Text
Rafael Flores Luminant Power Senior Vice President P 0 Box 1002
& Chief Nuclear Officer 6322 North FM 56 rafael.flores@Luminant.com Glen Rose, TX 76043 Luminant ooo Luminan 254 897 5550 C 817 559 0403 F 254 897 6652 CP-200900751 Log # TXX-09078 May 28, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 SUPPLEMENT TO THE PROPOSED COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP) EMERGENCY PLAN CHANGE TO IMPLEMENT NEI 99-01, REVISION 5, EMERGENCY ACTION LEVELS (EALs)
References:
- 1.
Letter logged TXX-09072 dated May 12, 2009 from Rafael Flores to the NRC submitting the proposed Comanche Peak Nuclear Power Plant Emergency Plan change to implement NEI 99-01, Revision 5, Emergency Action Levels.
- 2.
Telephone conference on May 26, 2009 between CPNPP and the NRC (Balwant Singal, Don Johnson) regarding the letter in Reference 1.
Dear Sir or Madam:
On May 12, 2009 Luminant Generation Company LLC (Luminant Power) submitted proposed changes to the Comanche Peak Nuclear Power Plant (CPNPP) Emergency Action Levels (EALs) (Reference 1).
Reference 1 stated that the proposed changes were submitted for NRC approval pursuant to 10CFR50.54(q). However, as was discussed in a telephone conversation on May 26, 2009 (Reference 2),
since the proposed changes are the result of an upgrade of the CPNPP EALs to NEI 99-01, Revision 5, the regulatory requirement for NRC approval of the proposed changes is actually provided in 10CFR50 Appendix E section IV.B.(1). Accordingly, the proposed changes are submitted for NRC approval pursuant to IOCFR50 Appendix E section IV.B.(1).
In addition, in Reference 1, Luminant Power had requested approval of the proposed changes by January 15, 2010 in order to facilitate coordination with the licensed operator training cycle. However, as was discussed on the May 26, 2009 telephone conference (Reference 2), the normal NRC review cycle will suffice for this request.
U. S. Nuclear Regulatory Commission TXX-09078 Page 2 05/28/2009 This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2.
Should you have any questions, please contact Jim Barnette at (254) 897-5866.
Sincerely, Luminant Generation Company LLC Rafael Flores By: AFred'W. Madden Director, Oversight & Regulatory Affairs c -
E.E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, CPNPP P. J. Elkmann, Region IV