ML090820622
| ML090820622 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/23/2009 |
| From: | Peter Bamford Plant Licensing Branch 1 |
| To: | Tom Loomis Exelon Corp |
| Bamford, Peter J., NRR/DORL 415-2833 | |
| References | |
| Download: ML090820622 (1) | |
Text
From:
Peter Bamford Sent:
Monday, March 23, 2009 4:08 PM To:
'thomas.loomis@exeloncorp.com'
Subject:
Acceptance of Limerick TACs ME0740/0741, Removal of TS 3/4.4.8 By letter dated February 25, 2009, Exelon Generation Company, LLC submitted a license amendment for Limerick Units 1 and 2, proposing to remove the requirements listed in technical specification 3/4.4.8, reactor coolant system structural integrity requirements The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Peter Bamford NRR/DORL/LPL 1-2 Limerick & TMI-1 Project Manager 301-415-2833 E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance of Limerick TACs ME0740/0741, Removal of TS 3/4.4.8 Sent Date: 3/23/2009 3:44:45 PM Received Date: 3/23/2009 4:07:00 PM From: Peter Bamford Created By: Peter.Bamford@nrc.gov Recipients:
thomas.loomis@exeloncorp.com ('thomas.loomis@exeloncorp.com')
Tracking Status: None Thomas.McLellan@nrc.gov (Thomas McLellan)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 10089 3/23/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: