|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261January15,2009U.S.NuclearRegulatoryCommissionAttention:DocumentControlDeskOneWhiteFlintNorth11555RockvillePikeRockville,MD20852-2738SerialNo.NLOS/ETSDocketNo.LicenseNo.
08-0013F RO 50-339 NPF-7 VIRGINIA ELECTRICANDPOWER COMPANY (DOMINION)
NORTH ANNA POWER STATIONUNIT2 SUPPLEMENTAL RESPONSETONRC GENERIC LETTER 2008-01, MANAGING GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS-INACCESSIBLE AREASTheNuclearRegulatoryCommission(NRC)issuedGenericLetter(GL)2008-01on January11,2008,torequestthateachlicenseeevaluatethelicensingbasis,design,testing,andcorrectiveactionprogramsfortheEmergencyCoreCoolingSystems(ECCS),ResidualHeatRemoval(RHR)System,andContainmentSpray(CS)Systemtoensurethatgasaccumulationismaintainedlessthantheamountthatcouldchallengeoperabilityofthesesystems,andthatappropriateactionistakenwhenconditionsadversetoqualityareidentified.InanOctober14,2008letter(SerialNo.08-0013B),DominionprovidedtheinformationrequestedinGL 2008-01forSurryandNorthAnnaPowerStations.However,asidentifiedinourMay7,2008letter(SerialNo.08-0013A),Dominionprovidedanalternatescheduleforthecompletionofthewalkdownsand evaluationsoftheinaccessibleportionsoftheECCSandSpraySystemsinsidecontainment.Specifically,DominioncommittedtoprovidethisinformationbyJanuary15,2009forNorthAnnaUnit2andJuly15,2009forNorthAnnaUnit1.TheNRCapprovedthecompletionschedulevialetterdatedJuly23,2008.Insummary,Dominionhasconcludedthat:1)theECCS,RHRand containment spraysystemsatNorthAnnaPowerStationUnit2areincompliancewiththeirTSdefinitionsofoperability,i.e.,capableofperformingtheirintendedsafetyfunctions,and2)NorthAnnaPowerStationisincompliancewith10CFR50,AppendixB,CriterionIII,V,XI,XVI,andXVII,withrespecttotheconcernsoutlinedinGL2008-01regardinggasaccumulationintheapplicablesystems.
SerialNo.08-0013FDocketNo.50-339Page2of3Theattachmenttothisletterprovidestheresultsofthewalkdownand evaluationsoftheinaccessibleportionoftheECCSinsidecontainmentforNorthAnnaPowerStationUnit2.PleasecontactMr.ThomasShaubat(804)273-2763ifyouhaveany questions orrequireadditionalinformation.
Sincerely,WilliamR.MatthewsSeniorVicePresident-NuclearOperations COMMONWEALTHOFVIRGINIAVICKIL.HULL Notary Public l Commonwealth of VirginiaMy Commission Expires May31.2010-----------------COUNTYOFHENRICOTheforegoingdocumentwasacknowledgedbeforeme,inandfortheCountyand Commonwealthaforesaid,todaybyWilliam R.Matthews,whoisSeniorVicePresident-Nuclear OperationsofVirginiaElectricandPowerCompany.Hehasaffirmedbeforemethatheisdulyauthorizedtoexecuteandfilethe foregoing documentinbehalfofthatcompany,andthatthestatementsinthedocumentaretruetothebestofhisknowledqeandbelief.
/J Acknowledgedbeforemethis
/5??'day of 11 1iM/M2009.MyCommissionExpires::3 J I dOlONotaryPublicCommitmentsmadeinthisletter:None
Attachment:
SupplementalResponsetoGL 2008-01-NorthAnnaPowerStationUnit2 cc:U.S.NuclearRegulatoryCommissionRegionIISamNunn AtlantaFederalCenter 61ForsythStreet,S.W.,Suite23T85Atlanta,GA30303-8931 NRC SeniorResidentInspectorNorthAnnaPowerStationMr.J.E.Reasor,Jr.OldDominionElectricCooperative InnsbrookCorporateCenter4201DominionBlvd.Suite300GlenAllen,Virginia23060Mr.J.F.Stang,Jr.NRCProjectManagerU.S.NuclearRegulatoryCommissionOneWhiteFlintNorthMaiIStop 08-G9A11555RockvillePikeRockville,MD20852-2738Ms.D.N.WrightNRCProjectManagerU.S.NuclearRegulatoryCommissionOneWhiteFlintNorthMailStop 08-H4A11555RockvillePikeRockville,MD20852-2738SerialNo.08-0013FDocketNo.50-339Page3of3 ATTACHMENT NORTHANNAPOWER STATIONUNIT2 SUPPLEMENTAL RESPONSETOGL2008-01 VIRGINIA ELECTRICANDPOWER COMPANY (DOMINION)SerialNo.08-0013FDocketNo.50-339 SerialNo.08-0013FDocketNo.50-339Page1of2NorthAnnaUnit2Nine-MonthSupplementalResponsetoNRCGenericLetter2008-01Thisattachmentprovidesthenine-monthSupplementalResponsetoGenericLetter 2008-01foractionsthatweredeferreduntilthenextrefuelingoutageforNorthAnnaUnit2asrequestedbyDominioninaMay8,2008letter(SerialNo.08-0013A)andapprovedbytheNRGinaJuly23,2008letter.TheoriginalconclusionsdocumentedinNorthAnnaUnits1and2nine-monthresponsewithrespecttothelicensingbasisevaluation,testingevaluations,andcorrectiveactionevaluationshavenotchangedforNorthAnnaUnit2.ThissupplementprovidestheresultsofdesignevaluationreviewsconductedduringtherecentUnit2refuelingoutageassociatedwithwalkdownsofpreviouslyuncompleted activities.A.EVALUATIONRESULTS1.DesignBasisDocumentsNochangestolicensingordesignbasishavebeenidentifiedasaresultoftheconfirmatoryinspectionorwalkdownsperformedduringtheNorthAnnaUnit2refuelingoutage.
2.Confirmatory Walkdownsa.TheLowHeadSafetyInjectioncoldlegpipinginsidecontainmentwaslaserscannedanddetailedisometricsprepared.Aslopereportwasdevelopedtoidentifyhighpointsinthepiping.Eachidentifiedhighpointofgreaterthan1degreewasevaluatedforpotentialgasaccumulation.Theevaluatedhighpointsdidnotexceedpreviouslydeterminedacceptancecriteriadevelopedforthisdischargepiping.b.Ventingwasperformedatthesystempipinghighpointsoutsideofcontainmentinaccordancewithexistingstationproceduresforeach EGGSsystempipingtrainuponreturntoservice.Subsequentfullflowtestingandsystemflowsweepingwasperformedinaccordancewithexistingstationprocedurestoperformdynamicventingofthesystempipinghighpointsbothoutsideandinsideofcontainmentforeach EGGSsystempipingtrain.3.VentValvesNonewventvalvelocationsormodificationstoexistingventvalveshavebeenidentifiedbytheconfirmatoryinspectionorwalkdown.
SerialNo.08-0013FDocketNo.50-339Page2of2 4.ProceduresNoprocedurerevisionshavebeenidentifiedbytheconfirmatoryinspectionor walkdown.B.DESCRIPTION OF NECESSARY ADDITIONAL CORRECTIVE ACTIONS 1.Additional Corrective ActionsNoadditionalcorrectiveactionsarerequiredasaresultoftheconfirmatoryinspectionorwalkdown.
2.Corrective Action UpdatesNochangeshavebeenmadetothepreviouscorrectiveactionsidentifiedinSectionCofAttachment2toDominion'sOctober14,2008letter(SerialNo.
08-00138).
ConclusionDominionhasevaluatedthepreviouslyunevaluatedportionsoftheapplicablesystemsatNorthAnnaUnit2thatperformthefunctionsdescribedintheGenericLetter2008-01andhasconcludedthatthesesystemsareoperable.TheoriginalconclusionsdocumentedinDominion'sresponsedatedOctober14,2008withrespecttothelicensingbasisevaluation,testingevaluations,andcorrectiveactionevaluationshavenotchanged.