ML092940760

From kanterella
Jump to navigation Jump to search
Initial Exam 2008-301 Final Sim/In - Plant JPMs
ML092940760
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/20/2009
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
50-413/08-301, 50-414/08-301
Download: ML092940760 (109)


Text

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 A Perform a Manual Makeup to the VCT CANDIDATE EXAMINER JPM08 A Page 1 of 9

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Perform a Manual Makeup to the VCT Alternate Path: NO Facility JPM #: OP-CN-PS-NV-115 (Last used on 2005 NRC Exam)

KIA Rating(s): 004 A4.12 (3.8/3.3)

Task Standard:

Volume control tank (VCT) level increased to approximately 58% using the correct blended makeup of boron and demineralized water.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator -_X__

X- - - In-Plant -

-- Perform X Simulate - - -

Procedure

References:

OP/1/A/61501009 OP/1/A/6150/009 (Boron Concentration Control) Enclosure 4.5 rev 065 Unit 1 OAC Data Book (or Simulator OAC)

Validation Time: 18 minutes Time Critical: NO

==============================================================

Candidate: Time Start: -

NAME Time Finish: -

Performance Ratings:

SAT _ __ UNSAT ___

_ __ Question Grade --~~-

Performance Time - --

Examiner:

- - - - -NAME


--------------~/----


_.1------

SIGNATURE DATE

===============================================================

COMMENTS JPM08 A Page 2 of 9

SIMULATOR SET- UP SHEET

1. Reset to any BOC IC set.
2. Ensure VCT makeup controls in manual and all makeup pumps in "OFF".
3. Place 1NV-172 in the "RHT" position.
4. Run simulator until 30% VCT level is reached.
5. Ensure that 1NV-172 is returned to the "AUTO" position.
6. FREEZE simulator and write to a snap.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS

1. Ensure the makeup totalizers are reset prior to each JPM.

TOOLS/EQUIPMENT/PROCEDURES NEEDED

1. OP/1/A/61501009 (Boron Concentration Control) rev 065
2. Unit 1 OAC Data Book. (or Simulator OAC)

JPM08 A Page 3 of 9

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • VCT automatic makeup is out of service for calibration by IAE INITIATING CUE:

The Control Room Supervisor (CRS) directs you to perform a manual blended makeup to increase VCT level to 58% per OP/1/A/6150/o09, Boron Concentration Control, Enclosure 4.5 beginning at step 2.2.

Peer checks are waived for this JPM.

JPM08 A Page 4 of 9

START TIME:

Step 2.2 Determine the volume of makeup desired. Critical Step Total desired makeup: gal SAT STANDARD: Based on existing VCT level and final required VCT level, operator performs the following using the OAC Databook curve _UNSAT or calculation.

OAC Calculation is made by inserting the Initial and Final levels in Percent then subtract the gallons at each level to determine the batch volume required. For 30% (1127 gal) - 58% (1664 gal) this should be approximately 537 gallons.

OAC CURVE: Acceptable range is 500 to 600 gallons COMMENTS:

Note: The RMWST boron concentration has an insignificant effect on the calculation at higher outlet concentrations. The RMWST boron concentration term may be considered "0" when the desired concentration is greater than 100 ppm.

Step 2.3 IF blended makeup is desired, calculate the amount of boric acid to be Critical Step added as follows (R.M.):

SAT Boric acid gal =Vf (Cf - Cw)

(Ca - Cw) UNSAT where Vf is the total makeup volume from Step 2.2 Cf is the desired boron concentration Cw is the RMWST boron concentration Ca is the BAT boron concentration STANDARD: 537 ( 1375 - 0) = 98.45 gallons (7500 - 0)

EXAMINER NOTE: (Acceptable range for 500 to 600 gallons of makeup 91.6 to 110 gallons)

COMMENTS:

JPM08 A Page 5 of 9

Step 2.4 IF boric acid is to be added, ensure one boric acid transfer pump is in Critical Step "ON".

SAT STANDARD: Places boric acid pump 1A or 1B control switch to "ON" and verifies the red ON light is lit. UNSAT COMMENTS:

Step 2.5 IF reactor makeup water is to be added, ensure one reactor makeup Critical Step water pump is in "ON".

SAT STANDARD: Places reactor makeup 1A or 1B control switch to "ON" and verifies the red ON light is lit. UNSAT COMMENTS:

NOTE: Normally 1NV-186A (BfA Blender Otlt To VCT Otlt) is the preferred makeup flowpath. 1NV-181A (BfA Blender Otlt To VCT) may be used to limit oxygen addition from the makeup source.

Step 2.6: Place one of the following in the "OPEN" position to align a flowpath to Critical Step the VCT. (R.M.)

UNSAT STANDARD: Positions 1NV-186A switch to the OPEN position and verifies the red OPEN light is lit.

COMMENTS:

JPM08 A Page 6 of 9

NOTE: Steps 2.7 and 2.8 may be performed concurrently, as required, to achieve the proper blend.

Step 2.7 IF reactor makeup water is to be added, perform the following: Critical Step NOTE: If blended makeup is being added, 1NV-242A (RMWST To BfA Blender SAT Ctrl) may be manually controlled to allow proper blending of makeup.

UNSAT 2.7.1 Operate 1NV-242A (RMWST To BfA Blender Ctrl) as required.

(RM.)

2.7.2 Monitor the total makeup batch counter.

STANDARD: May operate the 1NV-242A switch; OPEN and CLOSED, as required while monitoring the batch counter.

COMMENTS:

Step 2.8 IF boric acid is to be added, perform the following: Critical Step NOTE: If blended makeup is being added, 1NV-238A (BfAXfer Pmp To Blender SAT Ctrl) may be manually controlled to allow proper blending of makeup.

UNSAT 2.8.1 Operate 1NV-238A (BfAXfer Pmp To Blender Ctrl) as required.(RM.)

2.8.2 Monitor the boric acid batch counter.

STANDARD: May operate the 1NV-238A switch; OPEN and CLOSED, as required while monitoring the batch counter.

COMMENTS:

Step 2.9 WHEN the desired volume(s) as determined in Step 2.2 AND IF Critical Step applicable, Step 2.3 is(are) reached on the total makeup batch counter andfor the boric acid batch counter, ensure the following valves are SAT closed to secure manual makeup (RM.):

UNSAT

STANDARD: When the batch counters reach the amount determined in steps 2.2 and 2.3, the operator ensures that 1NV-242A and 1NV-238A are closed.

COMMENTS:

JPM08 A Page 7 of 9

Step 2.10 Close the valve opened in Step 2.6

- SAT

  • 1NV-186A (BfA Blender Otlt To VCT Otlt) - UNSAT STANDARD: Operator selects CLOSE for 1NV-186A and verifies the green CLOSE light is lit.

COMMENTS:

Step 2.11 IF NOT required for current plant conditions, place pump (s) started in Step 2.4 andfor 2.5 in "OFF". - SAT STANDARD: Per the cue, places the pumps switches started in steps 2.4 and - UNSAT 2.5 to OFF and verify the green OFF lights are lit.

EXAMINERS CUE: The Control Room Supervisor directs you to place the pumps switches to off while IAE continues to calibrate the makeup system.

COMMENTS:

NOTE: If additional boric acid additions will be performed over the course of the shift, flushing the makeup line is NOT recommended.

Step 2.12 IF boric acid only was added AND it is desired, flush the makeup line as follows: - SAT STANDARD: Step does NOT apply and continues. - UNSAT COMMENTS:

Step 2.13 IF automatic makeup is desired, perform one of the following:

- SAT EXAMINER CUE: Another operator will align the makeup system when calibration is complete. - UNSAT COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM08 A Page 8 of 9

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • VCT automatic makeup is out of service for calibration by IAE INITIATING CUE:

The Control Room Supervisor (CRS) directs you to perform a manual blended makeup to increase VCT level to 58% per OP/1/A/6150/009, Boron Concentration Control, Enclosure 4.5 beginning at step 2.2.

Peer checks are waived for this JPM.

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 B Respond To NC System Leakage CANDIDATE EXAMINER JPM08 B Page 1 of 15

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Respond to NC System leakage.

Alternate Path:

YES Facility JPM #:

OP-CN-PS-NC-091 KIA Rating(s):

002 A2.01 (4.3/4.4)

Task Standard:

PZR level and pressure are stable (slight trend in either direction is considered stable) and the location of the leak is identified to be in containment.

Preferred Evaluation Simulator: Preferred Evaluation Perform

. Simulator X _ __

In-Plant - Perform _..e..X~

_...:..X~ Simulate _ __

References:

AP/1/A/55001010 (Reactor Coolant Leak), Case 2 rev 048 Validation Time: 18 min. Time Critical: No

=======================================================================

Candidate: Time Start Start:: -

NAME Time Finish: -_-__-

Performance Rating: SAT ___ UNSAT _ __ Question Grade -_- _- _ Performance Time -_- _- _

Examiner: _ _ _ _ _ _ _ _ _ _ _ __


~N~A~M~E-------

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM08 B Page 2 of 15

SIMULATOR SETUP SHEET

1. Select a 100% power (EOl) IC.
2. Insert MAl-NC013A (RCS Cold leg A leak), select 0.2 (- 25 GPM).
3. Allow simulator to run until pressurizer level is decreasing, BUT prior to receiving HVAC panel trouble annunciators.
4. Makeup to VCT as necessary to ensure level is -55%.
5. Freeze simulator and write to a snap. _ _ _ __

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS

1. Ensure that 1NCCR5160 and 1NCCR5161 (on MC-1) are advanced prior to starting the JPM.
2. When JPM Step 11 is read insert MAl-NC013A (RCS Cold leg A leak), select 0.4 TOOLS/EQUIPMENT/PROCEDURES NEEDED
1. AP/1/A/55001010 (Reactor Coolant leak) Case II rev 048
2. Unit 1 OAC Data Book. (or Simulator OAC)

JPM08 B Page 3 of 15

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • PZR level is decreasing
  • Charging flow has increased.

INITIATING CUES:

You are the BOP. The Control Room Supervisor directs you to perform AP/1/A/55001010 (Reactor Coolant Leak) Case II, to respond to the suspected leakage and to determine the location of the leak.

JPM08 B Page 4 of 15

START TIME: _ __

STEP 1: Monitor Enclosure 2 (Case II NC System Leak Foldout Page).

- SAT STANDARD: Examinee notes the requirement.

EXAMINER'S CUE: OATC is monitoring Enclosure 2.

- UNSAT COMMENTS:

STEP 2: Verify Unit 1 - IN MODE 5.

- SAT STANDARD: Examinee notes Unit 1 in Mode 1 and does RNO COMMENTS:

- UNSAT STEP 2 RNO: GO TO Step 4.

- SAT STANDARD: Examinee proceeds to step 4.

COMMENTS:

- UNSAT STEP 4: Verify Pzr level: STABLE OR INCREASING.

- SAT STANDARD: Notes PZR level trend decreasing.

COMMENTS:

- UNSAT JPM08 B Page 5 of 15

STEP 4 RNO: Maintain charging flow less than 180 gpm.

- SAT STANDARD: Maintains charging flow <180 gpm on 1NVP5630 (1MC-10).

COMMENTS:

- UNSAT STEP 4 RNO: Manually throttle 1NV-294 (NV Pmps A&B Flow Ctrl) to stabilize Pzr Critical Step level.

- SAT STANDARD: Depresses 1NV-294 red' "MAN" pushbutton and verifies red "MAN" light lit (on MC-11). Adjusts charging flow to stabilize Pzr level indication

- UNSAT COMMENTS:

STEP 4 RNO: IF Pzr level is stable OR increasing THEN GO TO Step 5.

STANDARD: Determines Pzr level is stable and goes to step 5. - SAT COMMENTS:

- UNSAT STEP 5: IF AT ANY TIME Pzr level decreases in an uncontrolled manner or cannot be maintained greater than 4%, THEN perform Step 2. - SAT STANDARD: Examinee notes the requirements.

COMMENTS: - UNSAT JPM08 B Page 6 of 15

STEP 6: Verify PZRlNC pressure - TRENDING TO OR STABLE AT DESIRED PRESSURE. - SAT STANDARD: PZR pressure trend is increasing to ~2235 psig.

COMMENTS: - UNSAT EXAMINER NOTE: If candidate determines the leak is in containment, this step may be determined a safety hazard and no operators dispatched. - SAT STEP 7: Dispatch operators to locate and isolate NC System leak.

STANDARD: If operators are contacted, give the following cue and repeat back - UNSAT what you are told.

EXAMINER'S CUE: This is Jerry of Operations. I understand that I am to ...... (repeat back instructions given by examinee).

COMMENTS:

STEP 8: Verify proper VCIYC system operation. REFER TO Enclosure 14 (Control Room Ventilation System Verification) - SAT STANDARD: Examinee verbalizes requirement.

EXAMINER'S CUE: Another operator is verifying proper VCIYC operation per - UNSAT Enclosure 14.

COMMENTS:

JPM08 B Page 7 of 15

STEP 9: IF AT ANY TIME 1AD-7, 1/1 "VCT LO LVL" alarm is lit, THEN align NV pump suction to the FWST as follows ... - SAT STANDARD: Verify's 1AD-7, 111 is dark and notes requirement.

COMMENTS: - UNSAT STEP 10: Determine NC leak rate by any of the following methods. Critical Step

  • Compare charging and letdown flow

- SAT

  • Monitor OAC NV Graphic
  • Initiate OAC Program "NSNCLEAK"
  • Monitor OAC point EROPLEAK

- UNSAT

  • Monitor OAC point C1 P0976(Gross NC System Leak Rate, ten min run avg)

STANDARD: Per OAC NV Graphic DIFF between charging and letdown/seal return is 50 gpm EXAMINER NOTE: The OAC NV Graphic is the most applicable place to get a sense of the size of the leak since it is fairly small.

COMMENTS:

STEP 11: Ensure compliance with appropriate Tech Specs and Selected Licensee Commitments Manual. - SAT STANDARD: Examinee verbalizes requirement.

EXAMINER'S CUE: Control Room Supervisor will perform a Tech Spec and SLC - UNSAT evaluation per items listed in AP/1/A/5500/01 O.

EXAMINER NOTE: At this point the NC Leak will be increased causing PZR Level to decrease. Per step 5, the operator should return to step 2 and stabilize PZR Level.

Those actions are given after step 18 of this JPM.

COMMENTS:

JPM08 B Page 8 of 15

STEP 12: Verify Auxiliary Building radiation is normal as follows:

SAT

  • EMF-41 TRIP 1 light DARK and COUNTRATE STABLE -
  • All area monitor EMF TRIP 1 lights DARK .

STANDARD: Checks all area EMF trip 1 lights DARK and EMF41 trip 1 light DARK - UNSAT and digital readout stable at radiation monitor panels behind 1MC-13 COMMENTS:

STEP 13 NOTE: letdown flow and pressure are monitored between the letdown HX and 1NV-148 (letdn Press Control) - SAT STANDARD: Candidate acknowledges NOTE and continues COMMENTS: - UNSAT STEP 13: Verify letdown lines intact.

- SAT STANDARD: Determines letdown lines intact by checking letdown relief temperatures, 1NV-148 operation, letdown and charging line temperatures and flows.

- UNSAT COMMENTS:

STEP 14: Verify the following NC pump thermal barrier alarms dark:

SAT

  • 1AD-6, E/1, NCP A Thermal Barrier KC Outlet Hillo Flow -
  • 1AD-6, El2 NCP B Thermal Barrier KC Outlet Hillo Flow
  • 1AD-6, E/3, NCP C Thermal Barrier KC Outlet Hillo Flow UNSAT
  • 1AD-6, E/4, NCP D Thermal Barrier KC Outlet Hillo Flow -

STANDARD: Verifies all listed annunciators are dark.

COMMENTS:

JPM08 B Page 9 of 15

STEP 15: Verify 1EMF-46A and 1EMF-46B (Component Cooling) Trip 1 lights dark and countrate stable. SAT STANDARD: Verifies yellow "TRIP 1" light dark and countrate stable for the following EMFs (Process Radiation Monitor Panel):

COMMENTS:

STEP 16: Verify containment conditions are normal. "Containment EMF" Trip 1 Critical Step light dark and count rate stable:

  • Containment floor and equipment sump level(s)- STABLE UNSAT STANDARD: Containment EMF38 and EMF-39 will be in a Trip 1 or 2 condition due to NC leak is inside containment and/or containment floor and equipment sump level increasing.

EXAMINER NOTE: The critical step is for the candidate to verbalize either here or elsewhere during the JPM that that leak is inside containment (per the initiating cue).

If candidate does NOT volunteer this information, a follow-up question should be used.

COMMENTS:

STEP 16 RNO: Stop any VQ release in progress. REFER TO OP/1/A/6450/017 (Containment Air Release and Addition System). SAT STANDARD: Examinee vocalizes requirement.

EXAMINER CUE: No VQ releases are in progress. UNSAT COMMENTS:

JPM08 B Page 10 of 15

STEP 17: Verify NCDT conditions are normal as follows:

- SAT

  • NCDT pressure - STABLE
  • NCDT level - STABLE
  • NCDT discharge flow - EQUAL TO RECIRC FLOW
  • NCDT temperature - STABLE. - UNSAT STANDARD: Determines all above are at normal values.

COMMENTS:

STEP 18: Verify PRT conditions are normal as follows:

  • PRT level - LESS THAN 89%
  • PRT temperature - LESS THAN 130°F.

STANDARD: Determines all above are at normal values. - UNSAT EXAMINER'S CUE: SRO and OATC will complete the rest of this procedure.

COMMENTS:

THIS IS WHERE TO START ONCE STUDENT RETURNS TO STEP 2.

STEP 2: Verify Unit 1 -IN MODE 5.

- SAT STANDARD: Examinee notes Unit 1 in Mode 1 and does RNO COMMENTS:

- UNSAT STEP 2 RNO: GO TO Step 4.

- SAT STANDARD: Examinee proceeds to step 4.

COMMENTS:

- UNSAT JPM08 B Page 11 of 15

EXAMINER NOTE: The following steps will be used following step 11 when the leak Critical Step is increased and the operator must return to step 2 per the Step 5 IF AT ANY TIME condition: - SAT STEP 4: Verify Pzr level: STABLE OR INCREASING.

STANDARD: PZR level trend decreasing. - UNSAT COMMENTS:

STEP 4 RNa: a. Maintain charging flow less than 180 gpm.

- SAT STANDARD: Maintains charging flow <180 gpm on 1NVP5630 (1MC-10).

COMMENTS:

- UNSAT STEP 4 RNO: b. Manually throttle 1NV-294 (NV Pmps A&B Flow Ctrl) to stabilize Pzr Critical Step level.

- SAT STANDARD: Depresses 1NV-294 red "MAN" pushbutton and verifies red "MAN" light lit (on MC-11). Adjusts charging flow to maximum.

COMMENTS: - UNSAT STEP 4 RNa: c. IF Pzr level is stable OR increasing THEN GO TO Step 5.

STANDARD: Determines Pzr level is still decreasing continues to step 4 RNO d. - SAT COMMENTS:

- UNSAT JPM08 B Page 12 of 15

STEP 4 RNO: d. IF Pzr level continues to decrease, THEN:

1) Reduce letdown flow to 45 GPM as follows:

a) IF 1NV-10A (Letdn Orif 1B Otlt Cont Isol) open, - SAT THEN perform the following:

(1) Manually control 1NV-148 (Letdn Press Control) to establish letdown pressure between 375 - 400 PSIG. - UNSAT STANDARD: Operates 1NV-148 to establish letdown pressure 375-400 PSIG.

COMMENTS:

STEP 4 RNO: (2) Throttle 1NV-849 (Letdn Flow Var Orif Ctrl) for 45 GPM letdown Critical Step flow.

- SAT STANDARD: Adjusts 1NV-849 to decrease letdown flow to 45 GPM.

COMMENTS:

- UNSAT STEP 4 RNO: (3) WHEN 45 GPM letdown flow established, THEN adjust 1NV-148 (Letdn Press Control) to maintain letdown pressure at 350 PSIG.

- SAT STANDARD: Adjust 1NV-148 to restore letdown pressure to 350 PSIG.

COMMENTS:

- UNSAT STEP 4 RNO: 4) WHEN letdown pressure is stable at 350 PSIG, THEN place 1NV-148 (Letdn Press Control) in "AUTO".

- SAT STANDARD: Place 1NV-148 to auto.

COMMENTS:

- UNSAT JPM08 B Page 13 of 15

STEP 4 RNO: b) IF 1NV-13A (Letdn Orif 1A Otlt Cont Isol) open, THEN perform the following:

- SAT STANDARD: Determines 1NV-13A is closed and step is NOT applicable.

COMMENTS:

- UNSAT STEP 4 RNO: 2) IF Pzr level continues to decrease, THEN ensure the following Critical Step valves closed:

  • 1NV-1 OA (Letdn Orif 1B Otlt Cont Isol) - SAT
  • 1NV-11 A (Letdn Orif 1C Otlt Cont Isol)
  • 1NV-13A (Letdn Orif 1A Otlt Cont Isol)

STANDARD: Closes 1NV-1 OA and determines 1NV-11A and 1NV-13A are closed. - UNSAT COMMENTS:

STEP 2 RNO: IF Pzr level is stable OR increasing THEN GO TO Step 5.

STANDARD: Determines Pzr level is stable or increasing. - SAT EXAMINER'S CUE: SRO and OATC will complete the rest of this procedure.

COMMENTS: - UNSAT This JPM is complete.

TIME STOP: _ __

JPM08 B Page 14 of 15

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 is at 100% power.
  • PZR level is decreasing
  • Charging flow has increased.

INITIATING CUES:

You are the BOP. The Control Room Supervisor directs you to perform AP/1/A/5500101 0 (Reactor Coolant Leak) Case II, to respond to the suspected leakage and to determine the location of the leak.

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 C Depressurize the NC System to Minimize Primary to Secondary Leakage during a SGTR CANDIDATE EXAMINER JPM08 C Page 1 of 8

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Depressurize the NC System to Minimize Primary to Secondary Leakage during a SGTR Alternate Path:

YES Facility JPM #:

OP-CN-EP-EP4-005 KIA Rating(s):

038 EA 1.04 (4.3/4.1 )

Task Standard:

NC System is depressurized per step 20 until one of the criteria is met, and NC pumps A and Bare tripped when 1NC-27 does not re-close.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ _ Perform X Simulate _ _

References:

EP/1/A/5000/E-0 (Reactor Trip or Safety Injection) rev 031 EP/1/A/5000/E-3 (Steam Generator Tube Rupture) rev 032 Validation Time: 13 min. Time Critical: No

=======================================================================

Candidate: Time Start : - - -

NAME Time Finish: _ __

Performance Rating: SAT _ _ UNSAT _ _ Question Grade _ _ Performance Time _ _

Examiner: _ _ _ _..,--:-:-:-:-::::--_ _ _ __

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM08 C Page 2 of 8

SIMULATOR SETUP SHEET

1. Select 100% power (MOL) IC set.
2. Insert MAL SG001A (S/G A Tube leak), Value =365 (gpm leak rate).
3. Insert MAL IPE003B (PZR Spray Vlv NC-27 FAIL, NO MAN CTRL), EVENT 1
4. Go to RUN and complete all actions of EP/E-O AND EP/E-3 through step 19.
5. Insert EVENT 1 as LNC_5150::: 45 (This will cause NC27 to not reclose once PZR level is greater than 45%)
6. FREEZE simulator and write to a snap.

ICset IC set____________

SIMULATOR OPERATOR INSTRUCTIONS:

None.

TOOLS/EQUIPMENT/PROCEDURES NEEDED

1. EP/1/A/5000/E-3 (Steam generator Tube Rupture) rev 032 JPM08 C Page 3 of 8

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 was operating at 100% power when S/G 1A suffered a steam generator tube rupture.
  • Recovery actions were taken per EP/1/A/5000/E-0 (Reactor Trip and Safety Injection)
  • The crew transitioned to EP/1/A/5000/E-3 (Steam Generator Tube Rupture) and completed it through Step 19.
  • You are the Unit 1 BOP on duty.

INITIATING CUES:

The Control Room Supervisor (CRS) has instructed you to depressurize the NC System per step 20 of EP/1/A/5000/E-3 (Steam Generator Tube Rupture).

JPM08 C Page 4 of 8

START TIME: _ __

STEP 20: Depressurize NC System using PZR spray as follows:

a. Verify normal Pzr spray flow available SAT STANDARD: Verifies NC pump A or B in operation to support spray flow.

COMMENTS: UNSAT STEP 20: b. Verify PZR level - less than 76% (73% ACC)

SAT STANDARD: Verifies PZR level less than 76 %.

COMMENTS:

UNSAT Critical Step STEP 20: c. Depressurize NC system with maximum available spray.

STANDARD: Examinee opens normal PZR spray valves (1 NC-27 and 1NC-29) fully. SAT COMMENTS:

UNSAT STEP 20: d. IF AT ANY TIME during this step one of the following conditions exists: SAT

  • Spray valves are not effective in reducing NC pressure OR
  • Ruptured S/G(s) NR level is approaching 83% (82% ACC)

UNSAT THEN GO TO Step 21.

STANDARD: Examinee notes the requirement.

COMMENTS:

Critical Step STEP 20: e. Do not continue until at least one of the following conditions satisfied:

  • NC subcooling based on core exit TICs - LESS THAN OaF - SAT OR
  • Pzr level- GREATER THAN 76% (73% ACC)

OR

  • Both of the following: - UNSAT
  • NC pressure - LESS THAN RUPTURED S/G(s)

PRESSURE AND

  • Pzr level- GREATER THAN 11% (20% ACC).

STANDARD: Examinee continues to depressurize NC system until one of the following is satisfied:

  • NC subcooling based on core exit TICs less than OaF.
  • PZR level greater than 76% (73% ACC)
  • Ruptured S/G(s) NR level is approaching 83% (82% ACC)
  • NC pressure less than ruptured SIG pressure and PZR level greater than 11 % (20% ACC)

COMMENTS:

Critical Step STEP 20f: f. Close the following valves:

1) PZR spray valves.

- SAT STANDARD: Examinee attempts to close the spray valves opened previously. 1NC-27 (PZR Spray Ctrl Frm Loop A) (1 MC1 0) will NOT close. 1NC-29 does close.

- UNSAT COMMENTS:

Critical Step STEP 20f RNO: 1) IF spray valve(s) will not close, THEN:

a) Stop NC pumps 1A and 1B.

- SAT STANDARD: Examinee trips both NCP A and B.

COMMENTS:

- UNSAT STEP 20f RNO: b) IF NC pressure continues to decrease, THEN stop third NC pump as required. - SAT STANDARD: Determines pressure is increasing.

COMMENTS: - UNSAT STEP 20f: Close the following valve( s):

2) 1NV-37A (NV Supply to Pzr Aux Spray) - SAT STANDARD: Determines valve is closed.

COMMENTS: - UNSAT STEP 20: g. Observe caution prior to step 23 and go to step 23.

- SAT STANDARD: If the examinee continues in the procedure, give the following terminal cue:

EXAMINER CUE: Another operator will complete the procedure. - UNSAT COMMENTS:

This JPM is complete.

TIME STOP: _ __

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 was operating at 100% power when S/G 1A suffered a steam generator tube rupture.
  • Recovery actions were taken per EP/1/A/5000/E-0 (Reactor Trip and Safety Injection)
  • The crew transitioned to EP/1/A/5000/E-3 (Steam Generator Tube Rupture) and completed it through Step 19.
  • You are the Unit 1 BOP on duty.

INITIATING CUES:

The Control Room Supervisor (CRS) has instructed you to depressurize the NC System per step 20 of EP/1/A/5000/E-3 (Steam Generator Tube Rupture).

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 D Cooldown the PRT Using NCDT Heat Exchanger CANDIDATE EXAMINER JPM08 D Page 1 of 9

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Cooldown the PRT Using NCDT Heat Exchanger Alternate Path:

NO Facility JPM #:

OP-CN-PS-NC-085 KJA Rating(s):

007 GENERIC 2.1.23 (4.3/4.4) Ability to perform specific system and integrated plant procedures during all modes of plant operation. (CFR: 41.10/43.5/45.2/45.6)

Task Standard:

PRT aligned for cooldown via the NCDT Heat Exchanger.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ Perform _...:...X.!.-- Simulate _ __

References:

OP/1/A/61501004 (Pressurizer Relief Tank) Enc!. 4.3 rev 026 Validation Time: 10 min. Time Critical: No

=======================================================================

Candidate: Time Start: _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Question Grade _ __ Performance Time _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM08D Page 2 of 9

SIMULATOR SETUP SHEET

1. Reset to any 75% snap.
2. Energize Pzr Heaters to maintain pressure.
3. Insert MAL-NC002B PORV Failure NC-34A - Value = 2% to increase PRT temperature.
4. When PRT temperature is greater than 118°F. Clear the malfunction and secure A,B, and D heaters once NC pressure is at 2235 psig.
5. Acknowledge any annunciators and stabilize the unit.
6. Freeze the simulator and write to a snap.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

None.

TOOLS/EQUIPMENT/PROCEDURES NEEDED

1. OP/1/A/6150/004 (Pressurizer Relief Tank) Encl. 4.3 rev 026 NOTE: This JPM can be run in the UNIT 2 Control Room using the additional alternate Unit 2 numbers in parentheses/bold and the italicized cues.

JPM08 D Page 3 of 9

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A Pzr PORV leak earlier caused PRT temperature to increase.

INITIATING CUE:

The SRO directs you to initiate the lineup to cool the PRT using the NCDT Heat Exchanger, per OP/1 (2)/A/6150/004 (Pressurizer Relief Tank), Enclosure 4.3. All initial conditions have been completed.

JPM08 D Page 4 of 9

START TIME: _ __

STEP 2.1: Stop the NCDT Pump(s).

SAT

  • NCDT Pump 1A (2A) -
  • NCDT Pump 1B (28)

- UNSAT STANDARD: Depress "OFF" pushbutton for NCDT PUMP 1A (2A) and/or 1B (28).

Verify GREEN "OFF" light lit (1 MC-11).

EXAMINER CUE: The Green "OFF" light is lit for pumps 2A and 28.

COMMENTS:

STEP 2.2: Close the following valves:

SAT

(2WL-464 (NCDT Outlet)

STANDARD: Depress "CLOSE" pushbutton for 1WL-464 (2WL-464). Verify - UNSAT GREEN "CLOSED" light lit and RED "OPEN" light dark (1 MC-11).

EXAMINER CUE: The GREEN "CLOSED" light lit and RED "OPEN" light is dark.

COMMENTS:

JPM08 D Page 5 of 9

STEP 2.2: Close the following valves:

SAT

(2WL-BOO (NCDT Pumps Recirc Isol))

STANDARD: Depress "CLOSE" pushbutton for 1WL-800 (2WL-BOO). Verify - UNSAT GREEN "CLOSED" light lit and RED "OPEN" light dark (1 MC-11).

EXAMINER CUE: The GREEN "CLOSED" light lit and RED "OPEN" light is dark.

COMMENTS:

STEP 2.2: Close the following valves:

SAT

(2WL-B05A (NCDT Pump Disch Cont Isol))

STANDARD: Depress "CLOSE" pushbutton for 1WL-805A. Verify GREEN - UNSAT "CLOSED" light lit and RED "OPEN" light dark (1 MC-11).

EXAMINER CUE: The GREEN "CLOSED" light lit and RED "OPEN" light is dark.

COMMENTS:

JPM08 D Page 6 of 9

STEP 2.3: Open the following valves: Critical Step

(2NC-107 (PRT To NCDT Pmps Suet))

SAT STANDARD: Depress "OPEN" pushbutton for 1NC-107 (2NC-107). Verify RED "OPEN" light lit and GREEN "CLSD" light dark (1 MC-11).

UNSAT EXAMINER CUE: The RED "OPEN" light lit and GREEN "CLSD" light is dark.

COMMENTS:

STEP 2.3: Open the following valves: Critical Step

SAT (2WL-495 (NCDT Pumps Disch Cont 1501>>

STANDARD: Depress "OPEN" pushbutton for 1WL-495 (2WL-495). Verify RED "OPEN" light lit and GREEN "CLSD" light dark (1 MC-11). UNSAT EXAMINER CUE: The RED "OPEN" light lit and GREEN "CLSD" light is dark.

COMMENTS:

JPM08D Page 7 of 9

STEP 2.4: Start either Reactor Coolant Drain Tank Pump. Critical Step

  • NCDT Pump 1A (2A)

SAT OR

  • NCDT Pump 1B (28)

UNSAT STANDARD: Depress RED "ON" pushbutton for NCDT PUMP 1A (2A) or 1B (28).

