Appendix D Scenario Outline Form ES-D-1 Facility: PALISADES Scenario No.: TWO Op-Test No.: 1 Examiners: ____________________________ Operators: _____________________________
Initial Conditions:
25% power.
Turnover:
A Chemistry hold has just been lifted. Shift orders are to begin an 8%per hour power escalation.
Event No.
Malf. No.
Event Type*
Event Description 1
N/A SRO (N)
RO (R)
BOP (N)
Power escalation 2
RP11D SRO (I)
BOP (I)
Power Range NI-08 fails 3
SW04B SRO (C)
RO (C)
P-7B, Service Water Pump, trips, STANDBY SW pump does not start 4
Override SRO (I)
RO (I)
Pressurizer Heaters lost on low level instrument failure (half restored) 5 RC03 SRO (C)
RO (C)
BOP (C)
PSC leak ramps to 15 gpm (requires a plant trip) 6 FW06B BOP(I)
CV-0703, B S/G FRV fails to close 7
SG01B ALL (M)
Steam Generator Tube Rupture on B S/G (initiates at time of trip)
(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor