MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds NMP2L2880, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23012A2002023-01-13013 January 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000220/2023401 and 05000410/2023401 ML22207A2162022-07-26026 July 2022 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000220/2022010 and 05000410/2022010 ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21320A3472021-11-16016 November 2021 Request for Additional Information LAR to Revise TSs to Adopt TSTF-582, Revision 0 ML21306A3312021-11-0202 November 2021 Request for Additional Information Alternative Request GV-RR-10 (11/2/2021 e-mail) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21125A1282021-05-0404 May 2021 OPC Document Request - Feb 2021 ML21110A5112021-04-20020 April 2021 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-582 ML21088A2682021-03-30030 March 2021 Notification of Conduct of a Fire Protection Team Inspection ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20365A0092020-12-30030 December 2020 Request for Additional Information Concerning Review of License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency (EPIDs L-2020-LLA-0188 and L-2020-LLR-0114) ML20358A2602020-12-28028 December 2020 Changes to Draft Request for Additional Information Regarding License Amendment Request and Relief Request to Change Excess Flow Check Valve Testing Frequency ML20272A2802020-09-28028 September 2020 Withdrawal and Replacement of Request for Additional Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20248H5192020-09-28028 September 2020 Changes to Draft Request for Additional Information Regarding Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times ML20246G6362020-09-0202 September 2020 Request for Additonal Information to Support Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times NMP2L2739, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22020-08-28028 August 2020 Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20212L8702020-07-30030 July 2020 Request for Additonal Information Review of License Amendment Requests Regarding Riskinformed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290) ML20213A9352020-07-30030 July 2020 Request for Additional Information Review of License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20045E3582020-02-14014 February 2020 Draft Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates ML19296A1862019-10-23023 October 2019 Request for Additional Information Regarding License Amendment Request to Increase Allowable MSIV Leakage Rates (L-2019-LLA-0115) ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test ML19025A1572019-01-25025 January 2019 Request for Additional Information Regarding Primary Containment Oxygen Concentration License Amendment Request ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18341A2212018-12-0707 December 2018 Request for Additional Information Regarding Emergency Tech Spec Change Re HPCS Completion Time (EPID -L-2018-LLA-0491) ML18228A6932018-08-15015 August 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18205A3922018-07-24024 July 2018 Request for Additional Information Regarding Reactor Pressure Vessel Water Inventory Control License Amendment Request (L-2017-LLA-0426) ML18184A2882018-07-0303 July 2018 Request for Additional Information Regarding Removal of Boraflex Credit from Spent Fuel Pool License Amendment Request(L-2018-LLA-0039) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17272A0112017-10-10010 October 2017 Request for Additional Information Regarding License Amendment Concerning Reactor Pressure Vessel Water Inventory Control ML17234A3592017-08-30030 August 2017 Request for Additional Information Regarding Relief Request NMP-RR-001 to Utilize Code Case N-702 ML17241A2752017-08-29029 August 2017 Request for Additional Information Response MSA (MF7946,7) and FE (MG0087,8) E-mail Attachment 2024-07-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 6, 2010 Mr. Samuel L. Belcher Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 SUB~IECT: REQUEST FOR ADDITIONAL INFORMATION REGARDING NINE MILE POINT NUCLEAR STATION, UNIT NO.2 (NMP2) - RE: ADOPTION OF NEI-94-01, REVISION 2-A, AND EXTENSION OF PRIMARY CONTAINMENT INTEGRATED LEAKAGE RATE TEST INTERVAL TO 15 YEARS (TAC NO. ME1650)
Dear Mr. Belcher:
By letter dated June 29, 2009, as supplemented on August 13, 2009, Nine Mile Point Nuclear Station, LLC (NMPNS), submitted for Nuclear Regulatory Commission (NRC) staff review and approval, a proposed license amendment requesting to revise the Technical Specifications to replace the reference to Regulatory Guide 1.163, "Performance Based Containment Leak-Test Program," with a reference to Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A, as the implementation document used by NMPNS to develop the NIVIP2 performance-based leakage testing program in accordance with Option B of Title 10 of the Code of Federal Regulations, Appendix J.
