UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 8, 2009 Holders of Licenses for Operating Power Reactors as Listed in
SUBJECT:
RELAXATION OF ORDER FOR COMPENSATORY MEASURES RELATED TO FITNESS-FOR-DUTY ENHANCEMENTS APPLICABLE TO NUCLEAR FACILITY SECURITY FORCE PERSONNEL On April 29, 2003, the U.S. Nuclear Regulatory Commission (NRC) issued Order EA-03-038 modifying the license for your facility to require compliance with specified compensatory measures related to fitness-for-duty (FFD) enhancements applicable to nuclear facility security personnel. Order EA-03-038 states that "all measures implemented or actions taken in response to this Order shall be maintained until the Commission determines otherwise."
On March 31, 2008, the NRC amended Title 10 of the Code of Federal Regulations (10 CFR)
Part 26, "Fitness for Duty Programs," through a final rule published in the Federal Register on March 31, 2008 (73 FR 17176) to strengthen the effectiveness of licensee FFD programs and to establish clear and enforceable requirements for the management of worker fatigue (including security personnel). The rule became effective on April 30, 2008. However, licensees and other applicable entities could defer implementation of Part 26, Subpart I, "Managing Fatigue,"
requirements to a date no later than October 1, 2009. The staff notes that some licensees have indicated a desire to implement the Subpart I provisions prior to October 1, 2009.
As described in Section IV.D of the Statement of Considerations for the final rule, the NRC evaluated the compensatory measures required by Order EA-03-038 against the requirements of the rule. The NRC found that the provisions of Part 26, Subpart I, specified for security force personnel would replace the requirements imposed by the Order. Furthermore, the !\\IRC recognized that Order EA-03-038 would need to be relaxed (i.e., removed from being a requirement) prior to licensee implementation of the rule in part because of some conflicting terminology and work-hour calculation methods between the Order and the rule.
In light of the above determination, licensees will not be required to comply with the requirements of Order EA-03-038 for security force personnel in the following circumstances:
For each licensee that implements all of the requirements of 10 CFR Part 26, Subpart I, prior to October 1, 2009, and submits a letter to the NRC under 10 CFR 50.4 that affirms the licensee's implementation of the Part 26, Subpart I requirements, the NRC will find that good cause is shown and I hereby relax Order EA-03-038 in its entirety for that licensee as of the date of the licensee's letter.
For each licensee that did not submit the above 10 CFR 50.4 letter, I hereby relax the requirements of Order EA-03-038 in its entirety on October 1, 2009, because that licensee is subject to the 10 CFR Part 26, Subpart I requirements as of that date.
Holders of Licenses for Operating Power Reactors
-2 Licensees should consider whether relaxation of the Order will result in changes to their licenses and Security Plans. Please contact your licensing project manager to facilitate resolution of any issue related to the requirements outlined in this letter, or if you have any other questions.
Sincerely, ic J. Leeds, Director Office of Nuclear Reactor Regulation Docket Nos. As shown in Addressee List
Enclosure:
Addressee List cc: w/encl: Listserve
ADDRESSEE LIST Facilities Arkansas Nuclear One, Units 1 and 2 Docket Nos. 50-513 &50-368 License Nos. DPR 51, NPF-6 Beaver Valley Power Station, Unit Nos. 1 and 2 Docket Nos. 50-334 412 License Nos. DPR-66, NPF-73 Byron Station, Unit Nos. 1 and 2 Docket Nos. STN 50-454, STN 50-455 License Nos. NPF-37, NPF-66 Braidwood Station, Units 1 and 2 Docket Nos. STN 50-456 & STN 50-457 License Nos. NPF-72, NPF-73 1----------------------1 Clinton Power Station, Unit NO.1 Docket No. 50-461 License No. NPF-62 Dresden Nuclear Power Station, Units 2 and 3 Docket Nos. 50-237, 50-249 License Nos. DPR-19, DPR-25 LaSalle County Station, Units 1 and 2 Docket Nos. 50-373, 50-374 License Nos. NPF-11, NPF-18 Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50-254, 50-265 License Nos. DPR-29, DPR-30 Addressee Vice President, Operations Entergy Operations, Inc.
