UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 August 18, 2009 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota 1717 Wakonade Drive East Welch, MN 55089
SUBJECT:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO APPLY SURVEILLANCE REQUIREMENT (SR) 3.0.2 INTERVAL EXTENSION TO SR 3.8.1.8 (TAC NOS. ME0811 AND ME0812)
Dear Mr. Wadley:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated March 5, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML090641102), as supplemented by letter dated April 13,2009 (ADAMS Accession No. ML091040679), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, submitted a request for Technical Specification (TS) changes to revise TS 3.8.1, "AC Sources - Operating,"
SR 3.8.1.8 Frequency to allow the use of SR 3.0.2 interval extension (1.25 times the specified 24 month Frequency) for the Prairie Island Nuclear Generating Plant, Units 1 and 2.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on August 11, 2009, it was agreed that you would provide a response by September 25, 2009.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.
Sincerely,
~o-~~T;G:""o4-Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DOCKET NOS. 50-282 AND 50-306 In reviewing the Northern States Power Company - Minnesota (doing business as Xcel Energy),
submittal, dated March 5, 2009 (Agencywide Documents Access and Management System Accession No. ML090641102), as supplemented by letter dated April 13, 2009 (ADAMS Accession No. ML091040679), which requested technical specification (TS) changes to revise TS 3.8.1, "AC Sources - Operating," SR 3.8.1.8 Frequency to allow the use of the SR 3.0.2 interval extension (1.25 times the specified 24 month Frequency) for Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP), the U.S. Nuclear Regulatory Commission (NRC) staff has determined that the following information is needed in order to complete its review:
- 1.
According to SR 3.8.1.8.c of the PINGP TSs, the ground fault trip is not bypassed on an actual or simulated safety injection signal, in Unit 1 only. Explain the difference between Unit 1 and Unit 2 regarding this trip and provide the basis for not bypassing the ground fault trip for Unit 1.
- 2.
Submit for the NRC staff's review, the applicable portions of representative procedures for performing SR 3.8.1.8 and relevant representative drawings showing the relays that provide the function to bypass the emergency diesel generator non-critical automatic trips on an actual or simulated safety injection signal. Also, discuss whether critical trips are tested as part of SR 3.8.1.8 or some other plant procedure.
Enclosure
ML091040679), Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy, submitted a request for Technical Specification (TS) changes to revise TS 3.8.1, "AC Sources - Operating,"
SR 3.8.1.8 Frequency to allow the use of SR 3.0.2 interval extension (1.25 times the specified 24 month Frequency) for the Prairie Island Nuclear Generating Plant, Units 1 and 2.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on August 11, 2009, it was agreed that you would provide a response by September 25, 2009.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-4037.
Sincerely, IRA!
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-282 and 50-306
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 RtF RidsNrrDorlLpl3-1 Resource RidsNRRPMPrairielsland Resource RidsNrrLABTully Resource RidsNrrDeEeeb Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource VGoel, NRR RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource ADAMS Accession No ML092250428
'via memo dated 7/23/09 OFFICE LPL3-1/PM LPL3-1/LA NRRtDE/EEEB/BC LPL3-1/BC NAME TWenger!
BTuily fTHarris for GWilson' LJames DATE 08/17/09 08/14/09 07/23/09 08/18/09