The NRC staff is reviewing the information provided in that letter and has determined that additional information is needed to support its review. Enclosed is the NRC staff's request for additional information (RAI). The RAI was discussed with your staff on December 29,2009, and it was agreed that your response would be provided within 30 days from the date of this letter.
Sincerely, Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410
Enclosure:
As stated cc wlencl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION (RAI)
NINE MILE POINT NUCLEAR STATION, LLC NINE MILE POINT, UNIT NO.2 (NMP2)
LICENSE AMENDMENT REQUEST RE: ADOPTION OF NEI-94-01, REVISION 2-A, AND EXTENSION OF TYPE A TEST INTERVAL TO 15 YEARS DOCKET NO. 50-410 The Nuclear Regulatory Commission (NRC) staff is reviewing the Nine Mile Point Nuclear Station, LLC (NMPNS or the licensee) license amendment request (LAR) application dated June 29, 2009, as supplemented on August 13, 2009. The NRC staff notes that the Type A Containment Integrated Leak Rate Test (ILRT), the Type B and Type C Local Leak Rate Tests (LLRT), and Containment In-Service Inspection (CISI) program collectively ensure leak-tight integrity and structural integrity of the containment, and has determined that additional information requested below is needed to complete its review.
Mechanical and Civil Engineering
- 1. In order for the NRC staff to assess the proper and effective implementation of the Type B and Type C local leak rate testing program, the licensee is requested to provide:
(a) A table of all containment pressure boundary components at NMP2 that are subject to the Type B and Type C testing, under the Primary Containment Leakage Rate Testing Program, with the current test frequency and the approximate dates (or refueling outage) of the last test and the next scheduled test.
(b) A summary table of LLRT results of those containment penetrations (including their test schedule intervals) that have not demonstrated acceptable performance history in accordance with the Primary Containment Leakage Rate Program and a discussion of the causes and corrective actions taken.
(c) A discussion of whether there have been any refueling outages since the last Type A test in which the combined leakage from Type B and Type C tests did not meet the acceptance criteria. Provide a discussion of the results, cause(s), and corrective actions taken.
- 2. It is stated in Section 3.2.5.1 of the LAR that, "Type C penetrations have had generally good performance and are typically tested on a 60-month interval."
(a) Given that NMP2 is on a 24-month operating cycle, discuss how a 60-month interval was implemented in the current 10 CFR Appendix J Testing Program Plan using Regulatory Guide (RG) 1.163 (September 1995) as the implementing document. In addition, discuss how a 60-month interval will be implemented using NEI 94-01, Revision 2-A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," as the implementing document.
Enclosure
-2 (b) Provide a summary of performance results for Type C penetrations that would support the statement of "generally good performance" of these penetrations.
- 3. In Section 3.2.2 of the LAR, the table entitled, "NMP2 Containment Inservice Inspection Periods (IWE/IWL)," only provides an inspection schedule that is based on Subsection IWE of the ASME Code,Section XI, and applies to the Class MC containment metallic liner and its attachments. Indicate and clarify the schedule of inspections that were, or will be, performed on the concrete containment structure in accordance with Subsection IWL, and explain how it meets the requirements in Section 9.2.3.2 of NEI 94-01, Revision 2-A, and Condition 2 in Section 4.1 of the NRC safety evaluation (SE) for topical report NEI 94-01, Revision 2-A.
- 4. Sections 3.2.2 and 3.2.3 of the LAR provide generic statements of the NMP-2 IWE/IWL lSI program. Discuss historic highlights of important findings from IWE and IWL examinations performed since the last Type A test on the containment pressure retaining structures and components, in accordance with the NMP2 CISI program, and actions taken to disposition them. In the response, provide factual information that would demonstrate proper and effective implementation of the lSI program in monitoring and managing degradation to ensure that containment structural and leak-tight integrity has been, and will continue to be, maintained through the service life of the plant. Include relevant highlights of examinations performed on the containment penetrations (with seals, gaskets, bolted connections, and bellows), the vent system, the metallic liner, and the reinforced concrete containment structure. Also, discuss highlights of findings from recent inspections from the NMP2 Drywell Coatings Inspection Program and actions taken.
- 5. Provide information of instances during implementation of the CISI program in accordance with IWE/IWL at NMP2, where existence of or potential for degraded conditions in inaccessible areas of the concrete containment structure and metallic liner were identified and evaluated based on conditions found in accessible areas, as required by 10 CFR 50.55a(b)(2)(viii)(E) and 10 CFR 50.55a(b)(2)(ix)(A). If there were any instances of such conditions, discuss the findings and actions taken.
- 6. Item 3 of the table on page 6 of 21 of the LAR states that the NMP2 containment system does not employ any moisture barriers. In the absence of a moisture barrier, relative to NRC Information Notice 2004-09, "Corrosion of Steel Containment and Containment Liner," discuss the operating experience and evaluation results, if any, of the potential for, or presence of, corrosive conditions on the inaccessible drywell floor and suppression pool floor liner.
- 7. Provide information on the operating experience or testing results with regard to detection of leakage through containment penetrations ZNMT*Z31A, 8, C, D and E with bellows. Confirm whether or not these penetrations use 2-ply bellows.
- 8. Condition 3 in Section 4.1 of the NRC SE for NEI 94-01, Revision 2-A, requires that licensees address the areas of containment structure potentially subject to degradation.
Section 3.1.3 of the NRC SE, in part, states that licensees referencing NEI 94-01, Revision 2-A, in support of a request to amend their TS should also explore/consider such inaccessible degradation-susceptible areas in plant-specific inspections, using
-3 viable, commercially available non-destructive examination (NDE) methods (such as boroscopes, guided wave techniques, etc. - see Report ORNLlNRC/LTR-02/02 "Inspection of Inaccessible Regions of Nuclear Power Plant Containment Metallic Pressure Boundaries," June 2002 (ADAMS Accession No. ML061230425), for recommendations to support plant-specific evaluations). The NRC staff's intent of this statement in the SE is that licensees should explore and consider NDE techniques such as those discussed in the reference or other methods for inspections of inaccessible degradation-susceptible areas of the containment pressure boundary to support plant specific evaluations of inaccessible areas, as these advanced technologies become commercially available and viable for implementation in practice in the future. While the staff understands that these techniques may not be commercially viable at the present time, the licensee is requested to identify areas in the NMP2 containment that are inaccessible and degradation-susceptible, and acknowledge that these NDE technologies would be explored and considered in the future for the examination of inaccessible degradation-susceptible areas of the containment, as these technologies become commercially viable.
- 9. In response to Condition 4 in Section 4.1 of the NRC SE for topical report NEI 94-01, Revision 2-A, the NMP2 response in Item 4 of the Table on page 6 of 21 of the LAR states that, "The station design change process would address testing requirements for any future containment structure modifications."
(a) Describe how the above statement addresses the requirements of Condition 4 of Section 4.1 and as discussed in Section 3.1.4 of the NRC SE for NEI 94-01, Revision 2-A, with regard to major and minor containment repairs and modifications.
(b) Address why it is appropriate to make reference to a "station design change process," which is not subject to NRC review, in an application for a licensing action.
(c) Clarify whether the repair/replacement program, which includes associated post modification testing for the NMP2 containment structure, is performed as part of the CISI program in accordance with 10 CFR 50.55a(g)(4) or as part of the "station design change process."
(d) Clarify and confirm NMPNS's understanding of the distinction between major and minor containment repair and modifications with regard to post-modification testing.
Probabilistic Risk Assessment (PRA)
- 10. Discuss the reasons for the decision to estimate the NMP population dose based on scaling of Peach Bottom population doses, given that: (1) Electric Power Research Institute Topical Report 1009325 Rev 2A indicates that the order of preference for determining population dose "shall be plant-specific best estimate, Severe Accident Mitigation Alternative (SAMA) for license renewal, and scaling of a reference plant population dose", and (2) plant-specific population dose estimates were available as part of the NMP SAMA analysis.
-4
- 11. The assessment of corrosion-induced leakage of the steel liner in Section 4.4 of Attachment 2 was based on two observed corrosion events (at North Anna 2 and Brunswick Unit 2). There have been additional instances of liner corrosion that are relevant to this assessment, including a recent finding at Beaver Valley Unit 1 (LER 2009-003-00). Provide a more comprehensive assessment of corrosion-induced leakage of the steel liner to include all observed corrosion events relevant to the NMP2 containment, and an evaluation of the impact on risk results when all relevant corrosion events are included in the risk assessment.
- 12. The discussion of PRA quality relies on a self assessment of the NMP2 PRA prior to the most recent PRA update, peer review findings for the NMP1 PRA, and the consideration of the NMP1 peer review findings during the most recent PRA update for NMP2. For the NMP2 PRA model used to support the application, provide (1) a list of findings from the NMP1 PRA peer review and NMP2 PRA self assessment that remain open for the NMP2 PRA model, and (2) the impact of these open items on this application.
January h, 201n Mr. Samuel L. Belcher Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 SUB~IECT: REQUEST FOR ADDITIONAL INFORMATION REGARDING NINE MILE POINT NUCLEAR STATION, UNIT NO.2 (NMP2) - RE: ADOPTION OF NEI-94-01, REVISION 2-A, AND EXTENSION OF PRIMARY CONTAINMENT INTEGRATED LEAKAGE RATE TEST INTERVAL TO 15 YEARS (TAC NO. ME1650)
Dear Mr. Belcher:
By letter dated June 29, 2009, as supplemented on August 13, 2009, Nine Mile Point Nuclear Station, LLC (NMPNS), submitted for Nuclear Regulatory Commission (NRC) staff review and approval, a proposed license amendment requesting to revise the Technical Specifications to replace the reference to Regulatory Guide 1.163, "Performance Based Containment Leak-Test Program," with a reference to Nuclear Energy Institute (NEI) Topical Report 94-01, Revision 2-A, as the implementation document used by NMPNS to develop the NMP2 performance-based leakage testing program in accordance with Option B of Title 10 of the Code of Federal Regulations, Appendix J.
The NRC staff is reviewing the information provided in that letter and has determined that additional information is needed to support its review. Enclosed is the NRC staff's request for additional information (RAI). The RAI was discussed with your staff on December 29,2009, and it was agreed that your response would be provided within 30 days from the date of this letter.
Sincerely, IRAI Richard V. Guzman, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\10. 50-410
Enclosure:
As stated cc wtencl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrPMNineMilePoint RidsNrrLASLittie RidsNrrDeEmcb LPLI-1 RtF RidsOGCRp RidsRgn1MailCenter RidsNrrDraApla GThomas, NRR RPalla, NRR RidsNrrAcrsAcnw&mMailCenter ADAMS Accession No.: ML100040156 ra c hanqes rnade.
- RAI provide db)v memo. No su bstan tiat ** Concurrence via-ernai'1 NRR088 OFFICE LPL1-1/PM LPL1-1/LA EMCB/BC SRXB/BC LPL1-1/BC NAME RGuzman ABaxter for SUttle MKhanna* DHarrison* NSalgado**
!DATE 1/5/10 1/5/10 12/15/09 memo dId 11/18/09 memo dtd 1/6/10 OFFICIAL RECORD COpy