UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2009 Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - CLOSEOUT OF GENERIC LETTER 2008-01, "MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS" (TAC NO. MD7891)
Dear Sir or Madam:
On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072910759). The stated purpose of GL 2008-01 was (a) to request addressees to submit information to demonstrate that the subject systems are in compliance with the current licensing and design bases and applicable regulatory requirements, and that suitable design, operational, and testing control measures are in place for maintaining this compliance; and, (b) to collect the requested information to determine if additional regulatory action is required.
GL 2008-01 requested that licensees provide the following information within 9 months of the date of the GL:
(a)
A description of the results of evaluations that were performed pursuant to requested actions specified in the GL. This description should provide sufficient information to demonstrate that you are or will be in compliance with the quality assurance criteria in Sections III, V, XI, XVI, and XVII of Appendix B to 10 CFR Part 50 and the licensing basis and operating license as those requirements apply to the subject systems; (b)
A description of all corrective actions, including plant, programmatic, procedure, and licensing basis modifications that you determined were necessary to assure compliance with these regulations; and, (c)
A statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule.
In your letters dated April 10, 2008, October 14, 2008, January 28, 2009, and October 21, 2009, (ADAMS Accession Nos. ML081120227, ML082910292, ML090370418, and ML0930304850 respectively), you provided information in response to the GL. The NRC staff has reviewed the submitted information and has concluded that for the Vermont Yankee Nuclear Power Station, your response to the GL is acceptable. Consequently, your GL response is considered closed
- 2 and no further information or action is requested of you. Notwithstanding, the NRC's Region I staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-4125.
Sincerely, Ie--
James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271 cc: Distribution via Listserv
- 2 and no further information or action is requested of you. Notwithstanding, the NRC's Region I staff may decide to perform (and would contact you to schedule) an inspection using Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems (NRC Generic Letter 2008-01)" (ADAMS Accession No. ML082950666). The TI 2515/177 is confirmatory in nature in that it directs NRC inspectors to selectively verify that the licensee has implemented or is in the process of acceptably implementing the commitments, modifications, and programmatically controlled actions described in the licensee's response to GL 2008-01 and the plant-specific information supports a conclusion that subject systems operability is reasonably ensured.
If you have any questions regarding this letter, please feel free to contact me at (301) 415-4125.
Sincerely, IRA!
James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-271 cc: Distribution via Listserv Distribution:
PUBLIC RidsNrrDorlLpl1-1 Resource RidsNrrPMVermontYankee LPL1-1 RtF RidsOgcRp Resource RidsNrrDorlDpr Resource RidsNrrLASLittie RidsNrrDssSrxb Resource RidsRgn 1MailCenter RidsAcrsAcnw MailCenter Resource ADAMS Accession Number: ML093490486
- See memo dated December 9,2009 OFFICE LPL1-1:PM LPL1-1:LA SRXB:BC LPL1-1/BC NAME JKim SLittie GCranston*
JBoska IRA! for NSalgado DATE 12/17/09 12/17/09 12/9/2009 12/22/09 OFFICIAL RECORD COPY