ML092150890

From kanterella
Jump to navigation Jump to search
Ltr. 07/31/09 Dresden Request for Information for an NRC Post-Approval Site Inspection for License Renewal
ML092150890
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/31/2009
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
IR-09-007
Download: ML092150890 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 31, 2009 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNIT 2 INFORMATION REQUEST FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Dear Mr. Pardee:

On October 5, 2009, the NRC will begin a Post-Approval Site Inspection for License Renewal at Dresden Unit 2, in accordance with NRC Inspection Procedure (IP) 71003. This inspection consists of three phases: an outage portion, a team inspection, and a follow-up inspection.

During the weeks of October 5, 2009 and October 19, 2009, a team of four inspectors will be on-site to perform Phase 2 of the inspection. Also, starting on November 9, 2009, two inspectors will perform Phase 1 of the inspection.

This inspection will focus on verifying that license conditions added as part of the renewed license, license renewal commitments, and selected aging management programs are implemented in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.

In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups:

  • The first group lists information necessary for our initial inspection scoping and in-office preparation activities. This information should be provided to the lead inspector by September 18, 2009.
  • The second group includes the additional information required for the team to review the selected activities. This information should be available to the team on-site October 5, 2009. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Dr. Stuart Sheldon. We understand that our licensing contact for this inspection is Mr. Joe Griffin of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829-9727 or via e-mail at Stuart.Sheldon@nrc.gov.

C. Pardee In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Request for Information, Post-Approval Site Inspection for License Renewal cc w/encl: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Manager Regulatory Assurance - Dresden Nuclear Power Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission

C. Pardee In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-237; 50-249;72-037 License Nos. DPR-19; DPR-25

Enclosure:

Request for Information, Post-Approval Site Inspection for License Renewal cc w/encl: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Manager Regulatory Assurance - Dresden Nuclear Power Station Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission DISTRIBUTION:

See next page DOCUMENT NAME: G:\Engineering Branch 2\License Renewal\Dresden\Dresden 71003 Ph 2 RFI.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl E = Copy with attach/encl N = No copy OFFICE RIII N RIII N NAME SSheldon:ls AStone DATE 07/30/09 07/31/09 OFFICIAL RECORD COPY

Letter to Mr. Charles G. Pardee from Dr. Stuart Sheldon dated July 31, 2009

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNIT 2 INFORMATION REQUEST FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Kenneth Obrien Jared Heck Allan Barker Jeannie Choe Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

INFORMATION REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL Inspection Report: 05000237/2009007(DRS)

Inspection Dates: October 5, 2009-November 20, 2009 Inspection Procedure: IP 71003 Post-Approval Site Inspection for License Renewal Lead Inspector: Stuart Sheldon, Lead Inspector (630) 829-9727 Stuart.Sheldon@nrc.gov I. Information Requested Prior to the On-site Information Gathering/Inspection Week The following information is requested by September 18, 2009, or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possible. (Please provide the information electronically in pdf files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, etc.). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in lists should contain enough information to be easily understood by someone who has knowledge of light water reactor technology).

1. Provide a list of your license renewal commitments with the completion status of each. If a commitment is not complete, please provide an anticipated completion date.
2. For each completed commitment, please provide documentation demonstrating that the commitment has been completed.
3. For any commitment that has been changed, please provide documentation of the commitment change process, and any associated justification.
4. Provide a list of your Aging Management Programs (AMPs), copies of the program basis documents for each, and a listing of the action tracking items for each.
5. For AMPS that are one-time inspection programs, provide a list of completed work order numbers for inspections that have been completed. This may be incorporated with the previous item.
6. Provide a list of any newly identified structures, systems and components (SSCs) pursuant to 10 CFR 54.37(b) and RIS-2007-16.

1 Enclosure

INFORMATION REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

7. Provide a copy of your updated final safety analysis report (UFSAR), or UFSAR update, which includes descriptions of your AMPs.
8. Provide a list of the one-time inspections credited for license renewal that will be completed during your outage. This list should include at a minimum, the system, component, work order number, and type of inspection.
9. Provide a listing of planned outage inspections, credited for license renewal, that provide observations of areas that are generally inaccessible at power, e.g.,

drywell liner and containment coating inspections. Include work order numbers where applicable.

10. Provide an outage schedule, sufficiently detailed as to list the work orders noted in Items 8 and 9.
11. Provide a copy of any self assessment that you have completed related to license renewal.
12. Provide current management and license renewal organizational charts.

II. Information requested to be available when the inspectors arrive on-site on October 5, 2009 and during the inspection.

1. Documentation demonstrating completion for those license renewal commitments completed as of the inspection date. For example, this may be in the form of a binder for each commitment which includes the implementing documentation and references.
2. Copies of any corrective action documents generated as a result of the teams questions or queries during this inspection.
3. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member).

If you have questions regarding the information requested, please contact the lead inspector.

2 Enclosure