ML090910522

From kanterella
Jump to navigation Jump to search

E-mail: Application Accepted - Prairie Island Units 1 and 2 LAR to Apply Surveillance Requirement (SR) 3.0.2 Interval Extension to SR 3.8.1.8
ML090910522
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 03/31/2009
From: Thomas Wengert
Plant Licensing Branch III
To: Vincent D
Northern States Power Co, Xcel Energy
References
TAC ME0811, TAC ME0812
Download: ML090910522 (3)


Text

From: Thomas Wengert Sent: Tuesday, March 31, 2009 4:14 PM To: 'Vincent, Dale M.'

Cc: Vijay Goel; George Wilson; Abraham Marrero; Gerald Waig; Robert Elliott; Lois James

Subject:

Application Accepted - Prairie Island Units 1 and 2 LAR to Apply Surveillance Requirement (SR) 3.0.2 Interval Extension to SR 3.8.1.8 (TAC Nos. ME0811 and ME0812)

Mr. Vincent, By letter dated March 5, 2009, Northern States Power Company - Minnesota (NSPM), doing business as Xcel Energy, submitted a license amendment request for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2 (ADAMS Accession Number ML090641102). The requested amendment proposes to change the facility technical specifications (TSs) to revise TS 3.8.1, "AC Sources - Operating," SR 3.8.1.8 Frequency to allow use of the SR 3.0.2 interval extension (1.25 times the specified 24 month frequency).

The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TS) must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of the technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me.

Regards, Tom Wengert USNRC Project Manager NRR/DORL/LPLIII-1 (301) 415-4037

E-mail Properties Mail Envelope Properties ()

Subject:

Application Accepted - Prairie Island Units 1 and 2 LAR to Apply Surveillance Requirement (SR) 3.0.2 Interval Extension to SR 3.8.1.8 (TAC Nos. ME0811 and ME0812)

Sent Date: 3/31/2009 4:01:52 PM Received Date: 3/31/2009 4:14:00 PM From: Thomas Wengert Created By: Thomas.Wengert@nrc.gov Recipients:

Dale.Vincent@xenuclear.com ('Vincent, Dale M.')

Tracking Status: None Vijay.Goel@nrc.gov (Vijay Goel)

Tracking Status: None George.Wilson@nrc.gov (George Wilson)

Tracking Status: None Abraham.Marrero@nrc.gov (Abraham Marrero)

Tracking Status: None Gerald.Waig@nrc.gov (Gerald Waig)

Tracking Status: None Robert.Elliott@nrc.gov (Robert Elliott)

Tracking Status: None Lois.James@nrc.gov (Lois James)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 15863 3/31/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: