Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement 1CAN102101, SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2021-10-0606 October 2021 SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN092101, License Amendment Request Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2021-09-30030 September 2021 License Amendment Request Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 2CAN052102, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2021-05-26026 May 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors 1CAN052102, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2021-05-26026 May 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors 1CAN022102, Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2021-02-22022 February 2021 Supplement Related to License Amendment Request to Replace the Reactor Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 0CAN022102, Unit 2; License Amendment Request - One-Time Change to Support Proactive Upgrade of the Emergency - Cooling Pond Supply Piping2021-02-0808 February 2021 Unit 2; License Amendment Request - One-Time Change to Support Proactive Upgrade of the Emergency - Cooling Pond Supply Piping 2CAN112004, License Amendment Request - Application to Adopt a Safety Function Determination Program (SFDP)2020-11-17017 November 2020 License Amendment Request - Application to Adopt a Safety Function Determination Program (SFDP) 2CAN092003, License Amendment Request, Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2020-09-24024 September 2020 License Amendment Request, Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions 1CAN072001, Supplemental Information Related to License Amendment Request to Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2020-07-21021 July 2020 Supplemental Information Related to License Amendment Request to Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 1CAN022001, License Amendment Request: Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate2020-02-24024 February 2020 License Amendment Request: Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent Sodium Tetraborate 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 2CAN121903, License Amendment Request, Revise Control Element Assembly Drop Time2019-12-18018 December 2019 License Amendment Request, Revise Control Element Assembly Drop Time 2CAN121901, License Amendment Request Technical Specification Deletions, Additions, and Relocations2019-12-16016 December 2019 License Amendment Request Technical Specification Deletions, Additions, and Relocations 1CAN101903, Supplement to License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2019-10-23023 October 2019 Supplement to License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO 0CAN091901, Unit 2: License Amendment Request - Change in Implementation Date for Amendments 263 and 3142019-09-0505 September 2019 Unit 2: License Amendment Request - Change in Implementation Date for Amendments 263 and 314 2CAN081903, License Amendment Request Technical Specification (TS) Change Related to Revised Fuel Handling Accident Analysis and Adoption of TS Improvements Consistent with NUREG-14322019-08-29029 August 2019 License Amendment Request Technical Specification (TS) Change Related to Revised Fuel Handling Accident Analysis and Adoption of TS Improvements Consistent with NUREG-1432 1CAN051901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.2019-05-29029 May 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF 563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. 0CAN041904, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis2019-04-29029 April 2019 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis 1CAN031901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-25025 March 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 1CAN121801, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2018-12-19019 December 2018 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 2CAN121801, License Amendment Request, Add Actions to Address Inoperability of the Containment Building Sump2018-12-19019 December 2018 License Amendment Request, Add Actions to Address Inoperability of the Containment Building Sump 2CAN051801, License Renewal Pressurizer Surge Line and Safety Injection Nozzle Inspection2018-05-24024 May 2018 License Renewal Pressurizer Surge Line and Safety Injection Nozzle Inspection ML18094A1552018-03-29029 March 2018 Enclosures 2 - 6: Proposed EAL Technical Basis Document, NEI 99-01. Rev. 6., Proposed EAL Matrix Chart/Review Table and Supporting Referenced Document Pages 0CAN031801, Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62018-03-29029 March 2018 Unit 2 - License Amendment Request - Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 1CAN031801, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-03-12012 March 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) 2CAN121702, License Amendment Request Post-Accident Instrumentation Technical Specification Revision2017-12-14014 December 2017 License Amendment Request Post-Accident Instrumentation Technical Specification Revision 2CAN111702, License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits2017-11-20020 November 2017 License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits 1CAN101701, License Amendment Request Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves2017-10-0202 October 2017 License Amendment Request Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments 2CAN081701, Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability.2017-08-14014 August 2017 Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability. 1CAN081701, Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability.2017-08-14014 August 2017 Application to Revise Technical Specifications to Adopt TSTF-427, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability. 2CAN071701, License Amendment Request, Application for Technical Specification Improvement to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-14322017-07-17017 July 2017 License Amendment Request, Application for Technical Specification Improvement to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432 1CAN071701, License Amendment Request, Application for Technical Specification Improvement to Revise Actions for Inoperable Using the Consolidated Line Item Improvement Process2017-07-17017 July 2017 License Amendment Request, Application for Technical Specification Improvement to Revise Actions for Inoperable Using the Consolidated Line Item Improvement Process 1CAN061701, Amendment 27 of the SAR, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2017-06-0707 June 2017 Amendment 27 of the SAR, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 1CAN041702, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line.2017-04-24024 April 2017 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line. 2CAN041702, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.2017-04-24024 April 2017 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. 2CAN101601, License Amendment Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications2016-10-27027 October 2016 License Amendment Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications 1CAN051602, Update to Tables S-1 and S-2 - Adoption of National Fire Protection Association Standard NFPA-8052016-05-19019 May 2016 Update to Tables S-1 and S-2 - Adoption of National Fire Protection Association Standard NFPA-805 2CAN031602, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme..2016-03-25025 March 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme.. 2023-07-27
[Table view] Category:Technical Specification
MONTHYEAR2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement 1CAN102101, SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2021-10-0606 October 2021 SAR Amendment 30, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 2CAN121901, License Amendment Request Technical Specification Deletions, Additions, and Relocations2019-12-16016 December 2019 License Amendment Request Technical Specification Deletions, Additions, and Relocations 1CAN061902, Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2019-06-18018 June 2019 Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 1CAN031901, License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2019-03-25025 March 2019 License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. 1CAN111802, ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2018-11-12012 November 2018 ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report 2CAN121705, Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 262017-12-28028 December 2017 Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 2CAN111702, License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits2017-11-20020 November 2017 License Amendment Request - Updating the Reactor Coolant System Pressure-Temperature Limits 1CAN031604, Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Co2016-03-25025 March 2016 Arkansas, Unit 1 - Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code 2CAN031602, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme..2016-03-25025 March 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the Asme.. 2CAN121502, Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process2015-12-22022 December 2015 Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c, Using the Consolidated Line Item Improvement Process 1CAN121403, License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441).2014-12-0505 December 2014 License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441). 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) 1CAN011406, Amendment 25 of the ANO Unit 1 Safety Analysis Report2014-01-29029 January 2014 Amendment 25 of the ANO Unit 1 Safety Analysis Report 1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-12-11011 December 2013 Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN061302, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712013-06-18018 June 2013 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN031306, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441)2013-03-26026 March 2013 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441) 2CAN071201, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-07-0909 July 2012 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 2CAN041201, License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-04-0404 April 2012 License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 1CAN041102, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-29029 April 2011 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation. 1CAN081001, License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves2010-08-24024 August 2010 License Amendment Request, Technical Specification Change Associated with Main Feedwater Isolation Valves 2CAN081009, Emergency License Amendment Request Extension of ANO-2 Emergency Diesel Generator Allowed Outage Time2010-08-19019 August 2010 Emergency License Amendment Request Extension of ANO-2 Emergency Diesel Generator Allowed Outage Time 1CAN081002, License Amendment Request, Changes to Technical Specification 3.9.3, Technical Change Traveler - TSTF-312, Rev. 12010-08-10010 August 2010 License Amendment Request, Changes to Technical Specification 3.9.3, Technical Change Traveler - TSTF-312, Rev. 1 2CAN061003, Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years2010-06-17017 June 2010 Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years ML1016803802010-06-17017 June 2010 License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 1CAN021004, Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2010-02-28028 February 2010 Response to Request for Additional Information, Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. 2CAN060903, License Amendment Request, Technical Specification Changes to Relocate Pressurizer Heater Requirements to Technical Requirements Manual2009-06-18018 June 2009 License Amendment Request, Technical Specification Changes to Relocate Pressurizer Heater Requirements to Technical Requirements Manual 2CAN050902, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report2009-05-15015 May 2009 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report 2CAN050901, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-05-13013 May 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2CAN030902, License Amendment Request, Technical Specification Change to Delete COLR References2009-03-10010 March 2009 License Amendment Request, Technical Specification Change to Delete COLR References 1CAN030901, License Amendment Request on Technical Specification Change to Delete Low Pressurizer Level Limit2009-03-10010 March 2009 License Amendment Request on Technical Specification Change to Delete Low Pressurizer Level Limit 2CAN120801, License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM2008-12-11011 December 2008 License Amendment Request Supplemental Regarding Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers and Relocate TS 3.7.8 to the TRM 2CAN070801, Supplement to License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-3592008-07-0808 July 2008 Supplement to License Amendment Request Regarding Technical Specification Changes Associated with Adoption of TSTF-359 2CAN030806, Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2008-03-27027 March 2008 Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient 2CAN100701, License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process 1CAN100703, License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes and Analyses Relating to Use of Alternate Source Term 2CAN100703, Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer2007-10-0505 October 2007 Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer ML0726300862007-09-28028 September 2007 License and Technical Specification Pages - Amendment No. 273 Revisions to TS to Support Partial Re-Rack and Revised Loading Patterns in the Spent Fuel Pool ML0722901082007-08-0202 August 2007 Supplement to Amendment Request to Delete the Fuel Handling Area Ventilation System and Associated Filter Testing Program Requirements 2023-09-21
[Table view] Category:Amendment
MONTHYEAR1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21182A1582021-07-0101 July 2021 Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections 1CAN012002, License Amendment Request: Revise Loss of Voltage Relay Allowable Values2020-01-24024 January 2020 License Amendment Request: Revise Loss of Voltage Relay Allowable Values 1CAN061902, Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues2019-06-18018 June 2019 Supplemental Change Related to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues 2CAN121705, Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 262017-12-28028 December 2017 Exigent License Amendment Request Allowance to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) 1CAN121301, Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits2013-12-11011 December 2013 Clarification of Proposed Change to Technical Specification 2.1.1.1 Reactor Core Safety Limits 2CAN071201, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-07-0909 July 2012 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 2CAN041201, License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-04-0404 April 2012 License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 ML1016803802010-06-17017 June 2010 License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 2CAN061003, Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years2010-06-17017 June 2010 Arkansas Nuclear One, Unit 2 - License Amendment Request, Technical Specification Change to Extend the Type a Test Frequency to 15 Years 2CAN050902, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report2009-05-15015 May 2009 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report 2CAN050901, License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit2009-05-13013 May 2009 License Amendment Request to Revise the Departure from Nucleate Boiling Ratio (DNBR) Safety Limit ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions 2CAN030806, Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2008-03-27027 March 2008 Supplemental to License Amendment Request, Technical Specification 3.1.1.4, Moderator Temperature Coefficient 2CAN100701, License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process2007-10-22022 October 2007 License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process 2CAN100703, Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer2007-10-0505 October 2007 Unit 2 License Amendment Request for Technical Specification Change Associated with Replacement of Containment Sump Buffer ML0726300862007-09-28028 September 2007 License and Technical Specification Pages - Amendment No. 273 Revisions to TS to Support Partial Re-Rack and Revised Loading Patterns in the Spent Fuel Pool 2CAN050702, License Amendment Requesting, Technical Specification 3.1.1.4, Moderator Temperature Coefficient2007-05-0808 May 2007 License Amendment Requesting, Technical Specification 3.1.1.4, Moderator Temperature Coefficient ML0704400422007-02-26026 February 2007 Corrected Tech Spec Pgs - Correction to Amendment No. 228 for the Use of Metamic Poison Insert Assemblies in the Spent Fuel Pool 1CAN080601, License Amendment Request Regarding the Relocation of Inverter Y-28 and Panel C-540 Requirements from TSs to TRM2006-08-31031 August 2006 License Amendment Request Regarding the Relocation of Inverter Y-28 and Panel C-540 Requirements from TSs to TRM 1CAN070603, License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool2006-07-27027 July 2006 License Amendment Request to Support the Use of Metamic@ Polson Insert Assembles in the Spent Fuel Pool 2CAN020601, License Amendment Request to Modify Technical Specification Surveillance Requirement 4.6.1.1.a2006-02-14014 February 2006 License Amendment Request to Modify Technical Specification Surveillance Requirement 4.6.1.1.a 2CAN090504, Arkansas, Unit 2 - License Amendment Request to Modify Technical Specification 3.1.1.5, Minimum Temperature for Criticality2005-09-19019 September 2005 Arkansas, Unit 2 - License Amendment Request to Modify Technical Specification 3.1.1.5, Minimum Temperature for Criticality 2CAN090502, Arkansas, Unit 2 - License Amendment Request to Allow One-Time Extension of Containment Spray System Allowable Outage Time2005-09-19019 September 2005 Arkansas, Unit 2 - License Amendment Request to Allow One-Time Extension of Containment Spray System Allowable Outage Time 2CAN070503, Arkansas, Unit 2 - License Amendment Request to Add Cask Loading Restrictions2005-07-21021 July 2005 Arkansas, Unit 2 - License Amendment Request to Add Cask Loading Restrictions ML0513700652005-05-13013 May 2005 ANO, Unit 2 -Technical Specification Pages Elimination of Requirements to Provide Monthly Operating Reports ML0509000042005-03-23023 March 2005 ANO Unit 2, Technical Specification.Pages Request to Support Cycle 18 Core Reload ML0414105232004-05-12012 May 2004 Arkansas, Unit 2, License Amendment Request to Support Cycle 18 Core Reload 1CAN120301, ANO, Unit 1 - Supplement to Amendment Request to Add a New Control Room Emergency Ventilation System Surveillance Requirement2003-12-16016 December 2003 ANO, Unit 1 - Supplement to Amendment Request to Add a New Control Room Emergency Ventilation System Surveillance Requirement ML0325906772003-09-11011 September 2003 Amendment 251 to License Re. Emergency Core Cooling Systems Technical Specification Pages ML0323104992003-08-12012 August 2003 Supplement to Amendment Request to Revise the Spent Fuel Pool Loading Pattern ML0322304332003-08-0808 August 2003 Amendment No. 249, Technical Specifications, Re. Emergency Diesel Generator Allowable Outage Time ML0318907712003-06-30030 June 2003 License Amendment Request, to Revise Spent Fuel Pool Loading Pattern 2CAN050304, Arkansas, Unit 2, License Amendment Request to Change Containment Spray System Surveillance2003-05-0101 May 2003 Arkansas, Unit 2, License Amendment Request to Change Containment Spray System Surveillance 2CAN090202, Arkansas Unit 2, Application for Amendment to License NPF-6 to Amend Technical Specifications to Extend Allowable Outage Time (AOT) for Emergency Diesel Generators (Edgs) from 72 Hours to Maximum of 14 Days2002-09-19019 September 2002 Arkansas Unit 2, Application for Amendment to License NPF-6 to Amend Technical Specifications to Extend Allowable Outage Time (AOT) for Emergency Diesel Generators (Edgs) from 72 Hours to Maximum of 14 Days 2023-09-21
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Kevin T. Walsh Vice President, Operations Arkansas Nuclear One 2CAN050901 May 13, 2009 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request to Revise the Departure From Nucleate Boiling Ratio (DNBR) Safety Limit Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6
REFERENCES:
- 1. WCAP-16523-P-A, Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes, August 2007
- 2. WCAP-16500-P-A, CE 16 x 16 Next Generation Fuel Core Reference Report, Revision 0, August 2007
- 3. Entergy Letter to the US Nuclear Regulatory Commission, Attn:
Document Control Desk from Mr. T. G. Mitchell, Vice President, Arkansas Nuclear One, Technical Specification Change to Modify RCS Flow Verification, dated November 13, 2008
- 4. WCAP-387-P-A, ABB Critical Heat Flux Correlations for PWR Fuel, Revision 0, May 2000
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests the following amendment for Arkansas Nuclear One, Unit 2 (ANO-2). The proposed change will modify the Technical Specification (TS) 2.1.1.1 DNBR safety limit based upon the Combustion Engineering (CE) 16 x 16 Next Generation Fuel (NGF) design and the associated Departure from Nucleate Boiling (DNB) correlations (References 1 and 4). The limiting safety system setting reactor trip setpoint for DNBR - Low, listed in TS Table 2.2-1, is not impacted by this change.
2CAN050901 Page 2 of 3 The NGF design improves fuel reliability to resolve grid-to-rod fretting failures, improves fuel performance for high duty operation, and provides enhanced DNB margin. The licensing basis for this fuel design is provided in Reference 2. As noted in Reference 2, the ABB-TV DNB correlation gives conservative predictions relative to the NGF DNB test data. As a result of this NGF test data, a new DNB correlation for the NGF fuel assembly was submitted to the NRC. The NRC has approved the new correlation for safety and setpoint analyses (Reference 1). This proposed change is to make the TS consistent with that approval and application of the new correlation. Justification for the proposed change to TS 2.1.1.1 is provided in Attachment 1. A mark-up of the affected TS is provided in Attachment 2.
References 1, 2, and 4 cited above and all but one of the references provided in Attachment 1 are currently part of the ANO-2 licensing basis.
A mark-up of the associated TS 2.1.1.1 Bases is provided in Attachment 3 for information only.
The TS bases, controlled in accordance with the TS Bases Control Program of TS 6.5.14, will be revised accordingly upon approval of this request.
The proposed change has been evaluated in accordance with 10 CFR 50.91(a)(1) using the criteria in 10 CFR 50.92(c), and it has been determined that the changes involve no significant hazards consideration. The bases for these determinations are included in the attached submittal.
The proposed change does not include any new commitments.
This submittal does not impact the Reference 3 submittal.
Entergy requests approval of the proposed amendment by September 16, 2009, to support the Fall 2009 refueling outage. Once approved, the amendment shall be implemented after the current cycle (Cycle 20) is completed and prior to the operation of Cycle 21.
If you have any questions or require additional information, please contact David Bice at 479-858-5338.
I declare under penalty of perjury that the foregoing is true and correct. Executed on May 13, 2009.
Sincerely, Original signed by K. Walsh KTW/rwc Attachments:
- 1. Analysis of Proposed Technical Specification Change
- 2. Proposed Technical Specification Changes (mark-up)
- 3. Proposed Technical Specification Bases Changes (mark-up) - For Information
2CAN050901 Page 3 of 3 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Director Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205
Attachment 1 2CAN050901 Analysis of Proposed Technical Specification Change to 2CAN050901 Page 1 of 7
1.0 DESCRIPTION
This letter is a request to amend Operating License NPF-6 for Arkansas Nuclear One, Unit 2 (ANO-2).
The proposed change will modify Technical Specification (TS) 2.1.1.1 to account for the Combustion Engineering (CE) 16 x 16 Next Generation Fuel (NGF) and different NRC reviewed and approved Departure from Nucleate Boiling (DNB) correlations (References 7.1 and 7.3).
These new correlations will be implemented in the safety analyses for the next fuel cycle of operation consistent with NRC approved methodologies.
2.0 PROPOSED CHANGE
The safety limit for the Departure from Nucleate Boiling Ratio (DNBR) is revised from greater than or equal to 1.25 with the CE-1 correlation to greater than or equal to 1.23 with the WSSV-T and ABB-NV correlations. The DNBR value of 1.23 is the more limiting value that was determined using either the WSSV-T or the ABB-NV correlation.
A draft mark-up of the associated TS Bases is provided in Attachment 3 for information only.
The TS bases, controlled in accordance with the TS Bases Control Program of TS 6.5.14, will be revised accordingly upon approval of this request.
3.0 BACKGROUND
The goals for the NGF assembly design include improving fuel reliability to resolve grid-to-rod fretting failures, improving fuel performance for high duty operation, and providing enhanced thermal margin for DNB. The NGF design improves heat transfer performance of the fuel design through the following design changes: (1) the addition of Intermediate Flow Mixer (IFM) grids in the fuel assembly and (2) the addition of side-supported mixing vanes on both the Mid grids and IFM grids (Reference 7.2).
The new design features of the NGF assembly for thermal improvements have been verified with respect to applicable thermal hydraulics design criteria through testing and analysis. The ABB-TV correlation (Reference 7.3) developed for TURBO fuel was demonstrated to be conservative for the NGF test data. The TURBO fuel does not have all of the design features, such as the IFM grids, as the NGF design. To more accurately reflect the thermal performance of the NGF assembly, a new DNB correlation was developed. This new correlation was entitled WSSV. The WSSV correlation is used with the thermal hydraulic code VIPRE and WSSV-T is used with the TORC thermal hydraulic code (Reference 7.1). This correlation is used in the mixing vane region of the core. The ABB-NV correlation is used to calculate the DNBR values in the hot channels in the non-mixing vane region of the core (Reference 7.3).
The WSSV-T correlation is described in Reference 7.1. The WSSV-T correlation coefficients were derived with the Westinghouse TORC (Reference 7.4) subchannel computer code. As described in Reference 7.1, the WSSV-T correlation is valid for use with the Westinghouse thermal hydraulic codes TORC and CETOP-D.
to 2CAN050901 Page 2 of 7 Specified fuel design limits are not to be exceeded during steady state operation, normal operational transients, and anticipated operating occurrences (AOOs). One of the ways this is accomplished is by having a departure from nucleate boiling (DNB) design basis, which corresponds to a 95% probability at a 95% confidence level (95/95 DNB criterion) that DNB will not occur.
Operation beyond the nucleate boiling regime could result in excessive cladding temperature because of the onset of DNB and the resultant sharp reduction in the heat transfer coefficient.
Because of the steam film, high cladding temperatures may be reached, and a cladding-water (zirconium-water) reaction may take place. This chemical reaction results in oxidation of the fuel cladding to a structurally weaker form. This weaker form may lose its integrity, resulting in an uncontrolled release of activity to the reactor coolant.
DNB is not an observable parameter during reactor operation. The observable parameters of neutron power, reactor coolant flow, temperature, and pressure can be related to DNB through the use of a critical heat flux (CHF) or DNB correlation. The CE-1 (Reference 7.5), ABB-NV (Reference 7.3) and WSSV-T (Reference 7.1) correlations have been developed to predict DNB and the location of DNB for axially uniform and non-uniform heat flux distributions. The CE-1 correlation applies to the CE standard fuel. The ABB-NV correlation applies to both the standard CE fuel and the non-mixing vane regions of the NGF design. The WSSV-T correlation applies to the mixing vane regions of the NGF fuel assembly design. The local DNBR, defined as the ratio of the heat flux that would cause DNB at a particular core location to the actual heat flux, is indicative of the margin to DNB. The minimum value of the DNBR, during steady-state operation, normal operational transients, and AOOs is limited to 1.25 for the CE-1 correlation.
The bounding value for the WSSV-T and the ABB-NV correlations is 1.23. This value includes allowances for the items listed in Table 3-1 of Reference 7.6.
The Reactor Protective System (RPS) is designed to prevent any anticipated combination of transient conditions for Reactor Coolant System (RCS) temperature, pressure, and thermal power level that would result in a violation of the reactor core safety limits.
The Core Protection Calculator System (CPCS) is part of the RPS. It consists of four Core Protection Calculators (CPCs) and two Control Element Assembly Calculators (CEACs). The CPCS initiates the low DNBR and high Local Power Density (LPD) trips of the RPS in order to assure that fuel design limits on DNBR and fuel centerline temperatures are not exceeded during AOOs and to assist the Engineered Safety Features Actuation System (ESFAS) in limiting the consequences of certain postulated accidents. Each CPC channel receives safety grade sensor inputs and uses these inputs to calculate DNBR, LPD, and other parameters. The CEACs receive safety grade Control Element Assembly (CEA) position inputs and provide single CEA position-related factors to each CPC channel such that the CPCs respond appropriately to single CEA-related AOOs which require CPC protection.
The Core Operating Limit Supervisory System (COLSS) is a digital computer based on-line monitoring system that is used to issue alarm signals to the plant computer and to provide information to aid the operator in complying with TS operating limits on DNBR, total core power, peak linear heat rate (LHR), axial shape index (ASI), and azimuthal power tilt.
The CPCS and COLSS include thermal hydraulic algorithms derived from the thermal hydraulic design code CETOP-D. The CPCs continuously calculate DNBR and compare it to a trip setpoint in order to decide whether to issue a trip signal through the RPS. COLSS continuously calculates the DNB power operating limit (POL) and compares it to the calculated power in order to decide whether to issue an alarm signal to the plant computer.
to 2CAN050901 Page 3 of 7 The setpoint analysis is performed every reload cycle in order to calculate addressable constants for the CPCs and COLSS. Addressable constants are coefficients of the CPCs and COLSS algorithms which can be changed readily during startup or operation. Addressable constants include calibration coefficients, measurement results, uncertainty factors, adjustment factors, time delays, and trip setpoints. The primary purpose of the cycle specific setpoint analysis is to calculate the CPCs and COLSS power uncertainty factors, BERR1 and EPOL, respectively, that are used in the DNBR calculations.
Further information with regard to DNB is available in the ANO-2 Safety Analysis Report (SAR),
Section 4.4.2.3.
4.0 TECHNICAL ANALYSIS
ANO-2 currently has a transitional core, a partial core of NGF fuel assemblies and the remaining portion the standard CE fuel design. During this transition, ANO-2 has not taken full advantage of the enhanced operating margin that is present in the NGF design. Following the refueling outage scheduled for the Fall of 2009, ANO-2 will have a complete core of NGF fuel assemblies. It is at this time that the full advantage of the DNB benefit of the mixing vanes, resulting in improved operating margin, will be realized. Since the NGF WSSV-T and ABB-NV DNB correlations will be used in the safety analyses for the reload, the safety limit provided in TS 2.1.1.1 is being updated to be consistent with these NRC-approved models.
The TORC code is used in reloads to perform detailed modeling of the core and hot assembly and to determine minimum DNBR in the hot assembly. The CETOP-D code is used in reload analyses to calculate the minimum DNBR in the hot subchannel. While the TORC code can be applied directly to the reload analyses, typically the TORC code is used to benchmark the CETOP-D DNBR results such that the CETOP-D results are conservative relative to TORC.
The WSSV-T and ABB-NV correlations are in both TORC and CETOP-D. Therefore, the application of WSSV-T and ABB-NV correlations with CETOP-D is equivalent to their application with TORC (Reference 7.1).
The 95 percent confidence level that DNB will not occur is preserved by ensuring that the DNBR remains greater than the DNBR safety limit based on the applicable CHF correlation for the core design. In the development of the applicable DNBR safety limit, uncertainties in the CHF correlation and system parameter uncertainties are statistically combined (References 7.6 and 7.9) to determine a DNBR safety limit. In the case of the NGF assembly design, two CHF correlations are used. As such the bounding value for DNBR determined by using each correlation in the process described above is the DNBR safety limit. This statistical limit protects the respective CHF safety limit. Additional retained thermal margin may also be applied to the statistical DNBR safety limit to yield a higher thermal design limit for use in establishing DNB-based core safety and operating limits. In all cases, application of statistical DNB design methods preserves a 95 percent probability at a 95 percent confidence level that DNB will not occur during normal operation and AOOs.
The DNBR limits for the WSSV-T CHF correlation is 1.12 (Reference 7.1) and 1.13 for the ABB-NV correlation (Reference 7.3). The correlation uncertainties that form the basis for the more limiting value are combined with system parameter uncertainties using the methodology in References 7.6 and 7.9 to yield a DNBR safety limit of 1.23.
to 2CAN050901 Page 4 of 7 This change does not impact the system parameters or the computer code uncertainties. The change in the DNBR limit is due to the CHF correlation used.
The WSSV-T and ABB-NV correlations are used in the safety and setpoint analyses. However, because of existing hardware limitations, the CPC algorithm will retain the CE-1 correlation.
Since the CPC thermal-hydraulic algorithm retains the CE-1 correlation, the DNBR-Low trip setpoint and Allowable Value remains set at 1.25. The CPC power uncertainty factor used in the DNBR calculations (addressable constant BERR1), is calculated using the WSSV-T and ABB-NV correlations in accordance with the setpoint methodology of Reference 7.6. The BERR1 constant is calculated such that a CPC trip at a DNBR of 1.25 using the CE-1 CHF correlation in the CPCs assures that the bounding DNBR safety limit of 1.23 for the WSSV-T and ABB-NV correlations will not be violated during normal operations and AOOs to at least a 95/95 probability / confidence level. Thus, the trip setpoint listed in TS Table 2.2-1 conservatively remains at 1.25 even though credit is being obtained (via the adjusted BERR1 constant) for the improved WSSV-T and ABB-NV correlations and the DNBR limit of 1.23.
Therefore, compliance with 10 CFR 50.36 is maintained, as discussed in Section 5.1 below.
Based on the above, Entergy has determined that the proposed change is acceptable, maintains applicable regulatory requirements, and presents a no significant impact to nuclear or public safety.
5.0 REGULATORY ANALYSIS
5.1 Applicable Regulatory Requirements/Criteria The proposed change has been evaluated to determine whether applicable regulations and requirements continue to be met.
10 CFR 50.36, Technical Specifications, defines a safety limit as a limit upon important process variables that are found to be necessary to reasonably protect the integrity of certain physical barriers that guard against the uncontrolled release of radioactivity.
General Design Criteria (GDC) 10, Reactor Design, requires that specified fuel design limits are not exceeded during steady state operation, normal operational transients, and anticipated operational occurrences (AOOs). This is accomplished by having a departure from nucleate boiling (DNB) design basis, which corresponds to a 95% probability at a 95% confidence level (95/95 DNB criterion) that DNB will not occur.
The revised bounding Departure from Nucleate Boiling Ratio (DNBR) limit for NGF fuel using the WSSV-T and ABB-NV critical heat flux (CHF) correlations continues to meet the requirements for safety limits as defined by 10 CFR 50.36 and maintains the GDC 10 requirements.
10 CFR 50.36 also states A Limiting Safety System Setting is the setting for automatic protective devices related to those variables having significant safety functions. Where a limiting safety system setting is specified for a variable on which a safety limit has been placed, the setting must be so chosen that automatic protective action will correct the abnormal situation before a safety limit is exceeded. The process outlined in Reference 7.7 ensures that the trip setpoint of 1.25 listed in TS Table 2.2-1 will satisfy this requirement.
to 2CAN050901 Page 5 of 7 Based on the considerations discussed in Section 4.0 above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will continue to be conducted in accordance with the site licensing basis, and (3) the approval of the proposed change will not be inimical to the common defense and security or the health and safety of the public.
References 7.1 through 7.6 have been reviewed and approved by the NRC and are part of the current licensing basis for Arkansas Nuclear One, Unit 2 (ANO-2). As such the limits and conditions listed in the safety evaluations for each of these references have previously been addressed by ANO-2. These limits and conditions remain in effect including the one in which a 6% operating margin penalty will be applied until Reference 7.7 has been reviewed and approved by the NRC. The draft NRC Safety Evaluation for this revision is scheduled to be issued no later than October 16, 2009.
In conclusion, Entergy has determined that the proposed change does not require any exemptions or relief from regulatory requirements, other than the TS, and does not affect conformance with any GDC differently than described in the Safety Analysis Report (SAR).
5.2 No Significant Hazards Consideration The proposed change will modify the Departure from Nucleate Boiling Ratio DNBR safety limit of Technical Specification (TS) 2.1.1.1, DNBR, to a lower safety limit value for Arkansas Nuclear One, Unit 2 (ANO-2).
Entergy Operations, Inc. has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, Issuance of amendment, as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
No changes to plant equipment or operating procedures are required due to the change in the safety limit for DNBR. This change does not impact any of the accident initiators.
The analyses of the reload are performed using NRC approved methodologies to ensure the Specified Acceptable Fuel Design Limits (SAFDLs), of which DNBR is one, are not violated. The current DNBR setpoint continues to ensure automatic protective action is initiated to prevent exceeding the proposed DNBR safety limit.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
to 2CAN050901 Page 6 of 7
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not result in any plant modifications or change in the way the plant is designed to function. The proposed change is not associated with any accident precursor or initiator. The proposed change supports the loading and use of Next Generation Fuel (NGF) at ANO-2 as previously approved by the NRC.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The use the NRC-approved NGF WSSV-T correlation with the ABB-NV correlation to establish a new bounding DNBR safety limit of 1.23, preserves the DNBR margin of safety at a 95/95 level. The Core Protection Calculator (CPC) DNBR power adjustment addressable constant BERR1 is calculated based on the WSSV-T and ABB-NV CHF correlations such that a CPC trip at a DNBR of 1.25 using the CE-1 CHF correlation assures that the bounding DNBR safety limit of 1.23 for the WSSV-T and ABB-NV CHF correlations will not be violated during normal operation and AOOs to at least a 95/95 probability / confidence level.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
5.3 Environmental Considerations The proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
to 2CAN050901 Page 7 of 7 6.0 PRECEDENCE In letter dated June 19, 1981, the NRC approved ANO-2 proposed changes in the CHF correlation from the W-3 correlation to the CE-1 correlation and the associated thermal hydraulic methodology beginning in Cycle 2. Both the safety analysis and the CPC / COLSS algorithms were changed to the CE-1 correlation at that time.
Reference 7.8 documents the NRCs approval of the use of the WSSV CHF correlation and the associated thermal hydraulic computer code (VIPRE) with the ABB-NV CHF correlation.
7.0 REFERENCES
7.1 WCAP-16523-P-A, Westinghouse Correlations WSSV and WSSV-T for Predicting Critical Heat Flux in Rod Bundles with Side-Supported Mixing Vanes, August 2007 7.2 WCAP-16500-P-A, CE 16 x 16 Next Generation Fuel Core Reference Report, Revision 0, August 2007 7.3 WCAP-387-P-A, ABB Critical Heat Flux Correlations for PWR Fuel, Revision 000, May 2000 7.4 CENPD-161-P-A, TORC Code - A Computer Code for Determining the Thermal Margin of a Reactor Core, April 1986 7.5 CENPD-162-P-A, C-E Critical Heat Flux, September 1976; Supplement 1-A, February 1977, and CENPD-207-P-A, C-E Critical Heat Flux Part 2 Nonuniform Axial Power Distribution, December 1984 7.6 CEN-356(V)-P-A, Modified Statistical Combination of Uncertainties, Revision 01-P-A, May 1988 7.7 WCAP-16500-P, Supplement 1-P, Revision 1-P, Application of CE Setpoint Methodology for CE 16 x 16 Next Generation Fuel (NGF), October 2008 7.8 NRC Letter to Mr. J. A. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer, Florida Power and Light Company, St. Lucie Plant, Unit No. 2 - Issuance of Amendment Regarding Change in Reload Methodology and Increase in Steam Generator Tube Plugging Limit (TAC NO. MC1566), dated January 31, 2005 7.9 CEN-139(A)-P, Statistical Combination of Uncertainties - Combination of System Parameter Uncertainties in Thermal Margin Analyses for Arkansas Nuclear One Unit 2, November 1980
Attachment 2 2CAN050901 Proposed Technical Specification Changes (mark-up)
2.0 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS 2.1 SAFETY LIMITS 2.1.1 REACTOR CORE DNBR 2.1.1.1 The DNBR of the reactor core shall be maintained 1.231.25.
APPLICABILITY: MODES 1 and 2.
ACTION:
Whenever the DNBR of the reactor core has decreased to less than 1.231.25, be in HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
PEAK FUEL CENTERLINE TEMPERATURE 2.1.1.2 The peak fuel centerline temperature shall be maintained < 5080°F (decreasing by 58°F per 10,000 MWD/MTU for burnup and adjusting for burnable poisons per CENPD-275-P, Revision 1-P-A and CENPD-382-P-A).
APPLICABILITY: MODES 1 and 2.
ACTION:
Whenever the peak fuel centerline temperature has equaled or exceeded 5080°F (decreasing by 58°F per 10,000 MWD/MTU for burnup and adjusting for burnable poisons per CENPD-275-P, Revision 1-P-A and CENPD-382-P-A), be in HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
Attachment 3 2CAN050901 Proposed Technical Specification Bases Changes (mark-up)
For Information
2.1.1 SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS BASES 2.1.1 REACTOR CORE The restrictions of these safety limits prevent overheating of the fuel cladding and possible cladding perforation which would result in the release of fission products to the reactor coolant.
Overheating of the fuel cladding is prevented by (1) restricting fuel operation to within the nucleate boiling regime where the heat transfer coefficient is large and the cladding surface temperature is slightly above the coolant saturation temperature, and (2) maintaining the dynamically adjusted peak linear heat rate of the fuel at or less than 21 kw/ft which will not cause fuel centerline melting in any fuel rod.
First, by operating within the nucleate boiling regime of heat transfer, the heat transfer coefficient is large enough so that the maximum clad surface temperature is only slightly greater than the coolant saturation temperature. The upper boundary of the nucleate boiling regime is termed "departure from nucleate boiling" (DNB). At this point, there is a sharp reduction of the heat transfer coefficient, which would result in higher cladding temperatures and the possibility of cladding failure.
Correlations predict DNB and the location of DNB for axially uniform and non-uniform heat flux distributions. The local DNB ratio (DNBR), defined as the ratio of the predicted DNB heat flux at a particular core location to the actual heat flux at that location, is indicative of the margin to DNB. The minimum value of DNBR during normal operational occurrences is limited to 1.251.23 for the CE-1WSSV-T and ABB-NV correlations and is established as a Safety Limit.
This value is based on a statistical combination of uncertainties. It includes uncertainties in the CHF correlation, allowances for rod bow and hot channel factors (related to fuel manufacturing variations) and allowances for other hot channel calculative uncertainties (CEN-356(V)-P-A, Modified Statistical Combination of Uncertainties, Revision 01-P-A, May 1988).
Second, operation with a peak linear heat rate 21 kw/ft setpoint will ensure that the peak fuel centerline temperature safety limit protects fuel rod and cladding integrity. Above this peak linear heat rate level (i.e., with some melting in the center), fuel rod integrity would be maintained only if the design and operating conditions are appropriate throughout the life of the fuel rods. Volume changes which accompany the solid to liquid phase change are significant and require accommodation. Another consideration involves the redistribution of the fuel which depends on the extent of the melting and the physical state of the fuel rod at the time of melting. Because of the above factors, the steady state value of the peak linear heat rate which would not cause fuel centerline melting is established as a Limiting Safety System Setting. To account for fuel rod dynamics (lags), the directly indicated linear heat rate is dynamically adjusted.
TS 2.1.1.2 establishes a peak fuel centerline temperature of 5080°F with adjustments for burnup and burnable poison. An adjustment for burnup of 58°F per 10,000 MWD/MTU has been established in NRC approved Topical Report CEN-386-P-A, "Verification of the Acceptability of a 1-Pin Burnup Limit of 60 MWD/kgU for Combustion Engineering 16x16 PWR Fuel," August 1992. Adjustments for burnable poisons are established based on NRC approved Topical Reports CENPD-275-P, Revision 1-P-A, CE Methodology for Core Designs Containing Gadolinia-Urania Burnable Absorbers, May 1988 and CENPD-382-P-A, Methodology for Core Designs Containing Erbium Burnable Absorbers, August 1993.
ARKANSAS - UNIT 2 B 2-1 Amendment No. 24,66,138,238 Rev.
SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS BASES DNBR - Low The DNBR - Low trip is provided to prevent the DNBR in the limiting coolant channel in the core from exceeding the fuel design limit in the event of anticipated operational occurrences. The DNBR - Low trip incorporates a low pressurizer pressure floor. At this pressure a DNBR - Low trip will automatically occur. The DNBR is calculated in the CPC utilizing the following information:
- a. Nuclear flux power and axial power distribution from the excore neutron flux monitoring system;
- b. Reactor Coolant System pressure from pressurizer pressure measurement;
- c. Differential temperature (T) power from reactor coolant temperature and coolant flow measurements;
- d. Radial peaking factors from the position measurement for the CEAs;
- e. Reactor coolant mass flow rate from reactor coolant pump speed;
- f. Core inlet temperature from reactor coolant cold leg temperature measurements.
The DNBR, the trip variable, calculated by the CPC incorporates various uncertainties and dynamic compensation routines to assure a trip is initiated prior to violation of fuel design limits.
These uncertainties and dynamic compensation routines ensure that a reactor trip occurs when the actual core DNBR is sufficiently greater than 1.231.25 such that the decrease in actual core DNBR after the trip will not result in a violation of the DNBR Safety Limit.
Since the CPC thermal hydraulic algorithm retains the CE-1 CHF correlation, the DNBR - Low trip setpoint and Allowable Value remain set at 1.25. The CPC DNBR power adjustment addressable constant BERR1 is calculated based on the WSSV-T CHF correlation such that a CPC trip at a DNBR of 1.25 using the CE-1 CHF correlation assures that the DNBR safety limit of 1.23 for the WSSV-T CHF correlation will not be violated during normal operation and anticipated operational occurrences to at least a 95/95 probability/confidence level.
CPC uncertainties related to DNBR cover CPC input measurement uncertainties, algorithm modeling uncertainties, and computer equipment processing uncertainties. Dynamic compensation is provided in the CPC calculations for the effects of coolant transport delays, core heat flux delays (relative to changes in core power), sensor time delays, and protection system equipment time delays.
The DNBR algorithm used in the CPC is valid only within the limits indicated below and operation outside of these limits will result in a CPC initiated trip.
ARKANSAS - UNIT 2 B 2-6 Amendment No. 24,66,79 Rev.