ML100820171
| ML100820171 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 03/24/2010 |
| From: | Farideh Saba Plant Licensing Branch II |
| To: | Doug Broaddus Plant Licensing Branch II |
| Saba F, NRR/DORL/LPL2-2, 301-415-1447 | |
| References | |
| Download: ML100820171 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 24, 2010 MEMORANDUM TO: Doug Broaddus, Acting Chief FROM:
SUBJECT:
DATE & TIME:
LOCATION:
PURPOSE:
Category 1:*
PARTICIPANTS:
Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Farideh E. Saba, Senior Project Manager IRA EBrown fori Plant Licensing Branch 11-2
. Division of Operating Reactor Licensing FORTHCOMING MEETING WITH PROGRESS ENERGY CAROLINAS, INC., REGARDING PLANNED AMENDMENT REQUESTS Wednesday, April?, 2010 1:00 p.m. - 3:00 p.m.
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-16B4 Rockville, Maryland Preapplication meeting between Progress Energy Carolinas, Inc.,
representing Carolina Power & Light (the licensee), and the Nuclear Regulatory Commission to discuss the licensee's planned license amendment request to adopt the AREVA Topical Report A!\\IP-1 0298P, Revision 0, "ACE/ATRIUM 10XM Critical Power Correlation," at the Brunswick Steam Electric Plant (BSEP), Units 1 and 2. The licensee plans to load ATRIUM-10XM fuel for Cycle 20 at BSEP Unit 2 in spring 2011).
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Participants from the !\\IRC include members of the Office of Nuclear Reactor Regulation.
NRC Progress Energy E. Brown J. Siphers F.Saba W. Murray G. Cranston R. Thomas A. Mendiola E. Geyer
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28. 2002.
- 2 Interested members of the public can participate in this meeting Via a toll-free audio teleconference. Please call one of the meeting contacts listed below before April 5, 2010, 1:00 PM (Eastern Standard Time) to get the telephone number and the pass code.
MEETING CONTACTS:
Farideh E. Saba, NRR Marlayna G. Vaaler, NRR 301-415-1447 301-415-3178 farideh.saba@nrc.gov marlayna.vaaler@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice, a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-325 and 50-324
Enclosure:
Agenda cc w/encl: Distribution Via ListServ
AGENDA FOR THE APRIL 7, 2010, PREAPPLICATION PUBLIC MEETING BETWEEN PROGRESS ENERGY CAROLINAS, INC., AND THE NUCLEAR REGULATORY COMMISSION REGARDING PLAN TO ADOPT AREVA TOPICAL REPORT ANP-10298P, REVISION 0 AT THE BRUNSWICK STEAM AND ELECTRIC PLANT, UNITS 1 AND 2
- 1.
INTRODUCTIONS AND MEETING OBJECTIVES
- 2.
B2C20 ATRIUM-10XM FUEL DESIGN OVERVIEW
- 3.
SUPPORTING LICENSE AMENDMENT SUBMITTALS
- 4.
RELOAD ANALYSIS SCHEDULE
- 5.
SCHEDULE
- 6.
QUESTIONS AND ANSWERS ADJOURN Enclosure
D. Broaddus
- 2 Interested members of the public can participate in this meeting Via a toll-free audio teleconference. Please call one of the meeting contacts listed below before April 5, 2010, 1:00 PM (Eastern Standard Time) to get the telephone number and the pass code.
MEETING CONTACTS:
Farideh E. Saba, NRR Marlayna G. Vaaler, NRR 301-415-1447 301-415-3178 farideh.saba@nrc.gov marlayna.vaaler@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice, a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-325 and 50-324
Enclosure:
Agenda cc w/encl: Distribution Via ListServ DISTRIBUTION:
PUBLIC LPLlI-2 R/F RidsNrrDorlLpl2-2 RidsNrrPMBrunswick RidsNrrLACSola RidsNrrDorl Resource RidsOpaMaii Resource RidsOgcMailCenter RidsAcrsAcnw MailCTR RidsNrrDssSrxb RidsRgn2MailCenter Receptionists (OWFNITWFN)
PMNS DDiaz-Toro, EDO R-II C Steger, NRR RidsNrrDssSnpb ACCESSION NO. ML100820171 NRC-001 OFFICE LPLlI-2/PM LPLlI-2/LA LPLlI-2/BC (A)
NAME EBrown for FSaba CSoia DBroaddus DATE 03/24/10 03/24/10 03/24/010 OFFICIAL RECORD COPY