Mid-cycle Performance Review and Inspection Plan - Oconee Nuclear Station
ML092440284
Person / Time
Site: Oconee, 07200040  
Issue date: 09/01/2009
From: Wert L
Division Reactor Projects II
To: Baxter D
Duke Energy Carolinas
Shared Package
ML092440283 List:
References
Download: ML092440284 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 September 1, 2009 Mr. David A. Baxter Site Vice President Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - OCONEE NUCLEAR STATION

Dear Mr. Baxter:

On August 11, 2009, the NRC staff completed its performance review of the Oconee Nuclear Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include security information.

A separate letter designated and marked as AOfficial Use Only - Security Related Information will include the Security cornerstone performance review and resultant inspection plan.

Plant performance for the most recent quarter at Oconee Units 2 and 3 was within the Licensee Response Column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections.

Plant performance for the most recent quarter at Oconee Unit 1 was within the Regulatory Response Column of the NRCs Action Matrix based on a fourth quarter 2008 Initiating Events Cornerstone finding of low to moderate safety significance (White). On May 7, 2009, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address this White finding. Therefore, we initiated supplemental inspection 95001 on August 31, 2009.

DEC 2

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2010. In addition to the supplemental inspection and ROP baseline inspections, we also plan on conducting several infrequently performed inspections, which include Temporary Instruction (TI) 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds; TI 2515/175, Emergency Response Organization, Drill/Exercise Performance Indicator Program Review; IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants; and operator licensing examinations. Additionally, the staff will continue its review of issues associated with fire, external flooding, tornado, and high energy line break mitigation. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.

Please contact Jonathan Bartley at (404) 562-4607 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Leonard D. Wert, Jr., Director Division of Reactor Projects Docket Nos.: 50-269, 50-270, 50-287, 72-04, 72-40 License Nos.: DPR-38, DPR-47, DPR-55

Enclosure:

Oconee Inspection/Activity Plan cc w/encl: (See page 3)

X SUNSI REVIEW COMPLETE JHB OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE JHB /RA/

EJS /RA/

JDW /RA/

NAME JBartley EStamm LWert DATE 08/26/2009 08/24/2009 09/01/2009 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO

DEC 3

cc w/encl:

Robert Meixell Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Scott L. Batson Engineering Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Clark E. Curry Mechanical and Civil Engineering Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Philip J. Culbertson Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution Preston Gillespie Manager Oconee Nuclear Station Duke Energy Carolinas, LLC Electronic Mail Distribution R. L. Gill, Jr.

Manager Nuclear Regulatory Issues & Industry Affairs Duke Energy Carolinas, LLC Electronic Mail Distribution Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC Electronic Mail Distribution Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 Charles Brinkman Director Washington Operations Westinghouse Electric Company Electronic Mail Distribution County Supervisor of Oconee County 415 S. Pine Street Walhalla, SC 29691-2145 David A. Repka Winston Strawn LLP Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Beverly O. Hall Chief, Radiation Protection Section Department of Environmental Health N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution

DEC 4

Letter to David A. Baxter from Leonard D. Wert, Jr., dated September 1, 2009

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - OCONEE NUCLEAR STATION Distribution w/encl:

C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMOconee Resource ROP Reports Institute of Nuclear Power Operations (INPO)