of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
2.C.(1) Maximum Power Level Florida Power Corporation is authorized to operate the facility at a steady state reactor core power level not in excess of 2609 Megawatts (100 percent of rated core power level).
2.C.(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 229, are hereby incorporated in the license. Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.
The Surveillance Requirements contained in the Appendix A Technical Specifications and listed below are not required to be performed immediately upon implementation of Amendment 149. The Surveillance Requirements shall be successfully demonstrated prior to the time and condition specified below for each.
a)
SR 3.3.8.2.b shall be successfully demonstrated prior to entering MODE 4 on the first plant start-up following Refuel Outage 9.
b)
SR 3.3.11.2, Function 2, shall be successfully demonstrated no later than 31 days following the implementation date of the ITS.
c)
SR3.3.17.1, Functions 1,2, 6, 10, 14, & 17 shall be successfully demonstrated no later than 31 days following the implementation date of the ITS.
d)
SR3.3.17.2, Function 10 shall be successfully demonstrated prior to entering MODE 3 on the first plant start-up following Refuel Outage 9.
e)
SR 3.6.1.2 shall be successfully demonstrated prior to entering MODE 2 on the first plant start-up following Refuel Outage 9.
f)
SR 3.7.12.2 shall be successfully demonstrated prior to entering MODE 2 on the first plant start-up following Refuel Outage 9.
g)
SR 3.8.1.10 shall be successfully demonstrated prior to entering MODE 2 on the first plant start-up following Refuel Outage 9.
h)
SR 3.8.3.3 shall be successfully demonstrated prior to entering MODE 4 on the first plant start-up following Refuel Outage 9.
Amendment No. 229
- 5a -
This page is deleted by Amendment No. 229
- 5b -
This page is deleted by Amendment No. 22,9
Completion Times 1.3 1.3 Completion Times DESCRIPTION However, when a subsequent train, subsystem, component, or (continued) variable, expressed in the Condition, is discovered to be inoperable or not within limits, the Completion Time(s) may be extended.
To apply this Completion Time extension twoý criteria must first be met.
The subsequent inoperability:
- a.
Must exist concurrent with the first inoperability; and
- b.
Must remain inoperable or not within limits after the first inoperability is resolved.
The total Completion Time allowed for completing a Requi red Action to address the subsequent inoperability shall be limited to the more restrictive of either:
- a.
The stated Completion Time, as measured from the initial entry into the Condition, plus an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; or
- b.
The stated Completion Time as measured from discovery of the subsequent inoperability.
The above Completion Time extensions do not apply to those Specifications that have exceptions that allow completely separate re-entry into the Condition (for each train, subsystem, component or variable expressed in the Condition) and separate tracking of Completion Times based on this re-entry.
These exceptions are stated in individual Specifications.
The above Completion Time extension does not apply to a Completion Time with a modified "time zero."
This modified "time zero" may be expressed as a repetitive time (i.e.,
"once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />," where the Completion Time is referenced from a previous completion of the Required Action versus the time of Condition entry) or as a time modified by the phrase "from discovery..
(continued)
Crystal River Unit 3 1.3-2 Amendment No. 229
Completion Times 1.3 1.3 Completion Times EXAMPLES (conti-nued)
EXAMPLE 1.3-3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One A.1 Restore 7 days Function X Function X train train to OPERABLE inoperable.
status.
B. One B.1 Restore 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Function Y Function Y train train to OPERABLE inoperable.
status.
C. One C.1 Restore 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Function X Function X train train to OPERABLE inoperable, status.
AND OR One C.2 Restore 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Function Y Function Y train train to OPERABLE inoperable.
status.
(continued)
Crystal River Unit 3 1.3-6 Amendment No.229
Completion Times 1.3 1.3 Completion Times EXAMPLES EXAMPLE 1.3-3 (continued)
When one Function X train and one Function Y train are i~noperable, Condition A and Condition B are concurrently applicable.
The Completion Times for Condition A and Condition B are tracked separately for each train starting from the time each train was declared inoperable and the Condition was entered.
A separate Completion Time is established for Condition C and tracked from the time the second train was declared inoperable (i.e., the time the situation described in Condition C was discovered).
If Required Action C.2 is completed within the specified Completion Time, Conditions B and C are exited.
If the Completion Time for Required Action A.1 has not expired, operation may continue in accordance with Condition A.
The remaining Completion Time in Condition A is measured from the time the affected train was declared inoperable (i.e.,
initial entry into Condition A).
It is possible to alternate between Condition A, B, and C in such a manner that operation could continue indefinitely without ever restoring systems to meet the LCO.
- However, doing so would be inconsistent with the basis of the Completion Times.
Therefore, there shall be administrative controls to limit the maximum time allowed for any combination of Conditions that result in a single contiguous occurrence of failing to meet the LCO.
These administrative controls shall ensure that the Completion Times for those Conditions are not inappropriately extended.
(continued)
Crystal River Unit 3 1.3-7 Amendment No.229
ECCS - Operating 3.5.2 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.2 ECCS-Operating LCO 3.5.2 Two ECCS trailns, shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, and' 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One Low Pressure A.1 Restore LPI 7 days Injection (LPI) subsystem to subsystem OPERABLE status.
B.
One or more trains B.1 Restore train(s) to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for OPERABLE status.
reasons other than Condition A.
AND At least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available.
C.
