Forwards Addl Info Re Environ Qualification of safety-related Electrical Equipment,Per NRC 820107 Request. Info Submitted to Franklin Research Ctr
ML093430849
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 02/04/1982
From: Bayne J
Power Authority of the State of New York
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML093430851 List:
References
IEB-79-01B, IEB-79-1B, IPN-82-11, NUDOCS 8202090331
Download: ML093430849 (2)


Text

POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK, N. Y. 10019 (212) 397.6200 GEORGE T. BERRY PRESIDENT & CHIEF TRUSTEES OPERATING OFFICER JOHN S. DYSON JOHN W. BOSTON EXECUTIVE VICE CHAIRMAN PRESIDENT-PROCEDURES

& PERFORMANCE GEORGE L. INGALLS VICE CHAIRMAN JOSEPH R. SCHMIEDER EXECUTIVE VICE RICHARD M. FLYNN P RESIDENT & CHIEF E NGINEER ROBERT I. MILLONZI LEROY W. SINCLAIR SENIOR VICE PRESIDENT FREDERICK R. CLARK

  • CHIEF FINANCIAL February 4, 1982 OFFICER IPN-82-11 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing

Subject:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 Environmental Qualification of Safety Related Electrical Equipment-Submittal of Additional Information.

Dear Sir:

By letter dated January 7, 1982 you requested that the documents listed in the enclosure to your letter should be submitted directly to your contractor, Franklin Research Center (FRc).

This letter confirms that the requested information was forwarded to FRC. In addition, the submittal'also contains other analyses, reports and recent assessments of safety-related penetrations at Indian Point 3.

The Westinghouse report of test results of Hydrogen Flame Recombiner, WCAP-7301-L, is not included in this submittal. Due to the proprietary nature of the report, a written authorization for release has been requested from the Westinghouse. WCAP 7301-L will be submitted as soon as the Authority receives the Westinghouse authorization. Also, it is the Authority's understanding that the NRC is in the possession of this report.

If you or your staff have any questions, please do not hesitate to contact us.

Very truly yours,A%

-Senior Vice Prsident Nuclear Generation cc included 8__202090331 820204 PDR ADOCK 05000286 P PDR.

-2 cc: Mr. W. H. Bauncak, Senior Resident Inspector Indian Point Unit 3 U. S. Nuclear Regulatory Commission P. 0. Box 38 Buchanan, New York 10511 Mr. W. J. Kenny, Resident Inspector Indian Point Unit 3 U. S. Nuclear Regulatory Commission P. 0. Box 38 Buchanan, New York 10511 Mr..Ron Barton United Engineers &.Constructors, Inc.

30 S. 17th Street Philadelphia, Pa. 19101 Mr. Cyril Y. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, Pa. 19103