ML082600069
| ML082600069 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/12/2008 |
| From: | Reilly J Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-08-001 | |
| Download: ML082600069 (2) | |
Text
SOUTHERN CALIFORNIA James T. Reilly
__EDISON° F51 EVice President An EDISON INTERNATIONAL Company September 12, 2008 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001
Subject:
Docket Nos. 50-361 and 50-362 Supplement to Three-Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" San Onofre Nuclear Generating Station, Units 2 and 3
References:
- 1. August 12, 2008 letter from N. Kalyanam (NRC) to R. Ridenoure (SCE),
Subject:
San Onofre Nuclear Generating Station Units 2 and 3 - Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," Proposed Alternative Course of Action (TAC NOS.
MD7876 and MD 7877)
- 2. May 15, 2008 letter from R. Ridenoure (SCE) to Document Control Desk (NRC),
Subject:
Three-Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems,"
San Onofre Nuclear Generating Station Units 2 and 3
- 3. NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," dated January 11, 2008
Dear Sir or Madam:
This letter provides Southern California Edison's (SCE's) 3-month supplemental response as requested by the Nuclear Regulatory Commission (NRC) in its letter provided by Reference 1.
SCE plans to complete the evaluation required by Generic Letter (GL) 2008-01
[Reference 3] and provide the results of this evaluation in its 9-month response submittal. The evaluation is based on walkdowns completed prior to the issuance of GL 2008-01 and design configuration control as stated in Reference 2. The evaluation being performed bounds both San Onofre Nuclear Generating Station (SONGS) Units 2 P.O. Box 128 San Clemente, CA 92674-0128 949-368-3780 Fax 949-368-3770 w af<Z
Document Control Desk September 12, 2008 and 3. Because SCE plans to complete the evaluation for Units 2 and 3 at the time of the 9-month response, separate 9-month supplemental submittals for each unit are not anticipated. If SCE does not complete the evaluation as currently planned, a commitment to provide a supplemental submittal will be made in the 9-month response.
The 9-month response will provide:,(1) a description of the results of the evaluation that was performed in response to the GL; (2) a description of all corrective actions that SCE determined were necessary; and (3) a statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule. The 9-month response will also include the reviews of the licensing basis, the design drawings, and testing and system operating procedures.
Other potential long-term actions that are identified in the GL will be addressed in SCE's 9-month response and will follow industry guidance available at that time.
Should you have any questions, please contact Ms. Linda Conklin at (949) 368-9443.
Sincerely, cc:
' E. E. Collins, Regional Administrator, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3