MONTHYEARL-PI-08-022, Prairie Lsland, Units 1 and 2, Annual Report of Personnel Radiation Exposure2008-04-11011 April 2008 Prairie Lsland, Units 1 and 2, Annual Report of Personnel Radiation Exposure Project stage: Request ML0829506042008-10-23023 October 2008 RAI Re the Analysis of Severe Accident Mitigation Alternatives for Prairie Island Nuclear Generating Plant, Units 1 and 2 Project stage: RAI ML0829505512008-10-23023 October 2008 Review of the Prairie Island Nuclear Generating Plant Units 1 & 2, License Renewal Application (Tac Nos. MD8513 and MD8514) Project stage: Approval ML0829708182008-11-0404 November 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant Units 1 & 2, License Renewal Application Project stage: RAI ML0828309472008-11-0505 November 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant Units 1 & 2, License Renewal Application Project stage: RAI ML0832400322008-11-19019 November 2008 Request for Additional Information License Renewal Application, Prairie Island Nuclear Generating Plant, Units 1 & 2 Project stage: RAI ML0830105852008-11-19019 November 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application Project stage: RAI ML0831803942008-11-19019 November 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application Project stage: RAI ML0831809622008-11-20020 November 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant Units 1 & 2, License Renewal Application Project stage: RAI ML0832505912008-11-25025 November 2008 Request for Additional Information Boraflex Neutron Absorbing Material in Spent Fuel Pool Racks and the Protective Coatings Program Project stage: RAI ML0831805582008-11-25025 November 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant Units 1 & 2, License Renewal Application Project stage: RAI ML0832507162008-12-0101 December 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application (TAC Nos. MD8513 and MD8514) RAI 2.4.1-1, 2.4.3-1, 2.4.7-1, 2.4.7-2, 2.4.8-1, 2.4.11-1 Project stage: RAI ML0833100782008-12-0202 December 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application Project stage: RAI L-PI-08-098, Responses to NRC Requests for Additional Information Dated November 5, 2008 Regarding Application for Renewed Operating Licenses2008-12-0505 December 2008 Responses to NRC Requests for Additional Information Dated November 5, 2008 Regarding Application for Renewed Operating Licenses Project stage: Response to RAI ML0832507202008-12-0505 December 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application (TAC MD8513 and MD8514). RAIB2.1.3-1; B2.1.27-1; B2.1.8-1; B2.1.8-2; B2.1.8-3; B2.1.8-4; B2.1.19-1; B Project stage: RAI ML0830105612008-12-10010 December 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant Units 1 & 2, License Renewal Application Project stage: RAI ML0832503292008-12-16016 December 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application Project stage: RAI ML0831705612008-12-18018 December 2008 Enclosurequest for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application Project stage: RAI ML0831705662008-12-18018 December 2008 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 & 2, License Renewal Application (TAC Nos. MD8513 and MD8514) Cover Letter Project stage: RAI ML0908600632009-02-10010 February 2009 Meeting Summary, Telephone Conference Call Between the NRC and Prairie Island, Concerning Requests for Additional Information Pertaining to the Prairie Island Units 1 and 2, License Renewal Application Project stage: Meeting ML0908600622009-02-11011 February 2009 Summary of Telephone Conference Call Between NRC and Prairie Island Nuclear Generating Plant, Concerning Requests for Additional Information Pertaining to License Renewal Application Project stage: RAI ML0903706742009-02-18018 February 2009 Notice of Meeting with Northern States Power Corporation, Minnesota, (NSPM) to Discuss RAI in the License Renewal Review for PINGP Project stage: RAI ML0903406842009-02-20020 February 2009 Request for Additional Information for Prairie Island Nuclear Generating Units 1 and 2, License Renewal Application (Tac Nos. MD8513 and MD8514) Project stage: RAI ML0908600612009-02-23023 February 2009 Summary of Telephone Conference Call Held Between NRC and Prairie Island, Concerning Request for Additional Information Pertaining to the Prairie Island Units 1 and 2 Project stage: RAI ML0906305452009-03-0202 March 2009 Meeting Slides, Praire Island Refueling Cavity Leakage Project stage: Meeting ML0908404212009-03-31031 March 2009 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML0909300262009-04-0606 April 2009 Meeting Summary, Meeting Between NRC Staff and Northern States Power Company, Minnesota (NSPM) Project stage: Meeting L-PI-09-047, Responses to NRC Requests for Additional Information Dated March 31, 2009 and Follow Up Questions Regarding Application for Renewed Operating Licenses2009-04-0606 April 2009 Responses to NRC Requests for Additional Information Dated March 31, 2009 and Follow Up Questions Regarding Application for Renewed Operating Licenses Project stage: Response to RAI ML0908500092009-04-21021 April 2009 License Renewal Application, Safety Audit Report Project stage: Other ML0833001072009-04-21021 April 2009 Scoping and Screening Audit Summary Regarding the Prairie Island Nuclear Generating Plant, Units 1 and 2, License Renewal Application Project stage: Other ML0911701242009-05-29029 May 2009 Summary of Telephone Conference Call Held Between NRC and Northern States Power Company, Concerning Draft Requests for Additional Information Pertaining to the PINGP, Units 1 and 2, License Renewal Application Project stage: Draft RAI ML0915404122009-06-10010 June 2009 Request for Additional Information for the Review of the Prairie Island Nuclear Generating Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML11147A1392011-06-27027 June 2011 Enclosure 2: Prairie Island Nuclear Generating Plant, Unit 2, Renewed Facility Operating License Project stage: Request ML11147A1402011-06-27027 June 2011 Notice of Issuance of Renewed Facility Operating License Nos. DPR-42 and DPR-60 for an Additional 20-Year Period Record of Decision Project stage: Request ML11147A1372011-06-27027 June 2011 Renewed Facility Operating License Project stage: Request ML11147A1232011-06-27027 June 2011 Issuance of Renewed Facility Operating Licenses for Prairie Island Nuclear Generating Plant Project stage: Approval ML11172A0202011-06-27027 June 2011 Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant Project stage: Other ML11172A0222011-06-27027 June 2011 Technical Specifications, Unit 2, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant Project stage: Other 2008-04-11
[Table View] |
Text
ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2 DOCKET NOS.: 50-282 AND 50-306 For Prairie Island Nuclear Generating Plant, Units 1 and 2 (PINGP), the staff reviewed the license renewal application (LRA); Updated Final Safety Analysis Report (UFSAR), Section 10.3.1, Plant Fire Protection Program; and the following fire protection current licensing basis (CLB) documents listed in the PINGP Units 1 and 2 Operating License Condition 2.C.4:
Safety Evaluation Reports dated February 14, 1978, September 6, 1979, April 21, 1980,December 29, 1980, July 28, 1981, October 27, 1989, and October 6, 1995.
The staff has identified that fire protection systems and components discussed in the following sections have been excluded from the scope of license renewal and an aging management review (AMR). These systems and components were not included in the license renewal boundaries and appear to have fire protection intended functions required for compliance with Title 10 of the Code of Federal Regulations (CFR) 50.48, Fire protection, as stated in 10 CFR 54.4. Therefore, in order to complete our review, the staff requires responses to the following requests for additional information (RAIs):
RAI 2.3.3.9-1 Section 4.3.1.5 of the Safety Evaluation Report for PINGP Units 1 and 2, dated September 6, 1979, discusses various types of wet pipe, deluge, and pre-action dry pipe sprinkler systems provided in the plant areas for fire suppression activities. The sprinkler systems in various areas are:
Fire Sprinkler System Area Wet Pipe Automatic Sprinkler Systems Turbine Building - Turbine Lube Oil and Control Oil Piping Areas Air Compressor and Auxiliary Feedwater Pump Rooms Exit Stairwells Records Storage Area Decontamination Area Water Treatment Area Warehouse Hot Lab Area Deluge Systems Main Auxiliary and Startup Transformers Turbine Generators Bearings Turbine Seal Oil Unit Turbine Lube Oil Reservoir Oil Storage Room Charcoal Filter - Auxiliary Building Special Exhaust Filter and the Shield Building Exhaust Filters
2 Pre-action Dry Pipe Sprinkler Systems Containment Cable Penetration Areas Screen House Pump Area (Both Levels)
Including the Diesel Cooling Water Pumps and the Diesel Driven Fire Pump The staff requests that the applicant verify whether the above sprinkler systems installed in various areas of the plant are in the scope of license renewal in accordance with 10 CFR 54.4(a) and subject to an AMR in accordance with 10 CFR 54.21(a)(1). If they are excluded from the scope of license renewal and not subject to an AMR, the staff requests that the applicant provide justification for the exclusion.
RAI 2.3.3.9-2 LRA Tables 2.3.3-9 and 3.3.2-9 exclude several types of fire protection components that appear on the LRA drawings as within the scope of license renewal or discussed in PINGP CLB documents. These components are listed below:
hose connections interior fire hose stations pipe supports couplings dikes for oil spill confinement floor drains and curbs for fire-fighting water backflow prevention devices trash grids and traveling screens flame retardant coating for cables fire retardant intumescent coating for polyurethane foam insulation turbine building smoke removal system components air compressors for safe-shutdown operations For each, determine whether the component should be included in Tables 2.3.3-9 and 3.3.2-9 as component types subject to an AMR, and if not, justify the exclusion.