRED ACTION COMPLETION TIME A.

TRO requirements not met.

A.1 Declare affected DG Immediately inoperable.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.8.3.1 Inspect diesel in accordance with procedures 5 years prepared in conjunction with its manufacturers recommendations for this class of standby service.

TRS 3.8.3.2 Verify that the auto-connected loads to each diesel 24 months generator do not exceed the 2000-hour rating of 4700 kW.

(continued)

SUSQUEHANNA - UNIT 2 TRM / 3.8-13 EFFECTIVE DATE 03/25/2010

Diesel Generator (DG) Maintenance Activities 3.8.3 PPL Rev. 1 TECHNICAL REQUIREMENT SURVEILLANCE (continued)

SURVEILLANCE FREQUENCY TRS 3.8.3.3 Verify that the following diesel generator lockout 24 months features do not prevent diesel generator starting and/or operation when not required:

a. Engine overspeed.
b. Generator differential.
c. Engine low lube oil pressure.

TRS 3.8.3.4 For each fuel oil storage tank 10 years

a. Drain the fuel oil;
b. Remove the sediment, and
c. Clean the tank TRS 3.8.3.5 Perform a pressure test of those portions of the fuel 10 years oil system designed to Section III, Subsection ND of the ASME Code in accordance with ASME Code Section XI Article IWD-5000.