Appendix D Scenario Outline Form ES-D-1 Facility: Byron Scenario No: #1 Op-Test No: 2008-01 Examiners:

Operators:

Initial Conditions: Rx Power ~ 100%.

Turnover: Drain PRT per BOP RY-4 and then ramp down to 95% Rx Power.

Event No.

Malf.

No.

Event Type*

Event Description 1

NONE N

RO SRO Drain PRT per RY-4, Draining the PRT 2

NONE R

RO SRO Ramp from 100% down to 95%

3 ED11A C

BOP SRO Loss of Instrument Bus 111 4

Cv01a C

RO SRO Trip of 1A CV Pump 5

RX01E0 I

BOP SRO Failure of 1PT-525 low 1B S/G pressure transmitter 6

Rx15 2500 I

RO SRO Failure of Pzr Master Pressure Controller 1PK-455A high 7

MS07A 3 120 M

TEAM 1A Main Steam Line Break inside Cnmt.

8 TC03 M

TEAM Failure of Turbine to Auto Trip 9

MS01A&D 100 M

TEAM MSIVs A & D fail to close 10 SI01B C

BOP Failure of 1B SI Pump to start

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: Byron Scenario No: #2 Op-Test No: 2008-01 Examiners:

Operators:

Initial Conditions: Rx Power ~ 100%.

Turnover: Ramp down to 95% Rx Power.

Event No.

Malf.

No.

Event Type*

Event Description 1

msv1ms004a

=100 C

BOP SRO 1MS004A Fails Open. Rx Power increases > 100%

1a R

RO SRO Ramp from 102% down to 98%

2 Cv16 100 I

RO SRO 1LT-112 Failure High 3

Rx18f 650 I

BOP SRO 1TE-445 Failure High 4

rm061 C

BOP SRO Failure of 0PR031J to actuate VC Emergency Make-Up 5

Eg03 96 C

BOP SRO Failure of Main Generator Voltage Regulator High 6

Th04a 50000 M

TEAM Sesmic event results in Large Break LOCA 7

Cs05 C

TEAM 1B CS Train fails to align, Manual action required 8

Rh01b C

TEAM 1B RH Pp Trips on OC at 49% RWST level 9

Ed053p open C

TEAM 1SI8811A Fails to open on low RWST level

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: Byron Scenario No: #3 Op-Test No: 2008-01 Examiners:

Operators:

Initial Conditions: Rx Power ~ 100%.

Turnover: Continue to operate at 100% Rx Power.

Event No.

Malf.

No.

Event Type*

Event Description 1

NONE C

BOP SRO Shutdown the 1A CW Pp 2

NONE R

RO SRO Ramp down 50 MW to account for secondary inefficiencies resulting from CW Pp shutdown 3

MF CV23B 20 C

RO SRO Failure of 1B Letdown Hx 4

MF FW22C C

BOP SRO 1C CD/CB Pp Trip with Failure of STBY to Auto Start 5

MF CV10 0 60 I

RO SRO Failure of 1CV121 Controller Low 6

MF FW02A C

BOP SRO 1FW012B Fails Open 7

MF RP09B M

TEAM Rx Trip switch on 1PM05J Fails 8

MF TC03 C

TEAM Turbine Trip Fails requires Manual Turbine Trip 9

MF FW43 C

TEAM 1A AF Pp Trips 10 MF FW44 C

TEAM 1A AF Pp trips after 1 minute run

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: Byron Scenario No: #4 Op-Test No:

Examiners:

Operators:

Initial Conditions: Rx Power ~ 4%.

Turnover: Rx is at ~ 4% power steady state, MOL.

Event No.

Malf.

No.

Event Type*

Event Description 1

NONE N

BOP SRO Perform Main Turbine Oil Checks per 1BGP 100-2 2

IMF NI35B I

RO SRO Intermediate Range NI N-35 fails low 3

NONE R

RO SRO Increase or decrease Rx Pwr to > 10% or < P-6 4

IMF SPT01B I

BOP SRO 1D S/G Steam Pressure Transmitter 1PT-544 fails low 5

IMF IPP05 600 I

RO SRO Turbine Impulse Pressure Detector 1PT-505 fails high 6

IOR ZDI1CV CL C

BOP SRO L/D Hx TCV 1CC130A fails closed 7

IMF FW19B 3.5 M

TEAM 1C SG Feed Line Break inside Cnmt.

8 IMF DG08B C

TEAM 1B D/G fails to start 9

IMF THO3C M

TEAM 1C SGTR at 400gpm