Arkansas Nuclear One 1448 S.R. 333 Russellville, AR 72802 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Mr. Charles G Pardee President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 Oyster Creek Nuclear Generating Station Docket Nos. 50-219 License Nos. DPR-16 Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Three Mile Island Nuclear Station, Unit 1 Docket Nos. 50-289 License Nos. DPR-50 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Mr. Karl W. Singer Docket Nos. 50-259, 50-260, & 50-296 Chief Nuclear Officer and License Nos. DPR-33, DPR-52, DPR-68 Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Sequoyah Nuclear Plant, Units 1 and 2 Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Mr. William R. Campbell, Jr.
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Watts Bar Nuclear Plant, Unit 1 Docket No. 50-390 License No. NPF-90 Brunswick Steam Electric Plant, Units 1 and 2 Mr. Benjamin Waldrep, Vice President Docket Nos. 50-424, 50-425 Brunswick Steam Electric Plant License Nos. DPR-71, DPR-62 Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461 Callaway Plant, Unit1 Mr. Adam C. Heflin Docket No. 50-483 Senior Vice President and License No. NPF-30 Chief Nuclear Officer Callaway Union Electric Company P.O. Box 620 Fulton, MO 65251
-2
Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Catawba Nuclear Station, Units 1 and 2 Mr. J. R. Morris Dockets Nos. 50-413, 50-414 Site Vice President License Nos. NPF-35, NPF-52 Catawba Nuclear Station Duke Energy Carolinas, LLC 4800 Concord Road York, SC 29745 Columbia Generating Station Mr. J. V. Parrish, Chief Executive Officer Docket No. 50-397 Energy Northwest License No. NPF-21 P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968 Comanche Peak Steam Electric Station, Units 1 Mr. Rafael Flores and 2 Senior Vice President & Chief Nuclear Docket Nos. 50-445, 50-446 Officer License Nos. NPF-87, NPF-89 Luminant Generation Company LLC P. O. Box 1002 Glen Rose, TX 76043 Cooper Nuclear Station Mr. Stewart B. Minahan Docket No. 50-298 Vice President-Nuclear and Chief License No. DPR-46 Nuclear Officer Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 Crystal River Unit 3 Nuclear Generating Plant Mr. Dale E. Young, Vice President Docket No. 50-302 Crystal River Nuclear Plant (!\\IA'I B)
License No. DPR-72 ATTN: Supervisor, Licensing &
Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708 Davis-Besse Nuclear Power Station, Unit NO.1 Docket No. 50-346 License No. NPF-3 Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
-3
Diablo Canyon Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-275 & 50-323 License Nos. DPR-80 & DPR-82 Mr. John T. Conway Senior Vice President -Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3, Mail Code 104/6/601 Avila Beach, CA 93424 Donald C. Cook Nuclear Plant, Units 1 and 2 Docket Nos. 50-315 & 50-316 License Nos. DPR-58 & DPR-74 Mr. Michael W. Rencheck Senior Vice President and Chief Nuclear Officer (DC Cook)
Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 Duane Arnold Energy Center Docket No. 50-331 License No. DPR-49 Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Edwin I. Hatch Nuclear Plant, Units 1 and 2 Docket Nos. 50-321 & 50-366 License Nos. DPR-57 & NPF-5 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 Fermi, Unit 2 Mr. Jack M. Davis Docket No. 50-341 Senior Vice President and Chief Nuclear License No. NPF-43 Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166 Fort Calhoun Station, Unit 1 Mr. David J. Bannister Docket No. 50-285 Vice President and CNO License No. DPR-40 Omaha Public Power District Fort Calhoun Station.
444 South 16th Street Mall Omaha, NE 68102-2247 Grand Gulf Nuclear Station, Unit 1 Vice President, Operations Docket No. 50-416 Entergy Operations, Inc.
