ML091670466

From kanterella
Jump to navigation Jump to search
Transmittal of Fort Calhoun Station Technical Data Book (TDB)-IV, Revision 37, Core Operating Limit Report
ML091670466
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/28/2009
From: Horn K
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EC 46328
Download: ML091670466 (21)


Text

PASSPORT DOCUMENT To HORN KRISTI Facility FC Department : TRANSMITTAL Address DIRECTOR, OFFICE OF NRC - DOCUMENT CONTROL DESK, U.S. NRC WASHINGTON, DC 20555 Page 1 From Address DOCCON FC-2-3 Attention: Doc Management Distribution 1111 11 111 1111111 1 City Fort Calhoun State: Postal Code:

Country UNITED STATES Email Contact Kristi Horn 402-533-6714 6714 Date/Time 05/28/2009 10:33 Transmittal Group Id: 052809-1 Trans No. 000113420

Title:

05/28/09 ISSUE#1 Total Items: 00001 See Notes and Comments below.

Item Facility Type Sub Document Number Sheet Doc Status Revision Doc Date Copy # Media Cpys 0001 FC PROC TDB TDB-VI ACTIVE 037 51 P 01 Notes and Comments GENERAL CH-ANL-MI-0028 field copy 05/22/09 @1300 TDB-VI field copy 05/22/09 @1645 If a document was not received or is no longer required check the response below and return to sender.

Documents noted above not received (identify those not received).

I no longer require distribution of these documents (identify those no longer required).

Date: Signature:

Fort Calhoun Station Technical Data Book Page 5 of 5 TDB Document Document Title Revision/Date TDB-IV.10.a Acid Reducing Conditions (Ammonia 0.4 ppm or less) RO 04-04-06 TDB-IV.10.b Acid Reducing Condition (Ammonia greater than 0.4 ppm) RO 04-04-06 TDB-V - Work Sheets and Calculation Procedures TDB-V.1.B Estimated Critical Conditions Worksheet R22 05-18-08 TDB-V.3 Manual Group Mode Guide Table R4 05-27-05 TDB-V.6 Indication of Reactor Power Based on AT R7 07-05-05 TDB-V.9 Shutdown Margin Worksheet R39 05-18-08 TDB-V.11 Instrument Bus Loads and Failure Modes R42 06-03-08 TDB-V. 12 Miscellaneous Formula Sheet R10 05-02-08 TDB-V. 13 Reactor Vessel Coldown When Sweeping Steam R3 05-13-08 Generators TDB-VI Core Operatinq Limit Report R37 05-22-09 TDB-VII Tank Curves R14 08-14-08 TDB-VIII Equipment Operability Guidance R39 04-09-09 TDB-IX RCS Pressure and Temperature Limits Report R4 05-18-08 May 28, 2009 9:27 AM

PAGE 1 OF 19 Fort Calhoun Station Unit 1 TDB-VI TECHNICAL DATA BOOK CORE OPERATING LIMIT REPORT Change No. EC 46328 Reason for Change Revised Figure 9 to reflect only the useable volume of BAST level at various SIRWT boron concentrations.

Requestor T. Heng Preparer L. Hautzinger Issue Date 05-22-09 1645 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 2 OF 19 Fort Calhoun Station, Unit 1 Core Operating Limit Report Due to the critical aspects of the safety analysis inputs contained in this report, changes may not be made to this report without concurrence of the Nuclear Engineering Department.

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 3 OF 19 TABLE OF CONTENTS Item Description Page

1. INT R O D UC T IO N............................................................................................. 6
2. C O R E O PERATING LIM ITS ............................................................................ 6
3. T M/LP LIM IT ................................................................................................. 8
4. MAXIMUM CORE INLET TEMPERATURE ................................................... 8
5. POWER DEPENDENT INSERTION LIMIT ...................................................... 8
6. LIN EA R HEAT RAT E ...................................................................................... 9
7. EXCORE MONITORING OF LHR .................................................................... 9
8. PEAKING FACTO R LIM ITS ............................................................................ 9
9. D NB MO NITO R ING ........................................................................................ 9
10. FRT AND CORE POWER LIMITATIONS .......................................................... 9
11. REFUELING BORON CONCENTRATION ..................................................... 9

.12. AXIAL POW ER DISTRIBUTIO N .................................................................... 10

13. SHUTDOWN MARGIN WITH Tcold > 210-F ................................................... 10
14. MOST NEGATIVE MODERATOR TEMPERATURE COEFFICIENT ............. 10
15. STEAM GENERATOR DIFFERENTIAL PRESSURE ................................... 10 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 4 OF 19 LIST OF TABLES Table No. Title Page 1 T M/LP C oefficients ......................................................................................... 8 2 Refueling Boron Concentrations ................................. .9.......... 9 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 5 OF 19 LIST OF FIGURES Figure No. Title Page 1 Thermal Margin/Low Pressure for 4 Pump Operation ..................................... 11 2 Power Dependent Insertion Limit ................................................................... 12 3 Allowable Peak Linear Heat Rate vs. Burnup ................................................. 13 4 E xcore Monitoring of LH R .................................................................................. 14 5 D NB Mo nito ring ........................................................................................... . . 15 6 FRT and Core Power Limitations ................................................... ...... 16 7 Axial Power Distribution LSSS for 4 Pump Operation ..................................... 17 8 Axial Power Distribution Limits for 4 Pump Operation with Incores Inoperable.. 18 9 Minimum Boric Acid Storage Tank Level vs. Stored Boric Acid Storage Tank C o nce ntratio n ......................................................................... ..................... . . 19 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 6 OF 19 CORE OPERATING LIMIT REPORT

1. INTRODUCTION This report provides the cycle-specific limits for operation of the Fort Calhoun Station Unit 1 for Cycle 25 operation. It includes limits for:
  • TM/LP LSSS for 4 Pump Operation (PVAR)

" Core Inlet Temperature (TIN)

  • Power Dependent Insertion Limit (PDIL)

" Allowable Peak Linear Heat Rate

  • Excore Monitoring of LHR

" Integrated Radial Peaking Factor (FRT)

  • FRT versus Power Trade-off Curve

" Refueling Boron Concentration

" Axial Power Distribution (APD)

  • Most Negative Moderator Temperature Coefficient These limits are applicable for the duration of the cycle. For subsequent cycles the limits will be reviewed and revised as necessary. In addition, this report includes a number of cycle-specific coefficients used in the generation of certain reactor protective system trip setpoints or allowable increases in radial peaking factors.
2. CORE OPERATING LIMITS All values and limits in this TDB section apply to Cycle 25 operation. This cycle must be operated within the bounds of these limits and all others specified in the Technical Specifications.

This report has been prepared in accordance with the requirements of Technical Specification 5.9.5. The list of references below are complete citations of topical reports and include the report number, title, revision, date, and any supplements in accordance with the basis for NRC approval of License Amendment No. 196 which eliminated these specific entries from Technical Specification 5.9.5. NRC approval of Amendment No. 196 is consistent with the requirements of the Technical Specification Task Force, Improved Standard Technical Specification Change Traveler, "Revise Topical Report References in ITS 5.6.5 COLR" (TSTF-363-A, Rev. 0). In accordance with this Traveler and Amendment No. 196, this information must be maintained within this TDB section.

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 7 OF 19 The values and limits presented within this TDB section have been derived using the NRC approved methodologies listed below:

  • OPPD-NA-8301, "Reload Core Analysis Methodology Overview," Revision 8, dated August 2004. (TAC No. MC4304)
  • OPPD-NA-8302, "Reload Core Analysis Methodology, Neutronics Design Methods and Verification," Revision 6, dated August 2004. (TAC No. MC4304)
  • OPPD-NA-8303, "Reload Core Analysis Methodology, Transient and Accident Methods and Verification," Revision 7, dated August 2005. (TAC No. MC4304)
  • XN-75-32(P)(A) Supplements 1, 2, 3, & 4, "Computational Procedure for Evaluating Fuel Rod Bowing," October 1983.
  • XN-NF-79-56(P)(A), Revision 1, Supplement 1, "Gadolinia Fuel Properties of LWR Fuel Safety Evaluation," November 1981.
  • XN-NF-82-06(P)(A) and Supplements 2, 4, and 5, "Qualification of Exxon Nuclear Fuel for Extended Burnup," Revision 1, October 1986.
  • XN-NF-85-92(P)(A), "Exxon Nuclear Uranium Dioxide/Gadolinia Irradiation Examination and Thermal Conductivity Results," August 1985.
  • ANF-88-133(P)(A) and Supplement 1, "Qualification of Advanced Nuclear Fuels PWR Design Methodology for Rod Burnups of 62 GWd/MTU," December 1991.

" EMF-92-116(P)(A), "Generic Mechanical Design Criteria for PWR Fuel Designs,"

Revision 0, February 1999.

  • XN-NF-78-44(P)(A), "A Generic Analysis of the Control Rod Ejection Transient for Pressurized Water Reactors," October 1983.
  • XN-NF-82-21(P)(A), "Application of Exxon Nuclear Company PWR Thermal Margin Methodology to Mixed Core Configurations," Revision 1, September 1983.

" EMF-1961(P)(A), "Statistical Setpoint/Transient Methodology for Combustion Engineering Type Reactors," Revision 0, July 2000.

  • ANF-89-151(P)(A), "ANF-RELAP Methodology for Pressurized Water Reactors:

Analysis of Non-LOCA Chapter 15 Events," Revision 0, May 1992.

  • EMF-92-153(P)(A), "HTP: Departure from Nucleate Boiling Correlation for High Thermal Performance Fuel," Revision 1, January 2005.
  • XN-NF-82-49(P)(A), Supplement 1, "Exxon Nuclear Company Evaluation Model Revised EXEM PWR Small Break Model," Revision 1, December 1994.
  • EMF-2103(P)(A), "Realistic Large Break LOCA Methodology for Pressurized Water Reactors," Revision 0, April 2003.

" EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model, S-RELAP5 Based,"

Revision 0, March 2001.

  • EMF-96-029(P)(A) Volume 1, EMF-96-029(P)(A) Volume 2, EMF-96-029(P)(A)

Attachment, "Reactor Analysis System for PWRs, Volume 1 - Methodology Description, Volume 2 - Benchmarking Results," January 1997.

  • EMF-2310(P)(A), "SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors," Revision 1, May 2004.

" BAW-10240(P)(A), "Incorporation of M5TM Properties in Framatome ANP Approved Methods," Revision 0, May 2004.

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 8 OF 19 TM/LP LIMIT

. 3.

The TM/LP coefficients are shown below:

Table 1 -TM/LP Coefficients Coefficient Value a 29.6 20.63 13

-12372 The TM/LP setpoint is calculated by the PVAR equation, shown below and in Figure 1:

PVAR = 29.6 PF(B) AI(Y)B + 20.63TIN - 12372 PF(B) = 1.0 for B >_100%

= -0.008(B)+1.8 for 50% < B < 100%

= 1.4 for B < 50%

AI(Y) = -0.6666(Y1 ) + 1.000 for Y1 *<0.00

= +0.3333(Y1 ) + 1.000 for Y1 > 0.00 Where:

B = High Auctioneered thermal (AT) or Nuclear Power, % of rated power Y = Axial Shape Index, asiu TIN = Core Inlet Temperature, 'F PVAR = Reactor Coolant System Pressure, psia

4. MAXIMUM CORE INLET TEMPERATURE The maximum core inlet temperature (TIN) shall not exceed 5450 F. This value includes instrumentation uncertainty of +/-20 F (Ref: FCS Calculation FC06292, 6/9/95).

This limit is not applicable during either a thermal power ramp in excess of 5% of rated thermal power per minute or a thermal power step greater than 10% of rated thermal power.

5. POWER DEPENDENT INSERTION LIMIT The power dependent insertion limit is defined in Figure 2.

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 9 OF 19

6. LINEAR HEAT RATE The allowable peak linear heat rate is shown in Figure 3.
7. EXCORE MONITORING OF LHR The allowable operation for power versus axial shape index for monitoring of LHR with excore detectors is shown in Figure 4.
8. PEAKING FACTOR LIMITS The maximum full power value for the integrated radial peaking factor (FRT) is 1.732.
9. DNB MONITORING The core operating limits for monitoring of DNB are provided in Figure 5. This figure provides the allowable power versus axial shape index for the cycle.
10. FRT AND CORE POWER LIMITATIONS Core power limitations versus FRT are shown in Figure 6.
11. REFUELING BORON CONCENTRATION The refueling boron concentration is required to ensure a shutdown margin of not less than 5% with all CEAs withdrawn. The refueling boron concentration' must be at least 1,900 ppm through the end of Cycle 24 operation and is valid until the beginning of core reload for Cycle 25.

Listed below in Table 2 are the refueling boron concentration values for Cycle 25 operations:

Table 2 - Refueling Boron Concentrations Cycle Average Burnup Refueling Boron (MWD/MTU) Concentration (ppm)

BOC 2,141

> 2,000 2,014

_4,000 1,900 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 10 OF 19

12. AXIAL POWER DISTRIBUTION The axial power trip is provided to ensure that excessive axial peaking will not cause fuel damage. The Axial Shape Index is determined from the axially split excore detectors.

The setpoint functions, shown in Figure 7 ensure that neither a DNBR of less than the minimum DNBR safety limit nor a fuel centerline temperature greater than the associated safety limit (that which would result in fuel melting) will exist as a consequence of axial power maldistributions. The calculated cycle-specific FCM temperature for Cycle 25 corresponds to 23.416 kw/ft. Allowances have been made for instrumentation inaccuracies and uncertainties associated with the excore symmetric offset - incore axial peaking relationship. Figure 8 combines the LHR LCO tent from Figure 4, the DNB LCO tent from Figure 5, and the APD LSSS tent from Figure 7 into one figure for a visual comparison of the different limits.

13. SHUTDOWN MARGIN WITH TcoId > 210-F Whenever the reactor is in hot shutdown, hot standby or power operation conditions, the shutdown margin shall be >3.6% Ak/k. With the shutdown margin <3.6% Ak/k, initiate and continue boration until the required shutdown margin is achieved.
14. MOST NEGATIVE MODERATOR TEMPERATURE COEFFICIENT The moderator temperature coefficient (MTC) shall be more positive than

-3.30 x 10-4 Ap/ 0 F, including uncertainties, at rated power.

15. STEAM GENERATOR DIFFERENTIAL PRESSURE The steam generator differential pressure trip of Technical Specification Table 2-11, Item 9 at 135 psid ensures that neither a DNBR of less than the minimum DNBR safety limit nor a fuel centerline temperature greater than the associated safety limit (that which would result in fuel melting) will exist as a consequence of axial power maldistributions resulting from asymmetric steam generator transients. The calculated cycle-specific FCM temperature for Cycle 25 corresponds to 23.416 kw/ft.

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 11 OF 19 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 12 OF 19 R

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 13 OF 19 18 UNACCEPTABLE OPERATION 16 15.5 KW/FT 14 R

U- ACCEPTABLE OPERATION 12 I--

Lu 10 I-8 I

w z¸ 6

4 2

0 5000 10000 15000 20000 BURNUP (MWD/MTU)

COLR ALLOWABLE PEAK LINEAR HEAT RATE FIGURE IVS. BURNUP 'I 3 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 14 OF 19 110 100 90 80 w

70 30 0 60 0

50 L) 0

-J 40 0

a.

ow LL 0

30 0d z

w, 20 10 0

-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 AXIAL SHAPE INDEX (ASIU)

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 15 OF 19 110 100 90 80 w

70 0

60 w

0 50 LL 0

40 u-z 30 0-20 10 0

-1.0 -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 1.0 AXIAL SHAPE INDEX (ASIU)

R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 16 OF 19 110 (1.732,100) 100 90 w

5,.8768)

""*ý1.

w 80 0

0-70 0

w 60 0

50

-J 0 40 + i4 0 +

z w

30 w

a-20 10 4. 4 .4 0 1 1.70 1.75 1.80 1.85 1.90 PEAKING FACTOR R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 17 OF 19 150 140 130 120 110 w

100 3..

0u,, 90 V 80 70 0

60 w 50 I,-,

LI.,

,z5 Of 40 0-30 20 10 0

-1.0 -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 1.0 AXIAL SHAPE INDEX (ASIU)

AXIAL POWER DISTRIBUTION LSSS FOR 4 PUMP OPERATION R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 18 OF 19 150 140 130 120 110 w

0 100 0~

w 90 0

80 w

70 0

u- 60 0 50 I-z w 40 w 30 0-20 10 0

-1.0 -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 1.0 AXIAL SHAPE INDEX (ASIU)

ýPUMP OPERATION AXIAL WITH INCORES POWER DISTRIBUTION INOPERABL LIMITS FOR 4 R37

FORT CALHOUN STATION TDB-VI TECHNICAL DATA BOOK PAGE 19 OF 19 R37