Verify RED "ON" light lit (1 MC-11).

EXAMINER CUE: The RED "ON" light is lit for 2A (or 28) NCDT pump.

COMMENTS:

EXAMINER NOTE: When PRT temperature is decreasing, provide the following cue to stop the JPM.

EXAMINER CUE: Another operator will monitor PRT temperature and complete the enclosure.

This JPM is complete.

TIME STOP: _ __

JPM08D Page 8 of 9

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A Pzr PORV leak earlier caused PRT temperature to increase.

INITIATING CUE:

The SRO directs you to initiate the lineup to cool the PRT using the NCDT Heat Exchanger, per OP/1 (2)/A/6150/004 (Pressurizer Relief Tank), Enclosure 4.3. All initial conditions have been completed.

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 E Restore Offsite Power to 6.9 kV Busses per AP/07 (Loss of Normal Power)

Enclosure 21 (Black Restart Procedure)

CANDIDATE EXAMINER JPM08 E Page 1 of 12

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Restore Offsite Power to 6.9Kv per AP/O? (Loss of Normal Power) Enclosure 21 (Black Restart Procedure)

Alternate Path:

Yes Facility JPM #:

NewJPM KIA Rating(s):

062 A2.05 (2.9/3.3) Ability to (a) predict the impacts of the following malfunctions or operations on the ac distribution system; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Methods for energizing a dead bus Task Standard:

Power has been restored to three 6.9 KV busses from the yellow buss via B train.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator _....:...X-,--

_....!.X.!....- In-Plant _ __ Perform _....:...X-,--

_-,-X.!-- Simulate _ __

References:

AP/1/A/55001007 (Loss of Normal Power) Enclosure 21 (Slack Start Procedure) rev 056 Validation Time: 18 min. Time Critical: No

=======================================================================

Candidate: Time Start: _ __ __ __

NAME Time Finish: - __ -_ -_

Performance Rating: SAT _ ___

_ _ UNSAT _ __ Performance Time - _- _-_

Examiner: _ _ _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM08 E Page 2 of 12

SIMULATOR SETUP SHEET

1. Reset to any 100% power IC set.
2. Place simulator in RUN.
3. Trip all Unit Tie PCBs.
4. Ensure turbine trips.
5. Perform appropriate actions of E-O and ES-0.1.
6. Perform actions of AP/1/AJ55001007.
7. Perform actions of Enclosure 21 through step 11.
8. Allow simulator to run until the plant is stable.
9. Insert OVR-EP024B (PCB 18 TRIP TRIP PB), Value =ON, DELAY = 1 second, EVENT 1 10.Set EVENT 1 = JBKPCB18
11. Freeze, and write to a snap.

IC SELECTED _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

None.

Tools/Equipment/Procedures Needed:

1. AP/1/AJ5500107 (Loss of Normal Power) Enclosure 21 (Black Start Procedure) rev 056 JPM08 E Page 3 of 12

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Both units experienced a loss of offsite power due to a Loss of Grid and AP/1/AJ55001007 (Loss of Normal Power) is in progress.
  • The TCC has reported that the Yellow Bus is energized and can be used on a limited basis to re-energize plant equipment.
  • AP/1/AJ55001007 Enclosure 21 has been completed through step 12.

INITIATING CUES:

The SRO instructs you to restore power to the Unit 1 6.9 KV Busses per Enclosure 21 (Black Start Procedure) of AP/1 I AJ5500107 (Loss of Normal Power) starting at step 13.

JPM08 E Page 4 of 12

START TIME: _ __

NOTE Zone A or B lockout will occur if at least one main transformer cooling circuit is not restored within 15 minutes of re-energizing the main transformer.

STEP 13: Energize A train as follows:

a. Contact TCC for permission to close PCB 18.

- SAT STANDARD: Calls TCC and requests permission.

INSTRUCTOR CUE: "You have permission to close PCB 18."

- UNSAT EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS:

STEP 13: CRITICAL STEP

b. WHEN permission is granted, THEN close PCB 18.

STANDARD: Depresses the CLOSE pushbutton for PCB 18 and notes - SAT that the PCB 18 closes and then reopens in 1 second.

- UNSAT COMMENTS:

STEP 13 RNO: b. IF PCB 18 cannot be closed, THEN perform the following:

1) Contact TCC for permission to energize Unit 1B - SAT train from the Yellow Bus.

STANDARD: Calls TCC and requests permission.

- UNSAT INSTRUCTOR CUE: "You have permission to energize B Train from the Yellow Bus."

EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS JPM08 E Page 5 of 12

STEP 13 RNO: b.2) WHEN permission granted, THEN perform the following:

a) Ensure MOD 1B - CLOSED. SAT STANDARD: Determines MOD 1B is closed on MC-12 UNSAT COMMENTS STEP 13 RNO: b.2) WHEN permission granted, THEN perform the following:

b) Ensure PCB 14 - OPEN. SAT STANDARD: Ensures PCB 14 is OPEN UNSAT COMMENTS STEP 13 RNO: b.2) WHEN permission granted, THEN perform the CRITICAL following: STEP c) Close PCB 15.

SAT STANDARD: Closes PCB 15 from MC-12 UNSAT COMMENTS STEP 13: c. Do not continue until one of the following PCBs is closed: CRITICAL

  • PCB 18 STEP OR
  • PCB 15. SAT STANDARD: Determines PCB 15 is closed.

COMMENTS UNSAT NOTE:

  • Desired loading rate is 1-2 MW increments.
  • Total load per unit may be initially limited to approximately 11 MWs.

JPM08 E Page 6 of 12

STEP 14: IF "TRANSF 1A" energized, THEN perform the following:

STANDARD: Due to previous steps and plant condition should determine SAT Transformer 1A is NOT energized and continue to next step.

COMMENTS UNSAT STEP 15: IF "TRANSF 1B" energized, THEN perform the following: CRITICAL

a. Energize 1TD as follows: STEP
1) Place "7KV BUS 1TD MODE SEL" switch in "MAN B&TIE". SAT STANDARD: Place lTD switch to Man B and tie.

UNSAT COMMENTS STEP 15a: 2) Close "7KV 1TD FDR FRM 1T1B". CRITICAL STEP STANDARD: Closes "7KV 1TD FDR FRM 1T1 B" SAT COMMENTS UNSAT STEP 15a: 3) Verify "7KV BUS 1TD TIE BKR" - CLOSED.

STANDARD: Verifies tie breaker closed on MC-12 SAT COMMENTS UNSAT JPM08 E Page 7 of 12

STEP 15: b. Energize 1TC as follows:

1) Verify with TCC that additional load can be accepted prior to energizing 6.9 KV bus. SAT STANDARD: Calls TCe and requests permission.

INSTRUCTOR CUE: "Additional load can be accepted at this time." UNSAT EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS STEP 15b: 2) Place "7KV BUS 1TC MODE SEL" switch in "MAN B & TIE". CRITICAL STEP STANDARD: Places 1TC is in Man B and Tie position.

SAT COMMENTS UNSAT STEP 15b: 3) Close "7KV 1TC FDR FRM 1T2B". CRITICAL STEP STANDARD: Closes "7KV 1TC FDR FRM 1T2B" SAT COMMENTS UNSAT STEP 15b: 4) Verify "7KV BUS 1TC TIE BKR" - CLOSED.

STANDARD: Determines breaker is closed. SAT COMMENTS UNSAT JPM08 E Page 8 of 12

STEP 15: c. Verify 1AD-11 F/2 "TRANSFORMER 1B FORCED COOLING REDUCTION" - DARK.

SAT STANDARD: Determines the annunciator dark UNSAT COMMENTS STEP 15: d. Energize 1TB as follows:

1) Verify with TCC that additional load can be accepted prior to energizing 6.9 KV bus SAT STANDARD: Calls TCC and requests permission.

INSTRUCTOR CUE: "Additional load can be accepted at this time."

UNSAT EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS STEP 15d: 2) Place "7KV BUS 1TB MODE SEL" switch in "MAN B & TIE". CRITICAL STEP STANDARD: Places 1TB in Man B and Tie SAT COMMENTS UNSAT STEP 15d: 3) Close "7KV 1TB FDR FRM 1T1B". CRITICAL STEP STANDARD: Closes "7KV 1TB FDR FRM 1T1 B" SAT COMMENTS UNSAT JPM08 E Page 9 of 12

STEP 15d: 4) Verify "7KV BUS 1TB TIE BKR" - CLOSED.

STANDARD: Determines breaker is closed. SAT COMMENTS UNSAT STEP 15: e. Energize 1TA as follows:

1) Verify with TCC that additional load can be accepted prior to energizing 6.9 KV bus. SAT STANDARD: Calls TCC and requests permission.

INSTRUCTOR CUE: "No additional loading should be attempted at UNSAT this time."

EXAMINER NOTE: If the red phone is used, it will contact the SOC and the cue provided by the booth will be "This is the SOC; you need to contact the TCC at extension 3307."

COMMENTS STEP 15e RNO: 1) Do not energize 1TA until additional load can be CRITICAL accepted. STEP STANDARD: Does NOT energize 1T A. SAT COMMENTS UNSAT STEP 15: f. Verify all 6.9 KV busses - ENERGIZED.

STANDARD: Determines "A" 6.9 KV is NOT energized and goes to RNO SAT COMMENTS UNSAT JPM08 E Page 10 of 12

STEP 15f RNO: Perform the following:

1) IF waiting on TCC approval to energize additional 6.9 KV busses, THEN RETURN TO Step 15 and energize busses as TCC allows. - SAT STANDARD: Returns to Step 15.

EXAMINER CUE: Another Operator will complete the procedure. - UNSAT COMMENTS This JPM is complete.

TIME STOP: _ __

JPM08 E Page 11 of 12

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Both units experienced a loss of offsite power due to a Loss of Grid and AP/11A155001007 (Loss of Normal Power) is in progress.
  • The TCC has reported that the Yellow Bus is energized and can by used on a limited basis to re-energize plant equipment.
  • AP/11A155001007 Enclosure 21 has been completed through step 12.

INITIATING CUES:

The SRO instructs you to restore power to the Unit 1 6.9 KV Busses per Enclosure 21 (Black Start Procedure) of AP/1 I Al5500107 (Loss of Normal Power) starting at step 13.

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 F Perform steps of AP/1/A/5500/016, (Malfunction of Nuclear Instrumentation System), Case 4, (P/R Malfunction) to remove a P/R from service.

CANDIDATE EXAMINER JPM08 F Page 1 of 9

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Perform steps of AP/1/A/55001016, (Malfunction of Nuclear Instrumentation System), Case 4, (P/R Malfunction) to remove a P/R from service. .

Alternate Path:

YES Facility JPM #:

OP-CN-IC-ENB-004 KIA Rating(s):

SYS015 A4.03 Nuclear Instrumentation System (NIS) Ability to manually operate and/or monitor in the control room: (CFR: 41.7/45.5 to 45.8) Trip bypasses. (3.8/3.9)

Task Standard:

PR 41 is removed from service per AP/1 IA/55001016 (Malfunction of Nuclear Instrumentation).

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator X In-Plant _ __ Perform _....:...X-,-- Simulate _ __

References:

AP/1/A/55001016 (Malfunction of Nuclear Instrumentation System)Case 4, P/R Malfunction rev 020 Validation Time: 10 min. Time Critical: No

=======================================================================

Candidate: Time Start: _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Question Grade - - - Performance Time _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM08 F Page 2 of 9

SIMULATOR SETUP SHEET

1. Select any 75% power IC set.
2. Go to RUN and acknowledge all alarms.
3. Place Control Rods in MANUAL
4. Insert MAL-ENB011A (P/R Detector 41A Failure), select 100 (hi side failure).
5. Freeze simulator and write to a snap.

SELECTED IC _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

None Tools/Equipment/Procedures Needed:

AP/1/A/55001016 (Malfunction of Nuclear Instrumentation System) Case 4, P/R Malfunction rev 020 JPM08 F Page 3 of 9

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is operating at 75% power.
  • N-41 has failed and the CRS and OATC have completed steps 1 thru 5 of AP/1/A/55001016 (Malfunction of Nuclear Instrumentation System) Case 4 (Power Range Malfunction).

INITIATING CUES:

The CRS has asked you to perform steps 6 through 9 of AP/1/A/5500/16 (Malfunction of Nuclear Instrumentation System) Case 4 (Power Range Malfunction) to remove N-41 from service.

JPM08 F Page 4 of 9

START TIME: _ __

STEP 6: Perform the following actions at the Miscellaneous Control And Critical Step Indication Panel:

a. Place the appropriate "ROD STOP BYPASS" switch to the affected - SAT channel position.

STANDARD: Places "ROD STOP BYPASS" switch to "BYPASS PR N41"

- UNSAT COMMENTS:

STEP 6: Perform the following actions at the Miscellaneous Control And Indication Panel: - SAT

b. Verify the affected nuclear overpower rod stop channel bypassed status light (1SI-19) - LIT.

STANDARD: Verifies status light is LIT for N41. - UNSAT COMMENTS:

Critical Step STEP 6: Perform the following actions at the Miscellaneous Control And Indication Panel:

c. Place "POWER MISMATCH BYPASS" switch to the affected - SAT channel position.

STANDARD: Places "POWER MISMATCH BYPASS" switch to "BYPASS PR N41"

- UNSAT COMMENTS:

JPM08 F Page 5 of 9

Critical Step STEP 7: Perform the following actions at the Detector Current Comparator panel:

a. Place "UPPER SECTION" channel defeat switch to the affected - SAT channel.

STANDARD: Places "UPPER SECTION" switch to "PR N41"

- UNSAT COMMENTS:

STEP 7: Perform the following actions at the Detector Current Comparator panel: - SAT

b. Verify the "CHANNEL DEFEAT" light for the upper section - LIT.

STANDARD: Verifies "CHANNEL DEFEAT" is LIT for N41

- UNSAT COMMENTS:

STEP 7: Perform the following actions at the Detector Current Comparator Critical Step panel:

c. Place "LOWER SECTION" channel defeat switch to the affected - SAT channel.

STANDARD: Places "LOWER SECTION" switch to "PR N41"

- UNSAT COMMENTS:

STEP 7: Perform the following actions at the Detector Current Comparator panel: - SAT

d. Verify the "CHANNEL DEFEAT" light for the lower section - LIT.

STANDARD: Verifies "CHANNEL DEFEAT" is LIT for N41

- UNSAT COMMENTS:

JPM08 F Page 6 of 9

STEP 8: At the Comparator And Rate panel, place the "COMPARATOR Critical Step CHANNEL DEFEAT" switch to the affected channel position

- SAT STANDARD: Places "COMPARATOR CHANNEL DEFEAT" switch to "N41" COMMENTS:

- UNSAT Critical Step STEP 9: De-energize the affected channel as follows:

a. Remove the control power fuses at Power Range A drawer. - SAT STANDARD: Control power fuses removed for N41.

- UNSAT COMMENTS:

STEP 9: De-energize the affected channel as follows:

- SAT NOTE Replacement of the affected P/R control power fuses shall not occur without authorization of the Superintendent of Operations or his designee.

- UNSAT

b. Request the OSM to maintain the control power fuses under his control.

STANDARD: Notes requirement and states that fuses will be delivered to OSM.

COMMENTS:

JPM08 F Page 7 of 9

STEP 9: De-energize the affected channel as follows:

- SAT

c. Verify the affected Power Range cabinet shows no physical signs of damage.

STANDARD: Students verifies through visual inspections there is no sign of physical - UNSAT damage to the power range cabinet.

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM08 F Page 8 of 9

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 is operating at 75% power.
  • N-41 has failed and the CRS and OATC have completed steps 1 thru 5 of AP/11A15500/016 (Malfunction of Nuclear Instrumentation System) Case 4 (Power Range Malfunction).

INITIATING CUES:

The CRS has asked you to perform steps 6 through 9 of AP/1 IAl5500/16 (Malfunction of Nuclear Instrumentation System) Case 4 (Power Range Malfunction) to remove N-41 from service.

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 G Shift Operating RC Pumps CANDIDATE EXAMINER JPM08 G Page 1 of 11

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Shift Operating RC Pumps.

Alternate Path:

YES Facility JPM #:

NEW KIA Rating(s):

SYS075 K4.01 Knowledge of circulating water system design feature(s) and interlocks which provide for the following: Heat Sink (CFR 41.7) 2.5/2.8 Task Standard:

1A and 1D RC pumps are in service and 1Sand 1C RC pumps are secured.

Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator _-'-X~ In-Plant _ __ Perform _....:..X-,-- Simulate _ __

References:

OP/1 IS/64001001 A (Condenser Circulating Water) Enclosure 4.7 rev 062 Validation Time: 10 min. Time Critical: No

=======================================================================

Candidate: Time Start: _ _ __

NAME Time Finish: _ _ __

Performance Rating: SAT ___ UNSAT _ __ Question Grade _ __ Performance Time _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM08 G Page 2 of 11

SIMULATOR SETUP SHEET

1. Reset to any 50% power snap.
2. Ensure 1A and 1B RC pumps in service.
3. Insert XMT-RC063 (TRC_6960 RC PUMP B LOWER GUIDE BRG TEMP (OAC) VALUE = 195, RAMP 600
4. Insert LOA-RC066 (RACKOUT RC PMP 1B), VALUE= RACKOUT, EVENT=1, DELAY = 180 s
5. Insert VLV-RC011 F (RC23 CCW PUMP 1C DISCHARGE VLV FAIL TO POSITION)

VALUE = 0, EVENT = 1, DELAY = 15 s

6. Insert EVENT 1 - x13i159n (This is the ON pushbutton for 1C RC pump being depressed.)
7. SNAP to an open IC set.

SIMULATOR OPERATOR INSTRUCTIONS:

None.

Tools/Equipment/Procedures Needed:

1. OP/1 IB/64001001 A (Condenser Circulating Water), Enclosure 4.7 JPM08 G Page 3 of 11

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is operating at 50% power: following repair of a condenser tube leak.
  • The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.
  • The NLO has checked out 1C and 10 RC Pump and they are not rotating in the reverse direction.

INITIATING CUES:

The Control Room Supervisor instructs you to start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1 IB/64001001 A (Condenser Circulating Water).

JPM08 G Page 4 of 11

START TIME: _ __

STEP 1.1:

SAT Review the Limits and Precautions.

STANDARD: Examinee reviews limits and precautions.

UNSAT COMMENTS:

STEP 1.2:

SAT Verify two or more RC pumps are running per Enclosure 4.1 (Startup of the Condenser Circulating Water System).

STANDARD: Examinee notes that 2 pumps are currently in service. UNSAT COMMENTS:

Critical Step STEP 2.1:

2.1.1 Verify the RC pump to be started is NOT rotating in the reverse direction. SAT STANDARD: Per initiating cue it is NOT rotating in reverse.

COMMENTS: UNSAT JPM08 G Page 5 of 11

STEP 2.1:

SAT 2.1.2 Ensure "RCP DISCH VALVE MODE SEL" in the "NORM" position.

STANDARD: Check switch in NORM position.

UNSAT COMMENTS:

STEP 2.1 SAT NOTE:

1. If it is desired to swap which RC pumps are in service while reducing the number of RC pumps and cooling towers in service, this enclosure should be used first. UNSAT
2. All 3 cooling towers must be in service to meet interlock to start a third RC pump.

2.1.3 IF it is desired to change the number of RC pumps or cooling towers in service, dispatch an operator to the cooling tower area to monitor for cooling tower overflow periodically for the next hour.

STANDARD: Examinee notes 2.1.3 and associated notes are met or do not apply.

COMMENTS:

STEP 2.1:

SAT 2.1.4 IF starting a third RC pump, verify all three cooling tower inlet isolation valves are open:

o 1RC-25 (Cool Twr 1A Inlet Isol) p1 RC-26 (Cool Twr 1B Inlet Isol) UNSAT p1 RC-27 (Cool Twr 1C Inlet Isol)

STANDARD: Examinee notes that all valves are open.

COMMENTS:

JPM08 G Page 6 of 11

STEP 2.1.

NOTE; Wait approximately two minutes after starting an RC pump before stopping SAT the desired RC pump to allow flow to stabilize.

Following each configuration change, sufficient time should be allowed for RC Cooling Tower Levels to stabilize prior to aligning additional components UNSAT 2.1.5 Start the desired RC pump STANDARD: Examinee acknowledges notes and starts 1C RC Pump.

COMMENTS:

Critical Step STEP 2.1:

2.1.6 Ensure that its discharge valve fully opens. (Valve begins to open six seconds SAT after pump start.)

STANDARD: Examinee should determine that 1RC-23 has re-closed and that 1C RC Pump has tripped. UNSAT EXAMINER NOTE: Examinee should realize that it is critical that 1B pump be shut down and that 1D RC pump is available.

EXAMINER CUE: If notified that 1C RC pump discharge valve did NOT open provide the following cue: "Start 10 RC Pump and secure 18 RC Pump".

COMMENTS:

JPM08 G Page 7 of 11

Critical Step STEP 2.1.

NOTE; Wait approximately two minutes after starting an RC pump before stopping the desired RC pump to allow flow to stabilize. SAT Following each configuration change, sufficient time should be allowed for RC Cooling Tower Levels to stabilize prior to aligning additional components 2.1.5 Start the desired RC pump UNSAT STANDARD: Examinee acknowledges notes and starts 1D RC Pump.

COMMENTS:

STEP 2.1:

SAT 2.1.6 Ensure that its discharge valve fully opens. (Valve begins to open six seconds after pump start.)

STANDARD: Examinee notes that 1RC-24 reaches fully open. UNSAT COMMENTS:

Critical Step STEP 2.2:

2.2 Stop the desired RC pump as follows: SAT 2.2.1 Dispatch an operator to the cooling tower area to monitor for cooling tower overflow periodically for the next hour.

UNSAT STANDARD: Dispatched operator as stated.

EXAMINER CUE: This is Rob, I will monitor Unit 1 Cooling Tower levels.

COMMENTS:

JPM08 G Page 8 of 11

Critical Step STEP 2.2:

2.2.2 Close the discharge valve of the pump to be stopped: - SAT o 1RC-21 (RC Pump 1A Disch Isol) o 1RC-22 (RC Pump 1B Disch Isol) o 1RC-23 (RC Pump 1C Disch Isol) o 1RC-24 (RC Pump 1D Disch Isol) - UNSAT STANDARD: Depresses the CLOSE button for 1RC-22 and noted the Green CLOSED light illuminates.

EXAMINER NOTE: This takes about 1 minute.

COMMENTS:

STEP 2.2:

- SAT 2.2.3 Ensure that the pump stops when the valve closes.

STANDARD: Notes the 1 B RC Pump OFF light is illuminates.

- UNSAT COMMENTS:

JPM08 G Page 9 of 11

STEP 2.3:

Ensure the cooling towers are aligned properly for the number of pumps remaining in operation per the cooling tower configuration limits: SAT Riser Bypasses Open Tower Inlets RC Pumps Passing Flow Isolated Running 2 1 1 (Throttled) UNSAT 2 1 2 (Throttled) 0 2 1 (Throttled) 0 1 2 0 0 3 STANDARD: Notes configuration is proper.

COMMENTS:

This JPM is complete.

TIME STOP: - - - -

JPM08 G Page 10 of 11

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 is operating at 50% power following repair of a condenser tube leak.
  • The turbine building rounds NLO reports severe vibration and noise coming from 1B RC pump and states that the motor is extremely hot to the touch.

INITIATING CUES:

The Control Room Supervisor instructs you to start 1C RC Pump and secure 1B RC Pump per Enclosure 4.7 of OP/1/B/6400/o01A (Condenser Circulating Water).

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 H Perform the Immediate Actions of AP/1/A/5500/004 (Loss of Reactor Coolant Pump) for Loss of One NC Pump CANDIDATE EXAMINER JPM08 H Page 1 of 10

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Perform Immediate Actions of AP/1/N55001004 (Loss of Reactor Coolant Pump)

Alternate Path:

Yes Facility JPM #:

OP-CN-PS-NCP-083 (Modified)

KIA Rating(s):

SYS012 A2.06 Ability to (a) predict the impacts of the following malfunctions or operations on the RPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: (CFR: 41.5 I 43.5 I 45.3 I 45.5) Failure of RPS signal to trip the reactor Task Standard:

Recognize the loss of flow condition and failed reactor trip then performs the immediate actions from memory including manual trip of reactor and turbine and closure of open MSIV Preferred Evaluation Simulator: Preferred Evaluation Perform Simulator _....:..X~ In-Plant _ __ Perform _....:..X~ Simulate _ __

References:

AP/1/N55001004 (Loss of Reactor Coolant Pump) rev 014 EP/1/N5000/E-0 (Reactor Trip or Safety Injection) rev 031 Validation Time: 10 min. Time Critical: No

=======================================================================

Candidate: Time Start: _ __

NAME Time Finish: _ __

Performance Rating: SAT ___ UNSAT _ __ Question Grade _ __ Performance Time _ __

Examiner: _ _ _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

=======================================================================

COMMENTS JPM08 H Page 2 of 10

SIMULATOR SETUP SHEET

1. Select any 100% power IC set.
2. Insert MAL-IPX001A, (Automatic Rx Trip TRN A Failure)
3. Insert MAL-IPX001 B, (Automatic Rx Trip TRN B Failure)
4. Insert MAL-ISE002B, (Auto S/I Train B Fails to Actuate)
5. Insert MAL-EHC002, (Turbine Trip Failure, Malfunction), Value = Both
6. Insert MAL-EHC010E, (All Main Turb Stop Valve Failure), Value = AS IS
7. Insert MAL-EHC011 E, (All Main Turbine Control Valve Failure), Value = AS IS
8. Insert VLV SM002A (SM3 MSIV FAIL AUTO ACTIONS))
9. Insert MAL-NCP001 C, (NC Pump 1C Trip), Delay=10, Trigger = 1
10. Go to RUN and acknowledge all alarms.
11. Allow plant parameters to stabilize.
12. FREEZE the simulator and write to a snap.

IC SELECTED _ _ _ _ _ _ __

SIMULATOR OPERATOR INSTRUCTIONS:

Place simulator in RUN while examiner is reading the initial conditions to the examinee.

When examinee is ready, insert Trigger 1.

Tools/Equipment/Procedures Needed:

None JPM08 H Page 3 of 10

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 is operating at 100% power.
  • The BOP is performing a Control Room Ventilation DIP check.

INITIATING CUES:

You are the OATC and are monitoring the control boards.

JPM08 H Page 4 of 10

START TIME: _ __

EXAMINER NOTE: This JPM must be completed without reference to either procedure. A terminal cue will end the JPM.

The examinee must recognize the loss of 1C Reactor Coolant Pump by any or all of the following:

  • NC pump ammeter (1 MC-1 0) at zero amps
  • NC pump breaker indication (1MC-10) open
  • 1AD-6, F/5 "UV NCP BUS ALERT" - LIT THE FOLLOWING STEPS ARE FROM AP/1/A15500/004 STEP 1: Verify all control banks- INSERTED.

- SAT STANDARD: Determines the control banks are NOT inserted.

COMMENTS:

- UNSAT STEP 1 RNO: Perform the following: CRITICAL

a. Ensure reactor - TRIPPED. STEP STANDARD: Rotates "RX TRIP BKR" switches on 1MC-1 to trip the reactor. SAT COMMENTS:

- UNSAT JPM08 H Page 5 of 10

STEP 1 RNO: Perform the following:

b. GO TO EP/1/A/5000/E-0 (Reactor Trip Or Safety - SAT Injection).

STANDARD: Proceeds to perform the immediate actions of EP/1/A/5000/E-0 (Reactor Trip Or Safety Injection). - UNSAT COMMENTS:

THE FOLLOWING STEPS ARE FROM EP/1/A1S000/E-O STEP 2: Verify Reactor Trip:

  • All rod bottom lights - LIT - SAT
  • I/R amps - DECREASING.

STANDARD: Determines the following: - UNSAT

  • All rod bottom lights lit.
  • Both reactor trip breaker green OPEN lights lit and both bypass breakers no lights lit.
  • Intermediate range amps decreasing COMMENTS:

STEP 3: Verify Turbine Trip:

  • All turbine stop valves - CLOSED - SAT STANDARD: TURB STOP VALVE 1, (2), (3), (4) CLOSED CHANNEL I, (II), (III),

(IV) status lights (1 SI-2) dark

- UNSAT COMMENTS:

JPM08 H Page 6 of 10

STEP 3 RNO: a. Manually trip turbine.

SAT STANDARD: "TURBINE TRIP" pushbutton depressed from the control room.

Verifies "TURB STOP VALVE 1 (2) (3) (4) CLOSED Channell, (II),

(III), (IV)" status lights (1 SI-2) dark. Examinee determines that turbine did NOT trip. UNSAT COMMENTS:

STEP 3 RNO: b. IF turbine will not trip, THEN:

1) Depress the "MANUAL" pushbutton on the turbine control panel. SAT STANDARD: "MANUAL" depressed on turbine control panel.

COMMENTS: UNSAT STEP 3 RNO: 2) Rapidly unload turbine by simultaneously depressing the "CONTROL VALVE LOWER" and "FAST RATE" SAT push buttons.

STANDARD: "CONTROL VALVE LOWER" and "FAST RATE" depressed and verifies generator megawatts or control valve position NOT decreasing and UNSAT turbine NOT running back.

COMMENTS:

JPM08 H Page 7 of 10

STEP 3 RNO: 3) IF turbine will not runback, THEN close: CRITICAL

  • All MSIV bypass valves.

SAT STANDARD: Depresses green "CLOSE" pushbutton on the open 1C MSIV and verifies green "CLSD" light lit and red "OPEN" light dark. Verifies all other MSIV are closed.

UNSAT Examinee verifies green indicator light lit on all MSIV bypass valves.

EXAMINER NOTE: Depending on operator speed, a MSI may NOT have occurred yet. In that case all MSIVs will be manually closed.

COMMENTS:

STEP 4: Verify 1ETA and 1ETB - ENERGIZED.

SAT STANDARD: Verifies ETAIB powered equipment energized OR verifies voltage present on distribution system.

COMMENTS:

UNSAT STEP 5: Verify SII is actuated:

a. "Safety Injection Actuated" status light (1 SI-13) lit.

SAT STANDARD: "SAFETY INJECTION ACTUATED" status light (1SI-13) is lit.

COMMENTS:

UNSAT JPM08 H Page 8 of 10

CRITICAL STEP 5: b. E/S load sequencer actuated status lights (1 SI-14) lit. STEP STANDARD: Verifies "E/S LOAD SEQ ACTUATED TRAIN A" status light lit (1SI-14).

- SAT Notes that E/S LOAD SEQ ACTUATED TRAIN B status light is NOT lit and manually initiates B train of Safety Injection.

- UNSAT EXAMINER CUE: Control Room Supervisor has pulled EP/1/A/5000/E-0 and is ready to proceed.

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM08 H Page 9 of 10

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 is operating at 100% power.
  • The BOP is performing a Control Room Ventilation DIP check.

INITIATING CUES:

You are the OATC and are monitoring the control boards.

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM081 Locally Break Vacuum on a Loss of Feedwater CANDIDATE EXAMINER JPM08 I Page 1 of 9

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Locally break vacuum during a loss of feedwater.

Alternate Path: NO Facility JPM #: CNS2005NRC KJA Rating(s): SAFETY FUNCTION (4(SEC)

APE054 AK3.04 (4.4/4.6) Loss of Main Feedwater (MFW)

Knowledge of the reasons for the following responses as they apply to the Loss of Main Feedwater (MFW): (CFR 41.5,41.10/45.6 145.13) Actions contained in EOPs for loss of MFW.

Task Standard:

Using AP/06 Enclosure 3; vacuum breaker valves are opened and steam is isolated to the air ejectors.

Using operating procedure enclosure 4.3, isolates condenser 1A from CSAE 1A.

Preferred Evaluation Location: Preferred Evaluation Method:

Control Room _ _ In-Plant X Perform _ _ Simulate ---"X...!......_

Procedure

References:

AP/1/A/55001006 Enclosure 3 Revision 036 OP/1/S/63001006 Enclosure 4.3 revision 058 Validation Time: 20 minutes Time Critical: NO Candidate: Time Start: _ __

NAME Time Finish: _ __

Performance Ratings:

SAT _ __ UNSAT _ __ Question Grade _ _ _ Performance Time _ __

Examiner:

- - - -NAME------ - - - - - -_ _ _ _ _ _1--_ _-

SIGNATURE DATE COMMENTS JPM08 I Page 2 of 9

SIMULATOR SET- UP SHEET N/A SIMULATOR OPERATOR INSTRUCTIONS N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED

1. AP/1/A/55001006 (Loss of S/G Feedwater) Enclosure 3 (Local Actions to Break Condenser Vacuum) rev 036
2. OP/1/B/63001006 (Main Vacuum) Enclosure 4.3 (Breaking Main Condenser Vacuum) rev 058 JPM08 I Page 3 of 9

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • AP/1/A/5500/o06, Loss of S/G Feedwater Case II, Loss of Normal CA is in effect.
  • 1A and 1 B CSAEs are currently in service.
  • 1C CSAE is tagged due to a condensate leak on the end bell.

INITIATING CUE:

The Control Room Supervisor has directed you to complete Enclosure 3 of AP/1/A/5500/o06 to break main condenser vacuum including shutdown of the air ejectors per Enclosure 4.3 of OP/1/B/6300/o06 (Main Vacuum).

JPM081 Page 4 of 9

START TIME:

Procedure Caution: High air flow rates will exist when vacuum breakers are first opened. Stay clear of pipe end.

Step 1. Break condenser vacuum by opening the following valves: Critical Step 1CM-368 (1A Main Cond Shell Vacuum Bkr) (TB-600,1 F-26) (Ladder needed) - SAT 1CM-369 (1 B Main Cond Shell Vacuum Bkr) (TB-603, 1F-24) (Ladder needed) 1CM-370 (1 C Main Cond Shell Vacuum Bkr) (TB-605, 1F-22) (Ladder needed). - UNSAT STANDARD: for each valve, operator locates a ladder of sufficient size to reach the hand wheel. Then engages clutch and opens the valve by rotating the handwheel counter clockwise.

EXAMINER CUE: (When located) Ladder has been obtained.

EXAMINER CUE: (for each valve) Clutch is engaged and handwheel has been rotated in the counter clockwise direction then stopped.

COMMENTS:

Step 2. Secure steam to CSAEs as follows: Critical Step

a. Close the following valves:

- SAT

  • 1SA-27 (Au x Steam to CSAE) (TB-594, 1M-27). - UNSAT STANDARD: Valves are located high and are operated by chains. The chain wheels are rotated in the clockwise direction until the handwheel stops.

EXAMINER CUE: (for each valve) Valve handwheel is rotated in the clockwise direction and has stopped.

COMMENTS:

Step 2b. WHEN time and manpower permit, THEN complete the shutdown of the CSAEs. REFER TO OP/1/B/63001006 (Main Vacuum). - SAT STANDARD: Per the examiner cue, operator should perform enclosure 4.3 to - UNSAT shutdown the air ejectors.

COMMENTS:

JPM08 I Page 5 of 9

Procedure: OP/1/B/6300/006 Enclosure 4.3

1. Initial Conditions:

Review Limits and Precautions - SAT STANDARD: Reviews the limits and precautions. - UNSAT COMMENTS:

Initial conditions continued;

  • Verify vacuum has been broken on 1A and 1B CFPT Condensers per OP/1/A/62501001 M (Isolation of Condensate and Feedwater System - UNSAT Components ).

EXAMINER CUE: Initial conditions 1.2 and 1.3 are complete.

COMMENTS:

Step 2.1 To shutdown CSAE 1A, perform the following: Critical Step Step 2.1.1 Ensure the following valves are closed to secure vacuum to Main Condenser 1A: - SAT

  • 1ZJ-7 (1A CSAE No 1 Air Inlet) (TB-594, 1L-21) - UNSAT

STANDARD: Locates and closes 1ZJ-7 and 1ZJ-8 by rotating chain wheels in the clockwise direction until the handwheel stops.

EXAMINER CUE: 1ZJ-7 and 1ZJ-8 handwheels are rotated in the clockwise direction until the handwheel stops.

COMMENTS:

JPM08 I Page 6 of 9

Step 2.1.2 Ensure the following valves are closed to secure vacuum to the CFPT condensers: - SAT

  • 1ZJ-19 (1A & 1B CFPT Condenser Air Offtake To 1A CSAE No 1) - UNSAT (TB-594, 1L-21)
  • 1ZJ-20 (1 A & 1B CFPT Condenser Air Offtake To 1A CSAE No 2)

(TB-594, 1L-21)

STANDARD: Locates and closes 1ZJ-19 and 1ZJ-20 by rotating chain wheels in the clockwise direction until the handwheel stops.

EXAMINER CUE: 1ZJ-19 and 1ZJ-20 handwheels are rotated in the clockwise direction until the handwheel stops.

COMMENTS:

Step 2.1.3 Ensure the following valves are closed to secure the 1st stage jets:

- SAT

  • 1SA-72 (1A CSAE 1st Stage No 2 Inlet) (TB-594, 1K-21) - UNSAT STANDARD: Locates and closes 1ZJ-69 and 1ZJ-72 by rotating handwheels in the clockwise direction until the handwheel stops.

EXAMINER CUE: 1ZJ-69 and 1ZJ-72 handwheels are rotated in the clockwise direction until the handwheel stops.

COMMENTS:

Step 2.1.4 Close 1SA-114 (1A CSAE Inter Condenser Drain To Condenser)

(TB-594, 1L-21). - SAT STANDARD: Locates and closes 1SA-114 by rotating the handwheel in the - UNSAT clockwise direction until the handwheel stops.

EXAMINER CUE: 1SA-114 handwheel is rotated in the clockwise direction until the handwheel stops.

COMMENTS:

JPM08 I Page 7 of 9

Step 2.1.5 Ensure the following valves are closed to secure the 2nd stage jets:

- SAT

  • 1SA-131 (1A CSAE 2nd Stage No 1 Inlet Isol From Inner Condenser) (TB-594, 1K-21) - UNSAT
  • 1SA-130 (1A CSAE 2nd Stage No 2 Inlet Isol From Inner Condenser) (TB-594, 1K-21)

STANDARD: Locates and closes 1SA-131 and 1SA-130 by rotating handwheels in the clockwise direction until the handwheel stops.

EXAMINER CUE: 1SA-131 and 1SA-130 handwheels are rotated in the clockwise direction until the handwheel stops.

COMMENTS:

Step 2.1.6 Ensure the following 2nd stage steam inlet valves are closed:

- SAT

  • 1SA-63 (1A CSAE 2nd Stage No 2 Inlet) (TB-594, 1K-21) - UNSAT STANDARD: Locates and closes 1SA-66 and 1SA-63 by rotating handwheels in the clockwise direction until the handwheel stops.

EXAMINER CUE: 1SA-66 and 1SA-63 handwheels are rotated in the clockwise direction until the handwheel stops.

COMMENTS:

EXAMINER NOTE: When the operator completes step 2.1.6, provide the following cue:

EXAMINER CUE: Another operator will complete enclosure 4.3 to shutdown the CSAEs.

Enclosure 3 Step 3 WHEN requested by Control Room Supervisor, THEN verify condenser - SAT vacuum broken as follows:

- UNSAT STANDARD: Notes the need to check vacuum breakers when requested by the CRS.

EXAMINER CUE: The control room supervisor will have another operator verify this later.

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM08 I Page 8 of 9

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • AP/11A155001006, Loss of S/G Feedwater Case II, Loss of Normal CA is in effect.
  • 1A and 1B CSAEs are currently in service.
  • 1C CSAE is tagged due to a condensate leak on the end bell.

INITIATING CUE:

The Control Room Supervisor has directed you to complete Enclosure 3 of AP/11A155001006 to break main condenser vacuum including shutdown of the air ejectors per Enclosure 4.3 of OP/1/B/63001006 (Main Vacuum).

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 J Align Seal Injection to the Unit 2 NC Pumps CANDIDATE EXAMINER JPM08 J Page 1 of 9

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Align Seal Injection to the Unit 2 NC Pumps Alternate Path: NO Facility JPM #: OP-CN-CP-AD-002 KIA Rating(s): APE022 AK3.02 (3.5/.3.9) Loss of Reactor Coolant Makeup Knowledge of the reasons for the following responses as they apply to the Loss of Reactor Coolant Makeup: (CFR 41.5, 41.101 45.6 1 45.13) Actions contained in SOPs and EOPs for RCPs, loss of makeup, loss of charging, and abnormal charging.

Task Standard:

Seal Injection flow from the Standby Makeup pump is established to the Unit 2 NCP's within 10 minutes.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _ __ In-Plant _X_ Perform _X_ Simulate _ __

Procedure

References:

AP/O/A/55001045 (Plant Fire) rev 006 AP/O/A/55001020 (Loss of Nuclear Service Water) Enclosures 5 (Establishing NC Makeup/Seal Injection From the SSF) and Enclosure 7 (Align Seal Injection to the Unit 2 NC Pumps) rev 036 Validation Time: 6 minutes Time Critical: YES Candidate: Time Start: _ __

NAME Time Finish: - - - -

Performance Ratings:

SAT _ __ UNSAT _ __ Question Grade ____ Performance Time _ __

Examiner: _ _ _ _ _ _ _ _ _ __

NAME SIGNATURE DATE

===============================================================

COMMENTS JPM08 J Page 2 of 9

SIMULATOR SET- UP SHEET N/A SIMULATOR OPERATOR INSTRUCTIONS N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED AP/O/A/55001020 (Loss of Nuclear Service Water) Enclosures 5 (Establishing NC Makeup/Seal Injection From the SSF) and Enclosure 7 (Align Seal Injection to the Unit 2 NC Pumps) rev 036 JPM08 J Page 3 of 9

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Both Unit 1 and Unit 2 are operating at 100%
  • The 2A CA Pump has caught fire while running for a periodic test.
  • The fire is ongoing due to the fire suppression equipment in the room failing to actuate.
  • The control room has implemented AP/0/A/5500/045 (Plant Fire).
  • You have been dispatched to the SSF and are standing by for further instructions.

INITIATING CUE:

The Unit Supervisor directs you to align seal injection to the Unit 2 NC Pumps using AP/0/A/5500/020 (Loss of Nuclear Service Water), Enclosure 5. This JPM is time critical.

JPM08 J Page 4 of 9

START TIME:

EXAMINER NOTE: The time limit for this JPM is based on the time to perform the actual task considering each step must be explained to the examiner with verbal feedback as appropriate. The JPM evaluates the operator's ability to perform the task under simulated conditions, NOT real time. Safety considerations are made to preclude operators from running through the plant just to satisfy a JPM time requirement.

Critical Time Start: Record time that examinee enters the SSF Bldg. _ _ __

Note Indications of 1SLXG being de-energized are as follows:

  • Normal lighting in SSF off with emergency lights on
  • "LINE VOLTS" on OCNS0001 indicating zero volts
  • OAD-11 B/6 "LOAD CENTER 1SLXG TROUBLE"- LIT
  • "LOAD CENTER 1SLXG BUS VOLTAGE" on 1SLXG indicating zero volts.

Enclosure 5 Step 1 IE 1SLXG is de-energized, THEN place the SSF diesel in operation as follows:

SAT STANDARD: Examinee uses local indication and determines that SLXG is NOT de-energized, and the SSF diesel will NOT be started. UNSAT EXAMINER CUE: Normal SSF lighting is ON and/or if addressed EXAMINER CUE: Voltmeter (OCNSL0001) reads 600v.

and/or if addressed, EXAMINER CUE: Annunciator OAD-11 B-6, "Load Center 1SLXG Trouble" is dark.

and/or if addressed, EXAMINER CUE: 1SLXG bus volts reads 600 volts.

COMMENTS:

Enclosure 5 Step 2 IF Unit 1 affected, THEN ... SAT STANDARD: Examinee should determine from the initial conditions and cue UNSAT that Unit 1 is NOT affected.

COMMENTS:

JPM08 J Page 5 of 9

Enclosure 5 Step 3 Critical Step IF Unit 2 affected, THEN align seal injection to the Unit 2 NC Pumps. REFER TO Enclosure 7 (Align Seal Injection to the Unit 2 NC Pumps).

STANDARD: Examinee should determine from the initial conditions and cue SAT that Unit 2 is affected and initiate Enclosure 7.

UNSAT COMMENTS:

Step 1 Ensure 2NV-S76 (Stdby MIU To Cont Equip Smp 2A) - closed.

SAT STANDARD: Notes 2NV-S76 is closed UNSAT EXAMINER CUE: Green "closed" light is LIT.

COMMENTS:

Step 2 IF Annunciator OAD-11, D/1 (ESS MCC 2EMXS LOSS OF VOLTAGE)

LIT, THEN: ... SAT UNSAT STANDARD: Based on standard, the student may assume Annunciator is dark. If asked, provide the following cue:

EXAMINER CUE: OAD-11, D/1 is DARK.

COMMENTS:

Step 3 IF "UNIT 2 SSF CONTROLS ENGAGED" DARK THEN:

SAT STANDARD: Student notes light is LIT and continues. UNSAT EXAMINER CUE: "UNIT 2 SSF CONTROLS ENGAGED" light is LIT.

COMMENTS:

JPMOS J Page 6 of 9

Step 4 IF "UNIT 2 SSF CONTROLS ENGAGED" LIT, THEN: Critical Step

a. Ensure the following valves - OPEN:

UNSAT STANDARD: Opens 2NV-865A and 2NV-872A.

EXAMINER CUE: For 2NV-865A - Red OPEN light is LIT.

For 2NV-872A - Red OPEN light is LIT.

COMMENTS:

Step 4 IF "UNIT 2 SSF CONTROLS ENGAGED" LIT, THEN: Critical Step

b. Close 2NV-89A (NC Pmps Seal Ret Cont Isol).

SAT STANDARD: Closes 2NV-89A.

UNSAT EXAMINER CUE: 2NV-89A - Green CLOSED light is LIT.

COMMENTS:

Step 5 Ensure 2NV-877 (Stdby M/U to NC Pmp Seal Inj) - OPEN.

SAT STANDARD: Notes 2NV-877 is open.

UNSAT EXAMINER CUE: 2NV-877 - Red OPEN light is LIT.

COMMENTS:

JPM08 J Page 7 of 9

Step 6 Start "STDBY M/U PUMP #2" by depressing "ON" pushbutton on SSF Critical Step console.

- SAT STANDARD: Starts Standby Makeup pump.

- UNSAT EXAMINER CUE: Red ON light is LIT.

COMMENTS:

Critical Time End: Record End Time Step 7. Notify Control Room Supervisor of status of "STDBY M/U PUMP #2"

- SAT STANDARD: Contacts CRS and reports status. - UNSAT COMMENTS:

Step 8. IF SSF DIG in service THEN ....

- SAT STANDARD: Student notes SSF DIG is off, and step does NOT apply.

- UNSAT COMMENTS:

Step 9. WHEN plant conditions allow, THEN shutdown the "STDBY M/U PUMP

  1. 2. REFER TO OP/O/B/61 001013 (Standby Shutdown Facility Operations). - SAT EXAMINER CUE: Another operator has relieved you and will continue to - UNSAT monitor operations at the SSF.

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM08 J Page 8 of 9

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Both Unit 1 and Unit 2 are operating at 100%
  • The 2A CA Pump has caught fire while running for a periodic test.
  • The fire is ongoing due to the fire suppression equipment in the room failing to actuate.
  • The control room has implemented AP/O/A/55001045 (Plant Fire).
  • You have been dispatched to the SSF and are standing by for further instructions.

INITIATING CUE:

The Unit Supervisor directs you to align seal injection to the Unit 2 NC Pumps using AP/O/A/55001020 (Loss of Nuclear Service Water), Enclosure 5. This JPM is time critical.

CATAWBA 2008 INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE JPM08 K Alternate Cooling to 1A NV Pump CANDIDATE EXAMINER JPM08 K Page 1 of 8

CATAWBA INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Align alternate cooling to 1A NV Pump Alternate Path: NO Facility JPM #: OP-CN-PSS-KC-004 KIA Rating(s): APE026 2.4.35 (3.8/4.0) Loss of Component Cooling Water (CCW)

Knowledge of local auxiliary operator tasks during an emergency and the resultant operational effects. (CFR: 41.10/43.5/45.13)

Task Standard:'

Examinee properly aligns backup YO Cooling to 1A NV Pump within 25 minutes. The critical time starts when the NLO completes reading the initiating cue, and stops when correct YO to NV flow is established.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator _ __ In-Plant _X_ Perform X Simulate - - -

Procedure

References:

AP/1/A/55001021 (Loss of Component Cooling) Enclosure 4 (Alternate Cooling to NV pump 1A) rev 035 Validation Time: 12 minutes Time Critical: YES

==============================================================

Candidate: Time Start: - - -

NAME Time Finish: _ __

Performance Ratings:

SAT _ __ UNSAT _ __ Question Grade ____ Performance Time _ __

Examiner: - - - - - - - - - - - - - - - - - - - -_ _ _ _ _---.:1_ _-

NAME SIGNATURE DATE

===============================================================

COMMENTS JPM08 K Page 2 of 8

SIMULATOR SET- UP SHEET N/A SIMULATOR OPERATOR INSTRUCTIONS N/A TOOLS/EQUIPMENT/PROCEDURES NEEDED

1. AP/1/A/55001021 (Loss of Component Cooling) Enclosure 4 (Alternate Cooling to NV Pump 1A) rev 035 JPM08 K Page 3 of 8

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Unit 1 has lost KC INITIATING CUE:

The Unit Supervisor directs you to align alternate cooling to 1A NV Pump per AP/1/A/55001021 (Loss of Component Cooling), Enclosure 4. This JPM is time critical. Time begins when you acknowledge the task.

JPM08 K Page 4 of 8

START TIME:

NOTE The following sequence involves components on both units, many Critical Step with very similar numbers and nomenclature.

SAT Step 1 Close the following valves:

  • 1KC-E31 (YD BtU to 1A NV Pump Mtr Tell Tale) (AB-545, JJ-56, Rm UNSAT 200) .
  • 2KC-E31 (YD BtU to 2A NV Pump Mtr Inlet Tell Tale) (AB-546, HH-58, Rm 200).

Caution Attempting additional valve movement after reaching the mechanical end stop may damage the valve operator of the following valves.

  • 1KC-E29 (1A NV Pump Motor Inlet Isol) (AB-551, JJ-56, Rm 200).
  • 1KC-A53 (1A NV Pump Motor Cooler Outlet Isol) (AB-551, HH-56, Rm 200).
  • 1KC-A59 (1A NV Pump Oil Coolers Outlet Isol) (AB-550, JJ-KK, 56, Rm 200).

STANDARD: Closes all valves.

COMMENTS:

Step 2 Open the following valves: Critical Step

  • 1YD-431 (YD Supply to 1A NV Pump Motor) (AB-549, JJ-56, Rm 200).

SAT

  • 1KC-E30 (YD BtU to 1A NV Pump Mtr Isol) (AB-549, JJ-56, Rm 200).
  • 1KC-E32 (1A NV Pump Mtr Clr YD Outlet Isol) (AB-546, HH-56, Rm UNSAT 200)
  • 1KC-E33 (1A NV Pump Oil Clrs YD Outlet Isol) (AB-54?, JJ-56, Rm 200).

STANDARD: Opens all valves.

Critical Time End: Record End Time _ _ __

COMMENTS:

JPM08 K Page 5 of 8

Step 3 Throttle YO flow to 1A NV Pump as follows: (Ladder needed)

  • Unlock and throttle 1KC-A52 (1A NV Pump Motor Cooler Outlet SAT Throttle) (AB-551, HH-56, Rm 200) to obtain 30-35 gpm on 1KCPG8280 "1A NV Pump Motor Cooler KC Flow" (AB-548, UNSAT HH,55-56, Rm 200).

STANDARD: Locates flow gauge 1KCPG8280 (Next to 1A NV Pump entrance door),

EXAMINER CUE: Flow is reading 34 gpm.

EXAMINER NOTE: Examinee should realize this value is within range, and no adjustment is necessary at this time.

COMMENTS Step 3 Throttle YO to 1A NV Pump as follows: (Ladder needed) Critical Step

  • Unlock and throttle 1KC-A58 (1A NV Pump Oil Coolers Outlet Throttle) (AB-551, JJ-56, Rm 200) to obtain 32-35 gpm on SAT 1KCPS8330 "1A NV Pump Oil Coolers KC Flow" (AB-543, HH,55-56, Rm 200). UNSAT STANDARD: Locates flow gauge 1KCPS8330 (Next to 1A NV Pump entrance door),

EXAMINER CUE:: Flow is reading 9 gpm.

EXAMINER NOTE: Examinee should realize that this value is below the acceptable range, and an adjustment range, and an adjustment in flow is needed.

EXAMINER NOTE: When examinee describes increasing flow to 32-35 gpm by rotating 1KC-A58 counterclockwise using wrench or valve handle provide the next cue.

EXAMINER CUE Flow reads 35 gpm on 1KCPS8330 COMMENTS JPM08 K Page 6 of 8

Step 4. Notify Control Room Supervisor of the following ...

  • Enter 1A NV pump in TSAIL UNSAT STANDARD: Contacts CRS and reports status.

EXAMINER CUE: "This is Brian Miller. I understand ... " (Repeat back what student reports).

COMMENTS:

Step 5. Notify Radwaste Chemistry (Ext. 5558) of YD flow to ND/NS sump.

SAT STANDARD: Contacts Radwaste.

UNSAT EXAMINER CUE: "This is Greg Lancaster. I understand ... " (Repeat back what student reports).

COMMENTS:

NOTE The following step is to reduce YD drainage to the ND/NS sump and thereby minimize radwaste. SAT UNSAT Step 6. WHEN time and conditions permit, THEN perform the following:

EXAMINER CUE: Another operator will complete the enclosure.

COMMENTS:

This JPM is complete.

TIME STOP: _ __

JPM08 K Page 7 of 8

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 has lost KC INITIATING CUE:

The Unit Supervisor directs you to align alternate cooling to 1A NV Pump per AP/1/A/55001021 (Loss of Component Cooling), Enclosure 4. This JPM is time critical. Time begins when you acknowledge the task.