Letter Sequence Other |
---|
|
|
MONTHYEARRA-08-057, Unit 1, Application for Approval of License Transfers2008-06-20020 June 2008 Unit 1, Application for Approval of License Transfers Project stage: Request ML0820303892008-07-23023 July 2008 Unit 1 - Acceptance Review Results Request for Approval of Transfer of Facility Operating Licenses and Conforming Amendments Project stage: Acceptance Review ML0823204772008-08-14014 August 2008 License Transfer Project stage: Other ML0820408822008-08-14014 August 2008 Notice of Consideration of Approval of Transfer of Facility Operating Licenses and Conforming Amendments Project stage: Other ML0822807952008-08-22022 August 2008 Amergen Energy Company, LLC - Request for Withholding Information from Public Disclosure for Clinton Power Station, Unit No. 1, Oyster Creek Nuclear Generating Station, and Three Mile Island Nuclear Station, Unit 1 Project stage: Withholding Request Acceptance ML0836403732008-12-23023 December 2008 Order Approving Transfer of the Operating License and Conforming Amendment Project stage: Other ML0827500722008-12-23023 December 2008 Unit 1 - Public Safety Evaluation by the Office of Nuclear Reactor Regulation Direct Transfer of Facility Operating Licenses from Amergen Energy Co., LLC to Exelon Generation Co., LLC Project stage: Approval ML0827502532008-12-23023 December 2008 Draft Amendment to Facility Operating License Project stage: Draft Other ML0827502402008-12-23023 December 2008 Order - Order Approving Transfer of the Operating License and Conforming Amendment Project stage: Other ML0827705682009-01-0808 January 2009 Unit 1, Issuance of Conforming Amendments Direct Transfer of Facility Operating License to Exelon Generation Co., LLC Project stage: Approval TMI-09-009, Future Correspondence Concerning the License Renewal Application and a Revision to the License Renewal Commitment List2009-01-26026 January 2009 Future Correspondence Concerning the License Renewal Application and a Revision to the License Renewal Commitment List Project stage: Other 2008-08-14
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML22297A1352022-12-20020 December 2022 Part 20 App G Exemption FRN ML21362A4472022-01-26026 January 2022 EA-21-041: Enclosure to January 26, 2022, Letter to Mr. Kelly Trice, President, Holtec NRC Investigation Report & NRC Inspection Confirmatory Order; Issuance. Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating ML19168A0842019-06-26026 June 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 07/02/2019 ML19109A1602019-06-20020 June 2019 Federal Register Notice Announcing Order Approving Oyster Creek Nuclear Generating Station License Transfer ML19112A3182019-06-20020 June 2019 FRN - Exemption for Hdi to Use Oyster Creek Nuclear Decommissioning Trust Fund Re Request for License Transfer from Exelon ML19129A3642019-06-19019 June 2019 Off-Site Exemption FRN LRC ML19129A3212019-06-19019 June 2019 Oystercreek_Onsite Exemption Frn_Lrc ML19095A8722019-06-13013 June 2019 FRN, Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation ML19112A1122019-06-13013 June 2019 FRN Ea/Fonsi for Exemption for Hdi to Use the Nuclear Decommissioning Trust Fund Re Request for License Transfer from Exelon ML19093A0882019-04-26026 April 2019 FRN, Environmental Assessment and Finding of No Significant Impact Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation ML18229A0072018-12-21021 December 2018 FRN, Exemption from 10 CFR 140.11(a)(4) Related to Primary and Secondary Offsite Liability Insurance NRC-2018-0288, FRN, Exemption from 10 CFR 140.11(a)(4) Related to Primary and Secondary Offsite Liability Insurance2018-12-21021 December 2018 FRN, Exemption from 10 CFR 140.11(a)(4) Related to Primary and Secondary Offsite Liability Insurance ML18228A8502018-12-21021 December 2018 FRN, Request for Exemption from 10 CFR 50.54(w)(1) Related to Onsite Property Damage Insurance ML18323A6902018-12-0404 December 2018 Letter, Reopen the Comment Period - Notice of Consideration of Approval of Transfer of Renewed Facility Operating License and Conforming Amendment, and Opportunity for a Hearing ML18323A6612018-12-0404 December 2018 Federal Register Notice to Reopen the Comment Period - Notice of Application for Order Approving Direct Transfer of Renewed Facility License and Conforming License Amendment ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 ML18227A0232018-10-19019 October 2018 FRN, Exemption from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv); Decommissioning Trust Funds Use and Disbursements for Spent Fuel Management and Site Restoration Activities ML18220A9712018-10-16016 October 2018 FRN, Exemption from Portions of 10 CFR 50.47 and Appendix E to 10 CFR 50 to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition (CAC MG0153; EPID L-2017-LLE-0020) NRC-2018-0167, FRN, Exemption from Portions of 10 CFR 50.47 and Appendix E to 10 CFR 50 to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition (CAC MG0153; EPID L-2017-LLE-0020)2018-10-16016 October 2018 FRN, Exemption from Portions of 10 CFR 50.47 and Appendix E to 10 CFR 50 to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition (CAC MG0153; EPID L-2017-LLE-0020) ML18254A0972018-10-16016 October 2018 Letter, Notice of Application for Order Approving Direct Transfer of License and Conforming Amendment to Oyster Creek Environmental Protection LLC and Holtec Decommissioning International LLC ML18254A1312018-10-16016 October 2018 FRN, Notice of Application for Order Approving Direct Transfer of License and Conforming Amendment to Oyster Creek Environmental Protection LLC and Holtec Decommissioning International LLC ML18194A7882018-08-0808 August 2018 Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements (CAC No. MG0153; EPID L-2017-LLE-0020) NRC-2018-0136, Notice of Issuance of Exemption from Certain 10 CFR Part 50 Requirements Regarding Record Retention2018-06-26026 June 2018 Notice of Issuance of Exemption from Certain 10 CFR Part 50 Requirements Regarding Record Retention ML18122A2902018-06-26026 June 2018 Notice of Issuance of Exemption from Certain 10 CFR Part 50 Requirements Regarding Record Retention ML18149A0722018-06-0505 June 2018 Letter, Notice of Receipt, Public Meeting, and Request for Comment on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate ML18149A0942018-06-0505 June 2018 FRN, Notice of Receipt, Public Meeting, Request for Comment, Post-Shutdown Decommissioning Activities Report NRC-2018-0058, FRN, Withdrawal of Request to Revise License Condition to Implement BWRVIP-18, Revision 2-A, BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines (CAC MG0180; EPID L-2017-LLA-0304)2018-03-16016 March 2018 FRN, Withdrawal of Request to Revise License Condition to Implement BWRVIP-18, Revision 2-A, BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines (CAC MG0180; EPID L-2017-LLA-0304) ML18047A4302018-03-16016 March 2018 FRN, Withdrawal of Request to Revise License Condition to Implement BWRVIP-18, Revision 2-A, BWR Vessel and Internals Project, BWR Core Spray Internals Inspection and Flaw Evaluation Guidelines (CAC MG0180; EPID L-2017-LLA-0304) ML16257A4962017-01-23023 January 2017 FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 NRC-2017-0014, FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF2017-01-23023 January 2017 FRN: Clinton, Quad Cities, & Oyster Creek - FRN Exemption from the Requirements of 10 CFR Part 73, Sections 55(p)(1)(i) and (p)(1)(ii) Related to the Suspension of Security Measures in an Emergency or During Severe Weather (CAC Nos. MF8275 ML16257A5172016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 20162016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML14335A6482015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6302015-01-15015 January 2015 G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2015-0009, G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units2015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2014-0917, Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 20142014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 ML14247A1542014-09-0505 September 2014 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 16, 2014 ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML14099A2172014-04-28028 April 2014 FRN on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI NRC-2013-0288, Request for Exemption from Emergency Preparedness Title 10 of the Code of Federal Regulations Part 50, Appendix E2013-12-30030 December 2013 Request for Exemption from Emergency Preparedness Title 10 of the Code of Federal Regulations Part 50, Appendix E ML13291A0852013-12-30030 December 2013 Request for Exemption from Emergency Preparedness Title 10 of the Code of Federal Regulations Part 50, Appendix E ML13290A6932013-12-30030 December 2013 Request for Exemption from Emergency Preparedness Title 