Appendix D Scenario Outline Form ES-D-1 Facility: PALISADES Scenario No.: ONE Op-Test No.: 1 Examiners: ____________________________ Operators:

Initial Conditions:

74% power. P-54A, Containment Spray Pump out of service for seal cooler inspection (SI28).

Turnover: Shift orders are to continue the power escalation at 4% per hour.

Event No.

Malf. No.

Event Type*

Event Description 1

N/A SRO(N)

RO(R)

BOP(N)

Power escalation 2

CC02 SRO(C)

RO(C)

P-52A, Component Cooling Water Pump Trips (STANDBY pumps fail to start) 3 FT01B SRO(C)

BOP(C)

B Main Feedwater Pump trips 4

CH03AA SRO(C)

V-1A, Containment Air Cooling Fan, trips 5

MS03A ALL (C)

A S/G Main Steam Line Leak Inside Containment (small leak requiring a manual plant trip) 6 Override RO(I)

BOP(I)

C-02 Reactor Trip P/B fails (requires trip from C-06) 7 MS03A ALL (M)

ESDE inside containment (ramped in at time of trip) 8 CH05A SRO (I)

RO (I)

Left Channel Containment Spray fails to actuate (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor