)IATION WORK PERMIT YEAR: 09 RWP NUMBER: 00057 REVISION: 01 TYPE: WGR LOCATION: MULTI Q00 ELEVATION: ROOM: AREA:
TITLE: MECHANICAL MAINTENANCE/ELECTRICAL MAINTENANCE INITIATED: 01/22/09 SCHEDULED START: 01/26/09 EXPECTED COMPLETE: 01/01/10 ALARA CATEGORY : 0 PROTECTIVE CLOTHING AND RESPIRATORY PROTECTION REQUIREMENTS DOSIMETRY REQUIREMENTS EXTREMITY - HANDS : MULTIPLE DOSIMETRY:
EXTREMITY - FEET RELOCATE DOSIMETRY: ION CHAMBER :
ALARMING DOSIMETER: Y SET TO ALARM AT: 15 MREM OR AT: 40 MREM/HR ADMINISTRATIVE / EXPOSURE CONTROL REQUIREMENTS MINIMUM TEDE BALANCE OF 2( 0O MREM REQUIRED FOR ENTRY PRE-JOB MEETING REQUIRED : N AUTO ENTRY/EXIT PERMITTED : Y WORK ORDER NUMBER REQUIRED: N SIGNATURE CHECK AT SIGN-IN: Y HEALTH PHYSICS COVERAGE AND MONITORING PERIOD SURVEY FREQ: 1 ROUTINE SURVE REQD-IF: UPON CHANGE OF RADIOLOGICAL CONDIT HP COVERAGE: INTERMITTENT SPECIAL INSTRUCTIONS / REMARKS MECHANICAL & ELECTRICAL MAINTENANCE.
- SEE RADPRO RP JOB STANDARDS FOR RESIN CHARGE TO CATION TANK.
- CONTACT RPS PRIOR TO SYSTEM OPENING FOR SURVEY CONSIDERATION.
- REF. OE22661 - INADEQUATE FME BARRIERS.
DURING THE DISASSEMBLY OF SERVICE WATER PUMP "A", A THREE POUND BRASS WEDGE APPROXIMATELY 5" X 2", DROPPED INTO THE SERVICE WATER BAY DUE TO INADEQUATE T'MT PA TT'P;c~ flT1TVT\T( DrTT\D MAT1\MM1PThJ\'V~
APPROVALS / TERMINATION
.1 Name Date .tures PREPARED BY BUCHTA,J 01/22/09 WORK SUPERVISOR: MECH MAINT 01/22/09 1 L HP SUPERVISOR : RPS 01/22/09 TERMINATED BY :
U' POST JOB REVIEW:
4#
RADIATION WORK PERMIT FACI YEAR: 09 RWP NUMBER: 00057 REVISION: 01 TYPE: WGR LOCATION: MULTI QQQ ELEVATION: ROOM: AREA:
TITLE: MECHANICAL MAINTENANCE/ELECTRICAL MAINTENANCE TASK NBR DESCRIPTION 000 OPS - OTHER END OF WORK PERMIT REPORT
- UU"ý VVGON RADIATION WORK PERMIT TITLE: MECHANICAL MAINTENANCE/ELECTRICAL MAINTENANCE OC-1-09-00057 OCi090005701 HP COVERAGE CODE: INTERMITTENT ALARMING DOSIMETER: Y ED SET POINT: 0015 MREM OR 0040 MREM/HR SPECIAL INSTRUCTIONS./ REMARKS MECHANICAL & ELECTRICAL MAINTENANCE.
- SEE RADPRO RP JOB STANDARDS FOR RESIN CHARGE TO CATION TANK.
- CONTACT RPS PRIOR TO SYSTEM OPENING FOR SURVEY CONSIDERATION.
- REF. OE22661 - INADEQUATE FME BARRIERS.
DURING THE DISASSEMBLY OF SERVICE WATER PUMP "A", A THREE POUND BRASS WEDGE APPROXIMATELY 5" X 2", DROPPED INTO THE SERVICE WATER BAY DUE TO INADEQUATE FME BARRIERS DURING PUMP MAINTENANCE.
©CopY D,ýv&y~ MAP 09-57 RP-AA-401 Revision 9 ATTACHMENT 9 Micro ALARA Plan (MAP) Work Sheet RWP Number: OC-1 MAP Number: 2009-57 WO Number. C2021071 00057 Job
Description:
Excavation of Underground Piping West of Turbine Building Due to Suspected Leakage Oriqinal Estimates:
Exposure: 5 Millirem Time: 0 RCA person-hours MAP Estimates:
Exposure: 5 Millirem Time: 0 RCA person-hours Exposure Challenge Goal: 5 millirem Note: MAP Estimates at or above 1000 millirem (1.0 rem) require formal ALARA Plan documentation.
Review Work Scope, utilizing job site walkdowns and craft input meetings as necessary, to evaluate the following Micro ALARA Planning controls and concepts:
MAP Conceot / Control Yes No N/A MAP Conceot / Control Yes No N/A Yes No NIA Minimize Crew Size 0 0 0] Modify System Configuration 0 0*
Utilize Low Dose Area 0 0 0] Use Mock-up Training 0 []
0] 0]
Use Experienced Craft 0 0 Re-Sequence / Schedule 0 System Flushing 0 0 0] Improve Physical Work Area 0 0]
Hydrolasing 0 0 0] Remove Component to LDA 0 0]
Shielding Installation 0 0 0] Use HEPA Ventilation 0 0]
Remote Monitoring 0 0 0] Develop High Rad Trash Plan 0 0]
Remote Tooling 0 0 0] Use Teledosimetry 0 0]
Robotics 0 0 0] Scaffold Type Review 0 0]
TEDE ALARA / RRPCE 0 0 0] Work Bundling EJ 0]
RP-AA-401 cRevision 9 MAP 09-57 ATTACHMENT 9 Micro ALARA Plan (MAP) Work Sheet Describe Micro ALARA Plan controls implemented and expected benefits:
- Minimize the number of personnel entering the work area to those required to do the work.
Due to the presence of underground piping with dose rates that have not been recently checked, Radiation Protection will perform radiation surveys during the excavation work.
Currently, the excavation areas are not Radiologically Controlled or Radioactive Materials Areas. However, dose rates in excess of 1.6 mR/hour may exist due to the presence of underground contaminated piping. IF 1.6 mR/hour is detected in the excavation, THEN workers will require personnel dosimetry. RP Department will stop work and notify workers if > 1.6 mR/hour is detected.
- IF dose rates of > 5 mR/hour are detected, THEN a Radiation Work Permit will be required.
RP Department will stop work and personnel will be required to be briefed and sign in on a Radiation Work Permit.
Soil removed from the excavation shall not be removed form the Oyster Creek Protected Area. Soil shall be stored on a waterproof tarp and covered with a separate waterproof tarp.
- Soil shall be sampled by Chemistry Department at approximately each one foot of depth during the excavation.
Peer review by RP personnel at another Exelon site was performed. Based on previous experience dealing with tritium leakage, it was indicated that tritium concentration in excess of 1 E+07 picocuries per liter would require institution of controls such as personnel and equipment contamination monitoring. The highest level detected in ground water as of this writing was 4.7E+06 picocuries per liter. 1 E+07 picocuries per liter equals 1 E-02 microcuries per milliliter, which exceeds the tritium concentration in suspected leakage sources such as Condensate, CRD, and Core Spray.
Review / Include applicable Operating Experience, Lessons Learned, and job history:
OE An INPO OE Digest summarizes areas for improvement (AFIs) written because of weaknesses noted in protecting buried piping. Plant evaluations identified that monitoring, inspections, and processes that control the environment around the exterior of piping systems are not being implemented well, which increases the station vulnerability to pipe failure. Degradation of buried piping can adversely affect plant safety and reliability, especially if the degradation remains undetected for a long period of time. Leaks in some buried piping have also contaminated the soil with tritium and fuel oil, which could leak into ground water or nearby lakes and rivers.
It is important to protect buried piping as stations extend their operating life. The pipe interior can be protected by adding chemicals to reduce the corrosion rates and prevent the buildup of biological organisms and by applying coatings. Mechanically cleaning the pipe interior can reduce operational risk
RP-AA-401I Revision 9 MAP 09-57 from fouling, but it does not provide interior piping protection. The pipe exterior can be protected by using exterior coatings and cathodic protection systems. One station is currently replacing, coating, or lining all of its raw water pipes - including buried piping - at a cost of over $250 million.
In 2006, plant evaluation teams have identified eight ineffective programs for protecting buried piping, resulting in AFIs. This adverse trend continues in 2007. Descriptions of the 2006 AFIs related to buried piping can be found in the following links: 2006 ER2 and 2006 ER3. The following is a summary of 2006 AFIs.
Problems "Pipe degradation was not being monitored for some important buried piping.
"Portions of the cathodic protection system were inoperable for an extended time.
"The cathodic protection system did not operate within the desired impressed current and voltage ranges.
- No strategy had been implemented for long-term asset preservation of buried piping.
Consequences
- vulnerability to undetected degradation
- unexpected through-wall leaks "excessive impressed voltage that can cause disbonding of pipe coating, resulting in accelerated corrosion rates "forced shutdowns "unplanned system unavailability and limiting condition of operation
- exceeding environmental liquid release limits (radioactive liquid, fuel oil), resulting in permit violation Causes "Managers were not aware of the extent of degradation.
"System health reports did not provide sufficient details, or there was no health report for the cathodic protection system.
"Because no pipe failures have occurred, there is overconfidence that coatings will not degrade.
"No actions have been taken to improve cathodic protection system performance because the system was considered a backup to pipe wraps and coatings.
RP-AA-401 Revision 9 MAP 09-57 Approvals: (signature)
Originator: G. Seals/ Date: 4/17/09 Print/Sign
(
Task Manager: R. KorkerL. Date: A0.
Print/Sign RP Supervisor: R. Heffner Date: -, 4/7/o02 Print/Sign