R.E. Ginna, Request for Extension of Response to January 07, 2009 Request for Additional Information Regarding Supplementary Responses to NRC Generic Letter (GL) 2004-02
ML090930689
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/30/2009
From: John Carlin
Constellation Energy Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-04-002, TAC MC4687, WPLNRC-1002117
Download: ML090930689 (5)


Text

John Carlin Site Vice President R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 585.771.5200 585.771.3943 Fax John.carlin

@constellation.com Constellat on Energy Nuclear Generation Group U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk March 30, 2009

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Request for Extension of Response to ,january 07, 2009 Request for Additional Information (RAI) Regarding R.E. Ginna Nuclear Power Plant LLC's Supplementary Responses to NRC Generic Letter (GL) 2004-02

REFERENCES:

(a) Letter from Douglas Pickett (NRC) to John Carlin (Ginna LLC), dated January 7,2009, REQUEST FOR ADDITIONAL INFORMATION RE: SUPPLEMENTAL RESPONSE TO GENERIC LETTER 2004-02, "POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY RECIRCULATION DURING DESIGN BASIS ACCIDENTS AT PRESSURIZED WATER REACTORS" -R.E. GINNA NUCLEAR POWER PLANT (TAC NO. MC4687)(b) Letter from John Carlin (Ginna LLC) to Document Control Desk (NRC) dated July 25, 2008, Second Supplementary Response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors" Pursuant to the January 7, 2009 Request for Additional Information (RAI) (Reference a), R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC) is providing a schedule update and a request for extension for the RAI responses.

This letter will outline Ginna LLC's future plans to resolve reviewer concerns with the site's GL 2004-02 supplemental responses.

In February of 2008 Ginna LLC completed sump strainer thin bed testing using a process that added portions of fiber fines followed by the addition of particulate.

In March 2008, a document titled "NRC Staff Review Guidance Regarding Generic Letter 2004-02 Closure in the Area of Head Loss and Vortexing" was issued. This document contained the expectation that debris would be added to test loops in a particular order -specifically, particulate would be added to the test loop followed by the addition of portions of fiber fines. Ginna LLC is currently reperforming thin bed testing, strictly adhering to NRC guidance.

Ginna LLC completed the installation of all planned sump modifications during the spring 2008 refueling outage.By letter of January 7, 2009, the NRC forwarded a request for additional information regarding Ginna LLC's supplemental responses, the last of which was dated July 25, 2008 (Reference b). In the same RAI letter, the NRC indicated that it would like one response letter from Ginna LLC answering all the RAI questions, and gave a 90-day response date. The NRC further indicated that, should an extension beyond 90 days be required, the basis for that extension should be provided.

Document Control Desk March 30, 2009 Page 2 Ginna LLC has reviewed the RAI and concluded that, in light of the new testing, an extension to the 90 day response period is needed. In order to complete the testing and associated analysis, Ginna LLC is requesting a new RAI response completion date of June 5, 2009. Attachment 1 provides the regulatory commitment made in this letter.If there are any questions or if additional information is require, please contact Mr. David Wilson at (585) 771-5219 or at David.F.Wilson@Constellation.corn Document Control Desk March 30, 2009 Page 3 STATE OF NEW YORK TO WIT: COUNTY OF WAYNE I, John Carlin, being duly sworn, state that I am Site Vice President, R.E. Ginna Nuclear Power Plant, LLC (Ginna LLC), and that I am duly authorized to execute and file this request on behalf of Ginna LLC. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Ginna LLC employees and/or consultants.

Such information has been reviewed in accordance with company practice and I believe it to be reliable.,scribed and sworn before me, a Notary Public in and for the State of New York and County of toinr , this day of ,2009.,,,,.

...an WITNESS my Hand and Notarial Seal: Notary Public--SHARON L. MILLER-My Commission Expires: Notary Public, State of New York Registration No. 01M l60177 ,8 *,r,.,' , Monroe County Commission Expires December 21,20/L0 Date Attachments:

(1) List of Regulatory Commitments cc: S. J. Collins, NRC D. V. Pickett Resident Inspector, NRC (Ginna)P. D. Eddy, NYSDPS J. P. Spath, NYSERDA ATTACHMENT 1 List of Regulatory Commitments ATTACHMENT 1 List of Regulatory Commitments The following table identifies those actions committed to by Ginna LLC in this document.

Any other statements made in this licensing submittal are provided for informational purposes only and are not to be considered regulatory commitments.

Please direct any questions you have in this matter to Mr.*David Wilson at (585)771-5219.

COMMITMENT COMPLETION DATE Ginna LLC will submit a June 5, 2009 response to the January 7, 2009 NRC Request for Additional Information regarding GL 2004-02 no later than June 5, 2009.