Notification of Inspection (IR 05000528-10-002) and Request for Information
ML100502137
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/19/2010
From: Greg Werner
NRC/RGN-IV/DRS/PSB-2
To: Edington R
Arizona Public Service Co
References
IR-10-002
Download: ML100502137 (13)


See also: IR 05000528/2010002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

February 19, 2010

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Mail Station 7602

Arizona Public Service Company

P. O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT:

PALO VERDE NUCLEAR GENERATING STATION, UNIT 1- NOTIFICATION

OF INSPECTION (NRC INSPECTION REPORT 05000528/2010002) AND

REQUEST FOR INFORMATION

Dear Mr. Edington:

From April 12 - 23, 2010, reactor inspectors from the Nuclear Regulatory Commissions (NRC)

Region IV office will perform the baseline inservice inspection at Palo Verde Nuclear Generating

Station, using NRC Inspection Procedure 71111.08, "Inservice Inspection Activities," Inspection

Procedure 71007, Reactor Vessel Head Replacement, and Temporary Instruction 2515/172,

"Reactor Coolant System Dissimilar Metal Butt Welds." Experience has shown that this

inspection is a resource intensive inspection both for the NRC inspectors and your staff. In

order to minimize the impact to your onsite resources and to ensure a productive inspection, we

have enclosed a request for documents needed for this inspection. These documents have

been divided into two groups. The first group (section A of the enclosure) identifies information

to be provided prior to the inspection to ensure that the inspectors are adequately prepared.

The second group (section B of the enclosure) identifies the information the inspectors will need

upon arrival at the site. It is important that all of these documents are up-to-date and complete

in order to minimize the number of additional documents requested during the preparation

and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Del Elkington of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector, Shiattin Makor, at (817) 276-6507 (shiattin.makor@nrc.gov),

or Isaac Anchondo at (817) 860-8152 (isaac.anchondo@nrc.gov).

Arizona Public Service Company

- 2 -

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/ L. Ricketson for

Gregory E. Werner, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket No: 50-530

License No. NPF-74

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, AZ 85007

Mr. Douglas Kent Porter

Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P.O. Box 800

Rosemead, CA 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, AZ 85003

Mr. Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, AZ 85040

Arizona Public Service Company

- 3 -

Mr. Scott Bauer, Director

Regulatory Affairs

Palo Verde Nuclear Generating Station

Mail Station 7636

P.O. Box 52034

Phoenix, AZ 85072-2034

Mr. Dwight C. Mims

Vice President

Regulatory Affairs and Plant Improvement

Palo Verde Nuclear Generating Station

Mail Station 7605

P.O. Box 52034

Phoenix, AZ 85072-2034

Chairman, Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, AZ 85040

Mr. Aubrey V. Goodwin, Director

Arizona Radiation Regulatory Agency

4814 S. 40th Street

Phoenix, AZ 85040

Ronald A. Barnes, Director

Regulatory Affairs

Palo Verde Nuclear Generating Station

MS 7638

P.O. Box 52034

Phoenix, AZ 85072-2034

Mr. Jeffrey T. Weikert

Assistant General Counsel

El Paso Electric Company

Mail Location 167

123 W. Mills

El Paso, TX 79901

Michael S. Green

Senior Regulatory Counsel

Pinnacle West Capital Corporation

P.O. Box 52034, MS 8695

Phoenix, AZ 85072-2034

Arizona Public Service Company

- 4 -

Mr. Eric Tharp

Los Angeles Department of Water & Power

Southern California Public Power Authority

P.O. Box 51111, Room 1255-C

Los Angeles, CA 90051-0100

Mr. James Ray

Public Service Company of New Mexico

2401 Aztec NE, MS Z110

Albuquerque, NM 87107-4224

Mr. Geoffrey M. Cook

Southern California Edison Company

5000 Pacific Coast Hwy. Bldg. D21

San Clemente, CA 92672

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, AZ 85251

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

Austin, TX 78701-3326

Environmental Program Manager

City of Phoenix

Office of Environmental Programs

200 West Washington Street

Phoenix, AZ 85003

Mr. John C. Taylor

Director, Nuclear Generation

El Paso Electric Company

340 East Palm Lane, Suite 310

Phoenix, AZ 85004

Chief, Technological Hazards

Branch

FEMA Region IX

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Arizona Public Service Company

- 5 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ryan.Treadway@nrc.gov)

Resident Inspector (Michelle.Catts@nrc.gov)

Resident Inspector (Joseph.Bashore@nrc.gov)

Resident Inspector (Mica.Baquera@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

PV Administrative Assistant (Regina.McFadden@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

File located: S:\\DRS\\REPORTS\\PV 2010 ISI RFI-STM.doc

SUNSI Rev Compl.

X Yes No

ADAMS

X Yes No

Reviewer Initials

STM

Publicly Avail

X Yes No

Sensitive

Yes XNo

Sens. Type Initials

STM

EB1

PSB2

C:PSB2

STMakor

IAAnchondo

GEWerner

/RA/

/RA/

/RA/ L. Ricketson for

2/18/10

2/19/10

2/19/10

OFFICIAL RECORD COPY

T=Telephone

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

April 12 - 23, 2010

Inspection Procedures:

IP 71111.08 "Inservice Inspection (ISI) Activities"

TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"

Inspectors:

Shiattin Makor, Reactor Inspector (Lead Inspector - ISI)

Isaac Anchondo, Reactor Inspector

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Shiattin Makor, by March 29,

2010, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspectors will select specific items from the information requested

below and then request from your staff additional documents needed during the onsite

inspection week (section B of this enclosure). We ask that the specific items selected

from the lists be available and ready for review on the first day of inspection. *Please

provide requested documentation electronically if possible. If requested documents are

large and only hard copy formats are available, please inform the inspectors and provide

subject documentation during the first day of the onsite inspection. If you have any

questions regarding this information request, please call the inspectors as soon as

possible.

A.1

ISI/Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 and 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information).

ii)

Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope (if applicable).

iii)

Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).

- 2 -

Enclosure

iv)

Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs)).

b)

A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 and 2 systems since the beginning of the last refueling outage. This

should include the previousSection XI pressure test(s) conducted during startup

and any evaluations associated with the results of the pressure tests. Also,

include in the list the NDE reports with relevant conditions in the RPVH

penetration nozzles which have been accepted for continued service. The list of

NDE reports should include a brief description of the SSC where the relevant

condition was identified.

d)

A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g)

A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h)

Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2

New Reactor Pressure Vessel Head (RPVH) (If not previously provided per IP 71007)

a)

Updated schedule of all manufacturing and installation activities.

b)

A list of vessel welds and attachment welds on the new reactor vessel head.

c)

A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the new reactor vessel head (flaw

indications).

- 3 -

Enclosure

A.3

Boric Acid Corrosion Control Program (BACCP)

a)

Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b)

Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c)

Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4

Steam Generator Tube (SGT) Inspections

a)

A detailed schedule of:

i)

SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii)

SG secondary side inspection activities for the upcoming outage. (If

occurring)

b)

Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the operational assessment from the last outage and a copy of

the following documents as they become available:

i)

Degradation Assessment

ii)

Condition Monitoring Assessment

c)

If you are planning on modifying your technical specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d)

Copy of SG history documentation given to vendors performing eddy current

testing of the SGs during the upcoming outage.

e)

Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI, Appendix H, ETSS Qualification Records.

f)

Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

- 4 -

Enclosure

g)

Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.)

h)

Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i)

Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j)

Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5

Materials Reliability (MRP-139) Program Activities

a)

A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2009.

b)

Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c)

A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d)

A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e)

A list and schedule of any stress improvement activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any stress improvement activities previously performed.

f)

Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

g)

A list of weld locations controlled by MRP-139 which includes the MRP-139 weld

category, pre-mitigation volumetric examination date, type of mitigation or stress

improvement, post mitigation volumetric examination date, and plans for future

MRP-139 required examinations.

- 5 -

Enclosure

A.6

Additional information related to all ISI activities

a)

A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 2). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage,

rust, corrosion, boric acid, or errors in piping/SGT examinations.

b)

Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B.

Information to be provided onsite to the inspectors at the entrance meeting (April 12,

2010):

B.1

ISI / Welding Programs and Schedule Information

a)

Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b)

For ASME Code Class 1 and 2 welds selected by the inspectors from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code Edition and Addenda for weldment

iv)

Applicable Code Edition and Addenda for welding procedures

v)

Applicable weld procedures (WPS) used to fabricate the welds

vi)

Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii)

Copies of mechanical test reports identified in the PQRs above

- 6 -

Enclosure

viii)

Copies of the nonconformance reports for the selected welds (If

applicable)

ix)

Radiographs of the selected welds and access to equipment to allow

viewing radiographs (if RT was performed)

x)

Copies of the preservice examination records for the selected welds.

xi)

Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c)

For the ISI related corrective action issues selected by the inspectors from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 and 2 systems

selected by the inspectors from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f)

For the NDEs selected by the inspectors from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2

New Reactor Pressure Vessel Head (RPVH) (If not previously provided per IP 71007)

a)

All non-conformance reports associated with the new reactor vessel head, from

initial manufacturing to installation.

b)

Certified Milling Test Reports for CRDM nozzle welds and weld material rods.

c)

Cladding weld records and welder qualifications.

d)

Weld inspection records for CRDM nozzle welds and cladding welds.

e)

NDE procedures, NDE records of welds, and NDE personnel qualifications.

- 7 -

Enclosure

f)

Weld records, inspection records, and welder qualifications for attachment welds

on the new reactor pressure vessel head.

g)

A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the new reactor vessel head (flaw

indications).

h)

Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage)

i)

RPVH and CRDM nozzle configurations

ii)

RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

B.3

Boric Acid Corrosion Control Program (BACCP)

a)

Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b)

Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4

Steam Generator Tube (SGT) Inspections

a)

Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b)

Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c)

Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d)

Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

- 8 -

Enclosure

e)

List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

B.5

Codes and Standards

a)

Ready access to (i.e., copies provided to the inspectors for use during the

inspection at the onsite inspection location, or room number and location where

available):

i)

Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii)

EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

Shiattin Makor

Isaac Anchondo

Reactor Inspector

Reactor Inspector

817-276-6507

817-860-8152

Shiattin.Makor@nrc.gov

Isaac.Anchondo@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Shiattin Makor

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011-4125