Required Action and C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
AND C.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Crystal River Unit 3 3.5-4 Amendment No.229
Reactor Building Spray and Containment Cooling Systems 3.6.6 3.6 CONTAINMENT SYSTEMS 3.6.6 Reactor Building Spray and Containment Cooling Systems LCO 3.6.6 Two reactor building spray trains and two containment cooling trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One reactor building A.1 Restore reactor 7 days spray train building spray train inoperable, to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Compl eti on Time of Condition A AND not met.
B.2 Be in MODE 5.
84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> C. One required C.1 Restore required 7 days containment cooling containment cooling train inoperable, train to OPERABLE status.
(continued)
I.
Crystal River Unit 3 3.6-17 Amendment No. 229
Reactor Building Spray and Containment Cooling Systems 3.6.6 ACTIONS (continued)
I CONDITION REQUIRED ACTION COMPLETION TIME D. One reactor building D.1 Restore reactor 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> spray and one required building spray train containment cooling to OPERABLE status.
train inoperable.
OR D.2 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> containment cool i ng train to OPERABLE status.
E. Two required E.1 Restore one required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> containment cooling containment cooling trains inoperable, train to OPERABLE status.
F. Required Action and F.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Compl eti on Time of Condition C, D, AND or E not met.
F.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> G. Two reactor building G.1 Enter LCO 3.0.3 Immediately spray trains inoperable.
OR Any combination of three required trains inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.6.1 Verify each reactor building spray manual, 31 days power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.
r J
i (continued)
Crystal River Unit 3 3.6-18 Amendment No. 229
EFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Emergency Feedwater (EFW)
System LCO 3.7.5 Two EFW trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3.
ACTIONS NOTE---
LCO 3.0.4.b is not applicable when entering MODE 1.
CONDITION A.
One steam supply to the turbine driven EFW pump inoperable.
REQUIRED ACTION COMPLETION TIME A.1 Restore steam supply to OPERABLE status.
7 days B.
One EFW train inoperable for reasons other than Condition A.
B.1 Restore EFW train to OPERABLE status.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
.' --.,*I*
ýcU(I L i n ued)
Crystal River Unit 3 3.7-9 Amendment No. 229
DC System 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Decay Heat Closed Cycle Cooling Water (DC)
System LCO 3.7.8 Two DC trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2,
3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One DC train A.1
NOTE ------------
7 days inoperable.
Enter applicable Conditions and Required Actions of LCO 3.4.5, "RCS Loops-MODE 4," for required decay heat removal loops made inoperable by DC train inoperability.
Restore DC train to OPERABLE status.
B. Required Action and B.1 Be in Mode 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associ ated Completion Time not met.
AND B.2 Be in Mode 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Crystal River Unit 3-3.7-17 Amendment No.229
Decay Heat Seawater System 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Decay Heat Seawater System LCO 3.7.10 Two Decay Heat Seawater System trains shall be OPERABLE.
APPLICABILITY:
MODES 1, 2,
3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One Decay Heat A.1
NOTE---------- 7 days Seawater System Enter applicable train inoperable.
Conditions and Required Actions of LCO 3.4.5, "RCS Loops-MODE 4," for required decay heat removal loops made inoperable by Decay Heat Seawater System train inoperability.
Restore Decay Heat Seawater System train to OPERABLE status.
B.
Required Action and B.1 Be in Mode 3 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Compl eti on Time not met.
AND B.2 Be in Mode 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Crystal River Unit 3-e t
I. 7-21 Amendment No. 229
AC Sources - Operating 3.8.1 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued)
A.3 Restore required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> offsite circuit to OPERABLE status B.
One EDG inoperable.
B.1 Perform SR 3.8.1.1 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for OPERABLE offsite ciircuit(s).
AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.2 Declare required 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from feature(s), supported discovery of by the inoperable Condition B EDG, inoperable when concurrent with its redundant inoperability of required feature(s) redundant are inoperable, required feature(s)
AND (continued)
Crystal River Unit 3 3.8-2 Amendment No.229
AC Sources - Operating 3.8.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)
B.3.1 Determine OPERABLE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> EDG is not i-noperable due to common cause failure.
OR B.3.2 Perform SR 3.8.1.2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for OPERABLE EDG.
AND B.4 Restore EDG to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status OR 14 days if alternate AC power is available (continued)
Crystal River Unit 3 3.8-3 AAmendment No. 220',
Distribution System - Operating 3.:8.9 3.8 ELECTRICAL POWER SYSTEMS 3.8.9 Distribution Systems-Operating LCO 3.8.9 Train A and Train B AC, DC, and AC vital bus electrical power distribution subsystems shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One AC electrical A.1 Restore AC electrical 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> power distribution power distribution subsystem inoperable, subsystem to OPERABLE status.
B.
One AC vital bus B.1 Restore AC vital bus 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> subsystem inoperable, subsystem to OPERABLE status.
(continued)
Crystal River Unit 3 3.8-31 Amendment No.229
Distribution System - Operating 3.8.9 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C.
One DC electrical C.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power distribution power distribution subsystem inoperable, subsystem to OPERABLE status.
D.
Required Action and D.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Compl eti on Time not met.
AND D.2 Be'in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E.
Two trains with E.1 Enter LCO 3.0.3 Immediately inoperable distribution subsystems that result in a loss of function.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.9.1 Verify correct breaker alignments and 7 days voltage to required AC, DC, and AC vital bus electrical power distribution subsystems.
Crystal River Unit 3 3.8-32 Amendment No.229