Public Letter - Issuance of Amendment 181 Regarding License Amendment Request to Increase the Interval Between Local Power Range Monitor Calibrations from 1000 Megawatt-Days/Ton (Mwd/T to 2000 Mwd/T as Required in CPS Technical
ML082610581
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/12/2008
From: Sands S
Plant Licensing Branch III
To: Pardee C
AmerGen Energy Co
Sands S
Shared Package
ML082180847 List:
References
TAC MD3795
Download: ML082610581 (2)


Text

UNITED STATES 0

tNUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 12, 2008 Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CLINTON POWER STATION (CPS), UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: LICENSE AMENDMENT REQUEST TO INCREASE THE INTERVAL BETWEEN LOCAL POWER RANGE MONITOR CALIBRATIONS FROM 1000 MEGAWATT-DAYS/TON (MWD/T) TO 2000 MWD/T AS REQUIRED IN CPS TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.3.1.1.8 AND 3.3.1.3.2. (TAC NO. MD3795)

Dear Mr. Pardee:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 181 to Facility Operating License No. NPF-62 for the Clinton Power Station (CPS), Unit No. 1. The amendment is in response to your application dated December 12, 2006, as supplemented by letters dated November 16, 2007, and May 16 and June 27, 2008.

The amendment would increase the interval between local power range monitor (LPRM) calibrations from 1000 megawatt-days/ton (MWD/T) to 2000 MWD/T required by the CPS Technical Specification Surveillance Requirement 3.3.1.1.8 and 3.3.1.3.2. The November 16, 2007, and May 16, and June 27, 2008, supplements, contained clarifying information and did not change the NRC staff's initial proposed finding of no significant hazards consideration.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.

Sincerely, Stephen P. Sands, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosures:

1. Amendment-No. 181 to NPF-62
2. Safety Evaluation (Non-proprietary)
3. Safety Evaluation (Proprietary) cc w/enclosures 1 and 2: See next page FC II S E N' LY - CnN4TA IN 1 DPMfRIQ'TAR INFO IArlr+O.I:"I\\T Ai

G fFI~AUEOL FNT N!

A bWLT RY INFOR!tI September 12, 2008 Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL-60555

SUBJECT:

CLINTON POWER STATION (CPS), UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: LICENSE AMENDMENT REQUEST TO INCREASE THE INTERVAL BETWEEN LOCAL POWER RANGE MONITOR CALIBRATIONS FROM 1000 MEGAWATT-DAYS/TON (MWDiT) TO 2000 MWD/T AS REQUIRED IN CPS TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.3.1.1.8 AND 3.3.1.3.2. (TAG NO. MD3795)

Dear Mr. Pardee:

The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 181 to Facility Operating License No. NPF-62 for the Clinton Power Station (CPS), Unit No. 1. The amendment is in response to your application dated December 12, 2006, as supplemented by letters dated November 16, 2007, and May 16 and June 27, 2008.

The amendment would increase the interval between local power range monitor (LPRM) calibrations from 1000 megawatt-days/ton (MWD/T) to 2000 MWD/T required by the CPS Technical Specification Surveillance Requirement 3.3.1.1.8 and 3.3.1.3.2. The November 16, 2007, and May 16, and June 27, 2008, supplements, contained clarifying information and did not change the NRC staff's initial proposed finding of no significant hazards consideration.

A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice..

Sincerely,

/RA/

Stephen P. Sands, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosures:

1. Amendment No.181 to NPF-62
2. Safety Evaluation (Non-proprietary)
3. Safety Evaluation (Proprietary) cc w/encls 1 and 2: See next page DISTRIBUTION:

PUBLIC LPL3-2 R/F GHill (2)

RidsNrrDirsltsb RidsOgcRp RidsNrrLATHarris RidsNrrDorlLpl3-2 RidsNrrDorlDpr RidsNrrPMSSands RidsNrrRgn3MailCenter RidsAcrsAcnw&mMailCenter Package: ML082180847 ML (Enclosure 2)

Amendment: ML082180720 ML (Enclosure 3)

Tech Spec Pages: ML OFFICE LPL3-2/PM LPL3-2/LA /'-