10 of the Code of Federal Regulations Part 50, Appendix E ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML12250A8462012-11-0909 November 2012 Correction to Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R Requirements NRC-2010-0200, Correction to Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R Requirements2012-11-0909 November 2012 Correction to Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R Requirements NRC-2009-0320, Correction to Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R Requirements2012-10-15015 October 2012 Correction to Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R Requirements ML12250A8002012-10-15015 October 2012 Correction to Exemption from Title 10 of the Code of Federal Regulations Part 50, Appendix R Requirements 2022-12-20
[Table view] |
Text
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION AMERGEN ENERGY COMPANY OYSTER CREEK GENERATING STATION DOCKET NO. 50-219 NOTICE OF CONSIDERATION OF APPROVAL OF TRANSFER OF FACILITY OPERATING LICENSE, CONFORMING AMENDMENT, AND OPPORTUNITY FOR A HEARING The U.S. Nuclear Regulatory Commission (NRC, the Commission) is considering the issuance of an order under 10 CFR 50.80 approving the direct transfer of Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek) currently held by AmerGen Energy Company (AmerGen) as owner and licensed operator of Oyster Creek. The transfer would be to Exelon Generation Company, LLC (Exelon Generation). The Commission is also considering amending the license for administrative purposes to reflect the proposed transfer.
According to an application for approval dated June 20, 2008, filed by AmerGen and Exelon Generation, Exelon Generation would acquire ownership of the facility, including an onsite independent spent fuel storage installation, following approval of the proposed license transfer, and would be responsible for the operation, maintenance, and eventual decommissioning of Oyster Creek.
No physical changes to the Facility or operational changes are being proposed in the application.
The proposed amendment would replace references to AmerGen in the license with references to Exelon Generation, to reflect the proposed transfer.
Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. The Commission will approve an application for the direct transfer of a license, if the Commission determines that the proposed transferee is qualified to hold the license, and that the transfer is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto.
Before issuance of the proposed conforming license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commission=s regulations.
As provided in 10 CFR 2.1315, unless otherwise determined by the Commission with regard to a specific application, the Commission has determined that any amendment to the license of a utilization facility, which does no more than conform the license to reflect the transfer action, involves no significant hazards consideration. No contrary determination has been made with respect to this specific license amendment application. In light of the generic determination reflected in 10 CFR 2.1315, no public comments with respect to significant hazards considerations are being solicited, notwithstanding the general comment procedures contained in 10 CFR 50.91.
The filing of requests for hearing and petitions for leave to intervene, and written comments with regard to the license transfer application, are discussed below.
Within 20 days from the date of publication of this notice, any person(s) whose interest may be affected by the Commission=s action on the application may request a hearing and intervention via electronic submission through the NRC E-filing system. Requests for a hearing and petitions for leave to intervene should be filed in accordance with the Commissions rules of
practice set forth in Subpart C ARules of General Applicability: Hearing Requests, Petitions to Intervene, Availability of Documents, Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings,@ of 10 CFR Part 2. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309. Untimely requests and petitions may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for failure to file on time is established. In addition, an untimely request or petition should address the factors that the Commission will also consider, in reviewing untimely requests or petitions, set forth in 10 CFR 2.309(c)(1)(i)-(viii).
A request for hearing or a petition for leave to intervene must be filed in accordance with the NRC E-Filing rule, which the NRC promulgated on August 28, 2007 (72 FR 49139). The E-Filing process requires participants to submit and serve documents over the internet or in some cases to mail copies on electronic storage media. Participants may not submit paper copies of their filings unless they seek a waiver in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least ten (10) days prior to the filing deadline, the petitioner/requestor must contact the Office of the Secretary by e-mail at HEARINGDOCKET@NRC.GOV, or by calling (301) 415-1677, to request (1) a digital ID certificate, which allows the participant (or its counsel or representative) to digitally sign documents and access the E-Submittal server for any proceeding in which it is participating; and/or (2) creation of an electronic docket for the proceeding (even in instances in which the petitioner/requestor (or its counsel or representative) already holds an NRC-issued digital ID certificate). Each petitioner/ requestor will need to download the Workplace Forms ViewerJ to access the Electronic Information Exchange (EIE), a component of the E-Filing system. The Workplace Forms ViewerJ is free and is available at http://www.nrc.gov/site-help/e-
submittals/install-viewer.html. Information about applying for a digital ID certificate is available on NRC=s public website at http://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate, had a docket created, and downloaded the EIE viewer, it can then submit a request for hearing or petition for leave to intervene. Submissions should be in Portable Document Format (PDF) in accordance with NRC guidance available on the NRC public website at http://www.nrc.gov/site-help/e-submittals.html.
A filing is considered complete at the time the filer submits its documents through EIE. To be timely, an electronic filing must be submitted to the EIE system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an e-mail notice confirming receipt of the document. The EIE system also distributes an e-mail notice that provides access to the document to the NRC Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the documents on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before a hearing request/petition to intervene is filed so that they can obtain access to the document via the E-Filing system.
A person filing electronically may seek assistance through the AContact Us@ link located on the NRC website at http://www.nrc.gov/site-help/e-submittals.html or by calling the NRC technical help line, which is available between 8:30 a.m. and 4:15 p.m., Eastern Time, Monday through Friday. The help line number is (800) 397-4209 or locally, (301) 415-4737.
Participants who believe that they have a good cause for not submitting documents electronically must file a motion, in accordance with 10 CFR 2.302(g), with their initial paper filing requesting authorization to continue to submit documents in paper format. Such filings must be submitted by: (1) first class mail addressed to the Office of the Secretary of the
Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or expedited delivery service to the Office of the Secretary, Sixteenth Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852, Attention: Rulemaking and Adjudications Staff. Participants filing a document in this manner are responsible for serving the document on all other participants.
Filing is considered complete by first-class mail as of the time of deposit in the mail, or by courier, express mail, or expedited delivery service upon depositing the document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be entertained absent a determination by the Commission, the presiding officer, or the Atomic Safety and Licensing Board that the petition and/or request should be granted and/or the contentions should be admitted, based on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-(viii). To be timely, filings must be submitted no later than 11:59 p.m. Eastern Time on the due date.
Documents submitted in adjudicatory proceedings will appear in NRC's electronic hearing docket which is available to the public at http://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant to an order of the Commission, an Atomic Safety and Licensing Board, or a Presiding Officer. Participants are requested not to include personal privacy information, such as social security numbers, home addresses, or home phone numbers in their filings. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants are requested not to include copyrighted materials in their submissions.
The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the FEDERAL REGISTER and served on the parties to the hearing.
As an alternative to petitions to intervene and requests for hearing, within 30 days from the date of publication of this notice, persons may submit written comments regarding the license transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise constitute part of the decisional record. Comments should be submitted to the Secretary, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, and should cite the publication date and page number of this FEDERAL REGISTER notice.
For further details with respect to this license transfer application, see the application dated June 20, 2008, available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agency wide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site, http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by e-mail to pdr.resource@nrc.gov.
Dated at Rockville, Maryland this 14th day of August 2008.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Christopher Gratton, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation