Other: ML073511698, ML081790538, ML091800430, ML093000354, ML101800052, ML110350515, NRC 2009-0113, Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706), NRC 2011-0010, Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
|
MONTHYEARML0515203322005-06-0303 June 2005 6/3/05, Point Beach - RAI Potential Impact of Debris Blockage on Emergency Sump Recirculation Pressurized-Water Reactors Project stage: RAI ML0603704912006-02-0909 February 2006 RAI - Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors Project stage: RAI ML0732303452007-11-16016 November 2007 Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0735116982007-12-20020 December 2007 GSI-191/GL 2004-02 Extension Request Approval (Tac No. MC4705/4706) Project stage: Other NRC 2008-0027, Response to Request for Additional Information License Amendment Request 260 One-Time Extension of Completion Time for Technical Specification 3.7.5. Auxiliary Feedwater System2008-05-15015 May 2008 Response to Request for Additional Information License Amendment Request 260 One-Time Extension of Completion Time for Technical Specification 3.7.5. Auxiliary Feedwater System Project stage: Response to RAI ML0816203372008-06-0909 June 2008 Supplemental Response to Generic Letter 2004-02, Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0817905382008-07-0101 July 2008 Generic Safety Issue 191/Generic Letter 2004-02, Additional Extension Request Approval Project stage: Other ML0822503302008-10-0606 October 2008 Teleconference Summary Regarding Point Beach Nuclear Plant Supplement to the Auxiliary Feedeater Amendment Project stage: Request ML0833001732009-01-0707 January 2009 GSI-191/GL 2004-02 Request for Additional Information Project stage: RAI NRC 2009-0033, Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-04-0707 April 2009 Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0909805232009-04-0707 April 2009 Response to Request for Additional Information GSI-191/GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0916603262009-06-12012 June 2009 Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) Project stage: Request NRC 2009-0053, Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706)2009-06-12012 June 2009 Request for Extension of Unit 1 and 2 Completion Dates for Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC MC4705/4706) Project stage: Request NRC 2009-0059, Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-06-29029 June 2009 Response to Request for Additional Information GSI-I91/GL 2004-02 Potential Lmpact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0918004302009-06-30030 June 2009 GSI-191/GL 2004-02 Additional Extension Request Approval Project stage: Other ML0921506362009-07-31031 July 2009 Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI NRC 2009-0077, Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors2009-07-31031 July 2009 Response to Request for Additional Information GSI-191/GL 2004-02 (TACs MC4705/4706) Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors Project stage: Response to RAI ML0930003542009-10-27027 October 2009 Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706) Project stage: Other NRC 2009-0113, Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706)2009-10-27027 October 2009 Generic Letter 2004-02, Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (TAC Nos. MC4705/4706) Project stage: Other ML1005704542010-03-0303 March 2010 Notice of Meeting with FPL Energy Point Beach, LLC Regarding Discussion of Licensee Responses to Generic Letter 2004-02 for Point Beach Nuclear Plant, Units 1 and 2 Project stage: Meeting ML1005703212010-03-0303 March 2010 Request for Additional Information Generic Letter 2004-02 Round 2 Project stage: RAI NRC 2010-0046, Supplemental Response for Extension Request for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation Durian Design Basis Accidents at Pressurized-Water Reactors2010-06-11011 June 2010 Supplemental Response for Extension Request for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation Durian Design Basis Accidents at Pressurized-Water Reactors Project stage: Supplement ML1018000522010-06-30030 June 2010 Generic Letter Project stage: Other ML1016002922010-07-0808 July 2010 Summary of Meeting with NextEra Point Beach, Llc. Response to GL 2004-02 Project stage: Meeting NRC 2011-0010, Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors2011-02-0404 February 2011 Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other ML1103505152011-02-0404 February 2011 Plan for Completion of Actions for Generic Letter 2004-02 Potential Impact for Debris Blockage in Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Other L-2012-098, Units, 1 and 2, Turkey Point, Units 3 and 4, Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol2012-03-0303 March 2012 Units, 1 and 2, Turkey Point, Units 3 and 4, Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol Project stage: Request ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol Project stage: Draft Approval ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto Project stage: Draft Approval ML12121A3842012-08-31031 August 2012 Acknowledgment Letter Regarding Draft Propose Guideline for Strainer Fiber Bypass Test Protocol Associated with Generic Letter 2004 Project stage: Draft Other 2009-06-12
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 3, 2010 MEMORANDUM TO: Robert J. Pascarelli, Chief Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Justin C. Poole, Project Manager 0 Plant Licensing Branch 111-1
/
Division of Operating Reactor Licensing
/
Office of Nuclear Reactor Regulation
.,/'
//
SUB~IECT:
FORTHCOMING MEETING WITH FPL ENERGY POINT BEACH, LLC (PBNP) REGARDING RESPONSE TO GENERIC LETTER 2004-02 FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 DATE & TIME:
Wednesday, March 17,2010 9:00 a.m. - 6:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission (NRC)
One White Flint North 11555 Rockville Pike, Room 0-10B6 Rockville, Maryland PURPOSE:
The purpose of this meeting is to discuss PBNP's planned approach to address the NRC's request for additional information (RAI) dated March 3, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML100570321). The RAI pertains to information submitted by PBNP in response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," for Point Beach Nuclear Plant, Units 1 and 2.
CATEGORY 1:*
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
CONTACTS:
Justin Poole, NRR Peter Tam, NRR 301-415-2048 301-415-1451 Justin. Poole@nrc.gov Peter.Tam@nrc.gov
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
R. Pascarelli
- 2 PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation.
NRC J. Poole M. Scott J. Lehning S. Smith P. Klein, et. al.
PBNP J. Costedio F. Flentje T. Kendall B. Dunn, et. al.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts before Monday, March 15, 2010, 4:00 pm (Eastern Standard Time) to get the telephone number and the pass code.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-266 and 50-301
Enclosure:
Agenda cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING MEETING WITH FPL ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 RESPONSE TO GENERIC LETTER 2004-02 9:00 a.m. - 9:15 a.m.
9:15 a.m. - 10:30 a.m.
10:30 a.m. - 10:45 a.m.
10:45 a.m. - 12:00 p.m.
12:00 p.m. - 12:15 p.m.
12:15 p.m. -1:15 p.m.
1:15 p.m. - 2:30 p.m.
2:30 p.m. - 2:45 p.m.
2:45 p.m. - 4:00 p.m.
4:00 p.m. - 4:15 p.m.
4:15 p.m. - 5:15 p.m.
5:15 p.m. - 5:30 p.m.
5:30 p.m. - 6:00 p.m.
6:00 p.m.
WEDNESDAY, MARCH 17,2010 9:00 a.m - 6:00 p.m.
TOPIC LEAD Introductions/Purpose of Meeting NRC Discussion of PBNP's planned approach to address PBNP NRC Request for Additional Information Break Continue discussion PBNP Public comment Lunch Continue discussion PBI\\IP Break Continue discussion PBNP Break Continue discussion PBNP Discuss action items and next steps NRC Public comment Adjourn Note: Times are approximate and are subject to change Enclosure
R. Pascarelli
- 2 PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation.
NRC PBNP J. Poole J. Costedio M. Scott F. Flentje J. Lehning T. Kendall S. Smith B. Dunn, et. al.
P. Klein, et. al.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts before Monday, March 15, 2010, 4:00 pm (Eastern Standard Time) to get the telephone number and the pass code.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-266 and 50-301
Enclosure:
Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsOgcMailCenter Resource RidsAcrsAcnw_MailCTR Resource LPL3-1 RtF RidsOpaMail Resource RidsNrrPMPointBeach Resource RidsNrrAdro Resource RidsRgn3MailCenter Resource RidsNrrLABTully Resource RidsNrrDorl Resource VMitlyng, OPA Rill SBagley, OEDO Rill RidsNrrDorLpl3-1 Resource CSteger, NRR PMNS Resource MScott, NRR SSmith, NRR OWFN Receptionist (paper)
Jl.erminq, NRR PKlein, NRR TWFN Receptionist (paper)
ADAMS Accession Number: ML100570454 OFFICE LPL3-1/PM LPL3-1/LA SSIB/BC LPL3-1/BC NAME JPoole BTuily MScott RPascarelli DATE 03/03/10 03/03/10 03/03/10 03/03/10 OFFICIAL RECORD COPY