Acceptance Review of Limerick RR I3R-14, Nozzle-Vessel Weld and Inner Radii Examinations
ML100630213
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/04/2010
From: Peter Bamford
Plant Licensing Branch 1
To: Tom Loomis
Exelon Corp
Bamford, Peter J., NRR/DORL 415-2833
References
TAC ME3306, TAC ME3307
Download: ML100630213 (1)


Text

From: Bamford, Peter Sent: Thursday, March 04, 2010 9:59 AM To: 'thomas.loomis@exeloncorp.com' Cc: 'david.helker@exeloncorp.com'

Subject:

Acceptance Review of Limerick RR I3R-14, Nozzle-Vessel Weld and Inner Radii Examinations, TACs ME3306/3307 By letter dated February 1, 2010, Exelon Generation Company, LLC submitted Relief Request I3R-14 regarding examination requirements for certain reactor vessel nozzles at Limerick Generating Station, Units 1 and 2 (Agencywide Documents Access and Management System Accession No. ML100330138). The submittal proposes an alternative to those examination requirements specified in American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Table IWB-2500-1. The alternatives proposed are in accordance with ASME Code Case N-702, "Alternative Requirements for Boiling Water Reactor Nozzle Inner Radius and Nozzle-to-Shell WeldsSection XI, Division 1."

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to continue with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it again.

Peter Bamford NRR/DORL/LPL 1-2 Limerick & TMI-1 Project Manager 301-415-2833 E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review of Limerick RR I3R-14, Nozzle-Vessel Weld and Inner

Radii Examinations, TACs ME3306/3307 Sent Date: 3/4/2010 9:37:44 AM Received Date: 3/4/2010 9:59:00 AM From: Bamford, Peter Created By: Peter.Bamford@nrc.gov Recipients:

thomas.loomis@exeloncorp.com ('thomas.loomis@exeloncorp.com')

Tracking Status: None david.helker@exeloncorp.com ('david.helker@exeloncorp.com')

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 17549 3/4/2010 image001.gif 4069 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: