Appendix D Scenario Outline Form ES-D-1 Facility: PALISADES Scenario No.: TWO Op-Test No.: 1 Examiners: ____________________________ Operators: _____________________________

Initial Conditions:

25% power.

Turnover:

A Chemistry hold has just been lifted. Shift orders are to begin an 8%per hour power escalation.

Event No.

Malf. No.

Event Type*

Event Description 1

N/A SRO (N)

RO (R)

BOP (N)

Power escalation 2

RP11D SRO (I)

BOP (I)

Power Range NI-08 fails 3

SW04B SRO (C)

RO (C)

P-7B, Service Water Pump, trips, STANDBY SW pump does not start 4

Override SRO (I)

RO (I)

Pressurizer Heaters lost on low level instrument failure (half restored) 5 RC03 SRO (C)

RO (C)

BOP (C)

PSC leak ramps to 15 gpm (requires a plant trip) 6 FW06B BOP(I)

CV-0703, B S/G FRV fails to close 7

SG01B ALL (M)

Steam Generator Tube Rupture on B S/G (initiates at time of trip)

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor