Supplement to Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML082600069
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/12/2008
From: Reilly J
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-08-001
Download: ML082600069 (2)


Text

SOUTHERN CALIFORNIA James T. Reilly

__EDISON° F51 EVice President An EDISON INTERNATIONAL Company September 12, 2008 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555-0001

Subject:

Docket Nos. 50-361 and 50-362 Supplement to Three-Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems" San Onofre Nuclear Generating Station, Units 2 and 3

References:

1. August 12, 2008 letter from N. Kalyanam (NRC) to R. Ridenoure (SCE),

Subject:

San Onofre Nuclear Generating Station Units 2 and 3 - Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," Proposed Alternative Course of Action (TAC NOS.

MD7876 and MD 7877)

2. May 15, 2008 letter from R. Ridenoure (SCE) to Document Control Desk (NRC),

Subject:

Three-Month Response to NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems,"

San Onofre Nuclear Generating Station Units 2 and 3

3. NRC Generic Letter 2008-01, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," dated January 11, 2008

Dear Sir or Madam:

This letter provides Southern California Edison's (SCE's) 3-month supplemental response as requested by the Nuclear Regulatory Commission (NRC) in its letter provided by Reference 1.

SCE plans to complete the evaluation required by Generic Letter (GL) 2008-01

[Reference 3] and provide the results of this evaluation in its 9-month response submittal. The evaluation is based on walkdowns completed prior to the issuance of GL 2008-01 and design configuration control as stated in Reference 2. The evaluation being performed bounds both San Onofre Nuclear Generating Station (SONGS) Units 2 P.O. Box 128 San Clemente, CA 92674-0128 949-368-3780 Fax 949-368-3770 w af<Z

Document Control Desk September 12, 2008 and 3. Because SCE plans to complete the evaluation for Units 2 and 3 at the time of the 9-month response, separate 9-month supplemental submittals for each unit are not anticipated. If SCE does not complete the evaluation as currently planned, a commitment to provide a supplemental submittal will be made in the 9-month response.

The 9-month response will provide:,(1) a description of the results of the evaluation that was performed in response to the GL; (2) a description of all corrective actions that SCE determined were necessary; and (3) a statement regarding which corrective actions were completed, the schedule for completing the remaining corrective actions, and the basis for that schedule. The 9-month response will also include the reviews of the licensing basis, the design drawings, and testing and system operating procedures.

Other potential long-term actions that are identified in the GL will be addressed in SCE's 9-month response and will follow industry guidance available at that time.

Should you have any questions, please contact Ms. Linda Conklin at (949) 368-9443.

Sincerely, cc:

' E. E. Collins, Regional Administrator, NRC Region IV N. Kalyanam, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3