IR 05000346/2008403
| ML082030631 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/15/2008 |
| From: | Eric Duncan Plant Support Branch II |
| To: | Allen B FirstEnergy Nuclear Operating Co |
| References | |
| IR-08-403 | |
| Download: ML082030631 (4) | |
Text
July 15, 2008
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION
NRC SECURITY BASELINE INSPECTION REPORT 05000346/2008403(DRS)
Dear Mr. Allen:
On June 13, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on June 13, 2008, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA by D. Funk for/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-346 License No. NPF-3
Nonpublic Enclosure: Inspection Report 05000346/2008403(DRS);
w/Attachment: Supplemental Information
cc w/encl:
D. Riffle, NSIR/DSO/DDSO
C. OClaire, State Liaison Officer
Ohio Emergency Management Agency
cc w/o encl:
The Honorable Dennis Kucinich
J. Hagan, President and Chief
Nuclear Officer - FENOC
J. Lash, Senior Vice President of
Operations and Chief Operating Officer - FENOC
Manager - Site Regulatory Compliance - FENOC
D. Pace, Senior Vice President of
Fleet Engineering - FENOC
J. Rinckel, Vice President, Fleet Oversight - FENOC
P. Harden, Vice President, Nuclear Support
D. Jenkins, Attorney, FirstEnergy Corp.
Director, Fleet Regulatory Affairs - FENOC
Manager - Fleet Licensing - FENOC
R. Owen, Administrator, Ohio Department of Health
Public Utilities Commission of Ohio
President, Lucas County Board of Commissioners
President, Ottawa County Board of Commissioners