ML101030179

From kanterella
Jump to navigation Jump to search
Annual Commitment Change Report
ML101030179
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/2010
From: Repko R
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEI 99-04
Download: ML101030179 (3)


Text

PDuke EEnergy REGIS T. REPKO Vice President McGuire Nuclear Station Duke Energy MG01 VP / 12700 Hagers Ferry Rd.

Huntersville, NC 28078 980-875-4111 980-875-4809 fax regis. repko@duke-energy. com March 31, 2010 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Annual Commitment Change Report Attached is a summary report of commitment changes for McGuire Nuclear Station completed during the 2009 calendar year. These changes were made per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments" and have no adverse effect on compliance with NRC rules or regulations.

Questions regarding this submittal should be directed to Kay Crane, McGuire Regulatory Compliance at (980) 875-4306.

0 TY-Regis T. Repko ADO!

www. duke-energy. com

U. S. Nuclear Regulatory Commission March 31, 2010 Page 2 xc:

Mr. Luis Reyes U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. Jon Thompson U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555-0001 Mr. Joe Brady NRC Senior Resident Inspector McGuire Nuclear Station

McGuire Nuclear Station Commitment Change Summary Report Docket Nos. 369 and 370 NUMBER SOURCE ORIGINAL COMMITMENT MODIFIED COMMITMENT DOCUMENT 2009-M-001 Letter dated August August 3, 2004 - Run maximum Run the maximum number of 3, 2004 and number of reactor coolant pumps reactor coolant pumps during Commitment during CRUD burst.

CRUD burst OR CRUD burst will Change #2007-M-be initiated after cool down to a 002 Commitment Change # 2007-M-reasonable point, all reactor 2007 Run maximum number of coolant pumps have been secured reactor coolant pumps during CRUD and reactor coolant system level burst OR Beginning with has been lowered below 84 inches M2EOC18, CRUD burst will be OR CRUD burst will be initiated initiated after cool down to a after cool down to a reasonable reasonable point, all reactor coolant point and all reactor coolant pumps pumps have been secured and reactor have been secured.

coolant system level has been lowered below 84 inches.

2009-M-002 Generic Letter 92-08 To preclude spurious closure due to Maintain valves 1/2 CA-161C and Response dated fire damage, valves 1/2 CA-161C 1/2 CA-162C closed with power November 28, 1994 and 1/2CA-162C are manually removed to preclude air opened and power remove within 10 entrainment of the TD CA pump.

minutes per AP/0/A/5500/045.

Manually open 1/2 CA 161C and 1/2CA-1 62C later in the Appendix R or Sabotage event once it has been established that the raw water (CCW) make-up source is water solid.

I