License No. NPF-29 Grand Gulf Nuclear Station P. O. Box 756 Port Gibson, MS 39150
-4
H. B. Robinson Steam Electric Plant, Unit 2 Docket No. 50-261 License No. DPR-23 Mr. Thomas D. Walt, Vice President Carolina Power & Light Company H. B. Robinson Steam Electric Plant Unit NO.2 3581 West Entrance Road Hartsville, South Carolina 29550 Hope Creek Generating Station Docket Nos. 50-354 License Nos. NPF-57 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear (Hope Creek & Salem) f--------------------l P.O. Box 236, N09 Salem Nuclear Generating Station, Unit Nos. 1 and Hancocks Bridge, NJ 08038 2
Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 Indian Point Nuclear Generating, Unit Nos. 2 and 3
Docket Nos. 50-247, 50-286 License Nos. DPR-26, DPR-64 James A. Fitzpatrick Nuclear Power Plant Docket Nos. 50-333 License Nos. DPR-59 Pilgrim Nuclear Power Station Docket Nos. 50-293 License Nos. DPR-35 Vermont Yankee Nuclear Power Station Docket Nos. 50-271 License Nos. DPR-28 Joseph M. Farley Nuclear Plant, Units 1 and 2 Docket Nos. 50-348 & 50-364 License Nos. NPF-2 & NPF-8 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Vice President, Operations Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon, VT 05354 Mr. J. Randy Johnson Vice President - Farley Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319
-5
Kewaunee Power Station Docket Nos. 50-305 License Nos. DPR-43 Mr. David A. Christian President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center Millstone Power Station, Unit Nos. 2 and 3 5000 Dominion Boulevard Docket Nos. 50-336, 50-423 Glen Allen, VA 23060-6711 License Nos. DPR-65, NPF-49 North Anna Power Station, Units 1 and 2 Docket Nos. 50-338, 50-339 License Nos. NPF-4, NPF-7 Surry Power Station, Units 1 and 2 Docket Nos. 50-280,50-281 License Nos. DPR-32, DPR-37 McGuire Nuclear Station, Units 1 and 2 Mr. Bruce H. Hamilton Docket Nos. 50-369 & 50-370 Vice President License Nos. NPF-9 & NPF-17 McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078 Monticello Nuclear Generating Plant, Unit NO.1 Docket No. 50-263 License No. DPR-22 Mr. Timothy J. O'Connor, Site Vice President Monticello Nuclear Generating Plant Northern States Power - Minnesota 2807 West County Road 75 Monticello, MN 55362-9637 Nine Mile Point Nuclear Station, Mr. Keith J. Polson Units 1 and 2 Vice President, Nine Mile Point Docket Nos. 50-220 & 50-410 Nine Mile Point Nuclear Station, LLC License Nos. DPR-63 & NPF-69 P. O. Box 63 Lycoming, NY 13093-0063 Oconee Nuclear Station, Units 1, 2, and 3 Mr. Dave Baxter Docket Nos. 50-269, 50-270, & 50-287 Vice President, Oconee Site License Nos. DPR-38, DPR-47, & DPR-55 Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Palisades Nuclear Plant Vice President, Operations Docket No. 50-255 Entergy Nuclear Operations, Inc.
License NO.DPR-20 Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
-6
Palo Verde Nuclear Generating Station, Units 1, 2 Mr. Randall K. Edington and 3 Executive Vice President Nuclear/CNO Docket Nos. 50-528, 50-529, & 50-530 Mail Station 7602 License Nos. NPF-41, NPF-51, & NPF-74 Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072-2034 Perry Nuclear Power Plant, Unit No. 1 Mr. Barry S. Allen Docket No. 50-440 Site Vice President License No. NPF-58 FirstEnergy Nuclear Operating Company Mail Stop: A-PY-A290 P. O. Box 97 10 Center Road Perry, OH 44081-0097 Point Beach Nuclear Plant, Units 1 and 2 Mr. Larry Meyer Docket Nos. 50-266 & 50-301 Site Vice President License Nos. DPR-24 & DPR-27 Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241-9516 Prairie Island Nuclear Generating Plant, Mr. Michael D. Wadley Units 1 and 2 Site Vice President Docket Nos. 50-282 & 50-306 Prairie Island Nuclear Generating Plant License Nos. DPR-42 & DPR-60 Northern States Power Co. - Minnesota 1717 Wakonade Drive East Welch, MN 55089 R. E. Ginna Nuclear Power Plant Mr. John T. Carlin, Vice President Docket No. 50-244 R. E. Ginna Nuclear Power Plant, LLC License No. DPR-18 1503 Lake Road Ontario, NY 14519-9364 River Bend Station, Unit 1 Vice President - Operations Docket No. 50-458 Entergy Operations, Inc.
License No. NPF-47 River Bend Station 5485 US Highway 61 N St. Francisville, LA 70775 San Onofre Nuclear Generating Station, Units 2 and 3 Docket Nos. 50-361 & 50-362 License Nos. NPF-10 & NPF-15 Mr. Ross T. Ridenoure Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O.Box128 San Clemente, CA 92674-0128
-7
Seabrook Station, Unit 1 Mr. Gene St. Pierre Docket No. 50-443 Site Vice President, License No. I\\lPF-86 Seabrook Station NextEra Energy Seabrook, LLC P. O. Box 300 Seabrook, NH 03874 Shearon Harris Nuclear Power Plant, Unit 1 Mr. Chris L. Burton Docket No. 50-400 Vice President License No. NPF-63 Shearon Harris Nuclear Power Plant Carolina Power & Light Company P. O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165 South Texas Project, Units 1 and 2 Mr. Edward D. Halpin Docket Nos. 50-498 & 50-499 Chief Nuclear Officer License Nos. NPF-76 & NPF-80 STP Nuclear Operating Company South Texas Project P. O. Box 289 Wadsworth, TX 77483 St. Lucie Nuclear Plant, Units 1 and 2 Mr. J. A. Stall Docket Nos. 50-335, 50-389 Senior Vice President, Nuclear License Nos. DPR-67, NPF-16 and Chief Nuclear Officer Florida Power and Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 Turkey Point Nuclear Plant, Units 3 and 4 Mr. Mano Nazar Docket Nos. 50-250, 50-251 Senior Vice President and Nuclear Chief License Nos., DPR-31, DPR-41 Operating Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Susquehanna Steam Electric Station, Units 1 and Mr. William H. Spence 2
Executive Vice President/Chief Docket Nos. 50-387 & 50-388 Operating Officer License Nos. NPF-14 & NPF-22 Chief Nuclear Officer PPL Susquehanna, LLC Two North Ninth Street, GENTW16 Allentown, PA 18101-1179 Virgil C. Summer Nuclear Station Docket No. 50-395 License No. NPF-12 Mr. Jeffrey B. Archie Vice President, Nuclear Operations South Carolina Electric and Gas Company P. O. Box 88 Jenkinsville, SC 29065
-8
Vogtle Electric Generating Plant, Units 1 and 2 Docket Nos. 50-424 & 50-425 License Nos. NPF-68 & NPF-81 Mr. Tom E. Tynan Vice President - Vogtle Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 Waterford Steam Electric Station, Unit 3 Vice President, Operations Docket No. 50-382 Entergy Operations, Inc.
License No. NPF-38 Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 Wolf Creek Generating Station Docket No. 50-482 License No. NPF-42 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P. O. Box 411 Burlington, KS 66839
-9
Holders of Licenses for Operating Power Reactors
-2 Licensees should consider whether relaxation of the Order will result in changes to their licenses and Security Plans. Please contact your licensing project manager to facilitate resolution of any issue related to the requirements outlined in this letter, or if you have any other questions.
Sincerely, IRA by JWiggins fori Eric J. Leeds, Director Office of Nuclear Reactor Regulation Docket Nos. As shown in Addressee List
Enclosure:
Addressee List cc: w/encl: Listserve ADAMS Accession NO.: ML091060582 OFFICE NSIRIDSP/ISCPB I
QTE NSIRIDSP/ISCPB NSIRIDSP/ISCPB I NSIRIDSP NAME MRalph/byEmail K Azariah-O-Kribbs PHarris CErlanger S.Morris for/RCorreia DATE 04116/2009 413012009 5/1109 5/4/09 5/4/09 OFFICE OGC - NLO OE NRRIDLR II NRRIDORL NSIR NAME CMarco I
CCarpenter T
.r-:
II JGiitter RZimmerman DATE 5/18/09 5/21/09 5/20109 5/19/09 5/26/09 OFFICE NRRlADRO NRR NAME BBoger JWiggins for ELeeds DATE 6/08/09 6/08/09 OFFICIAL RECORD COPY