Letter Sequence Request |
---|
|
|
MONTHYEARML0810001762008-02-28028 February 2008 Request for Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3) Project stage: Request ML0813604022008-05-30030 May 2008 Environment Assessment Regarding the Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3) Project stage: Approval ML0813603262008-06-0909 June 2008 Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3) Project stage: Approval ML0821706722008-07-16016 July 2008 Report, E11-5690-003, Preliminary Decommissioning Cost Analysis for the Pilgrim Nuclear Power Station. Project stage: Other ML0821703772008-07-31031 July 2008 Transmittal of Report Titled, Preliminary Decommissioning Cost Analysis. Project stage: Request 2008-06-09
[Table View] |
|
---|
Category:Exemption from NRC Requirements
MONTHYEARML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report ML19281D7432020-01-0909 January 2020 FRN, Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19282A0192020-01-0707 January 2020 FRN, Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19281D7402020-01-0606 January 2020 Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19282A0362020-01-0606 January 2020 Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19282A1922020-01-0606 January 2020 Letter, Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance and Amendment No. 14 to Indemnity Agreement No. B-48 ML19142A0602019-12-18018 December 2019 Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19142A0432019-12-18018 December 2019 Letter and Safety Evaluation, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19142A0732019-12-18018 December 2019 Federal Register Notice, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19192A0872019-08-22022 August 2019 FRN, Request to Exempt Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19192A0862019-08-22022 August 2019 Exemption for Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19192A0832019-08-22022 August 2019 Letter, Request to Exempt Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19163A0022019-07-23023 July 2019 FRN, Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19162A3342019-07-22022 July 2019 Letter, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19087A1122019-05-21021 May 2019 Partial Exemption from Record Retention Requirements of 10 CFR 50.71(c), 10 CFR 50.59(d)(3), and 10 CFR 50 Appendix B ML19087A1522019-05-21021 May 2019 Letter, Partial Exemption from Record Retention Requirements of 10 CFR 50.71(c), 10 CFR 50.59(d)(3), and 10 CFR 50 Appendix B ML19088A0502019-03-25025 March 2019 (PNPS) - Request for Exemption from Portions of 10 CFR 50.54(w)(1) ML19088A1272019-03-25025 March 2019 (PNPS) - Request for Exemption from 10 CFR 140.11 (a)(4) ML19050A1912019-02-14014 February 2019 Response to Request for Additional Information - Exemption from the Requirements of 10CFR50.47 and Appendix E to 10CFR50 CNRO-2018-00047, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A)2018-11-16016 November 2018 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) ML17059D7672017-05-16016 May 2017 Pilgrim Nuclear Power Station - FRN, Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler (CAC No. MF9274) ML1006007132010-03-16016 March 2010 Exemption from the Requirements of 10 CFR Part 73, Section 73.55 Implementation Deadline for Physical Security Plans ML1002607162010-01-22022 January 2010 Request for Exemption from Physical Security Requirements (Redacted) ML0813603262008-06-0909 June 2008 Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3) ML0810001762008-02-28028 February 2008 Request for Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3) ML0225505592002-09-12012 September 2002 Exemption from Requirements of 10 CFR Part 20, Section 20.1003 Definition of Total Effective Dose Equivalent (TEDE) 2022-08-29
[Table view] Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
Entergy Nuclear Operations, Inc.
"'EnterWy Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Kevin H. Bronson Site Vice President February 28, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Request for Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3).
LETTER NUMBER: 2.08.014
Dear Sir or Madam:
Pursuant to 10 CFR 50.12, Entergy Nuclear Operations Inc. (Entergy) hereby requests an exemption to the schedule requirement of 10 CFR 50.75(f)(3) that a preliminary decommissioning cost estimate be submitted to the NRC at or about five years prior to the projected end of operations, including an up-to-date assessment of major factors that have the potential to impact the cost to decommission. Specifically, Entergy requests an exemption to allow for the completion and submittal of this document by August 1, 2008, which is approximately 4 years from the expiration date of the current operating license.
The attachment to this letter provides the rationale and justification for the exemption request.
The current expiration date of Pilgrim operating license is June 8, 2012. However, it should be noted that Entergy is in the process of seeking NRC approval for a 20-year extension to this license.
This letter contains no regulatory commitments.
If you have any questions or require additional information, please contact Joseph R. Lynch at (508) 830-8403.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the __rro_ 4,k of 2008.
Sincerely,
£524\4t14-6 A4OD(
Entergy Nuclear Operations, Inc. Letter Number: 2.08.014 Pilgrim Nuclear Power Station Page 2 Attachments: 1. Entergy Application for Exemption from the Schedule Requirement of 10 CFR 50.75(f)(3). (3 pages) cc: Mr. James S. Kim, Project Manager Mr. Robert Walker, Director Plant Licensing Branch I-1 Massachusetts Department of Public Health Division of Operator Reactor Licensing Schrafft Center Suite 1 M2A Office of Nuclear Reactor Regulation Radiation Control Program U.S. Nuclear Regulatory Commission 529 Main Street One White Flint North 4D9A Charlestown, MA 02129 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 Mr. John Giarusso Jr.
U.S. Nuclear Regulator Commission Nuclear Preparedness Manager 475 Allendale Road Mass. Emergency Management Agency King of Prussia, PA 19406 400 Worcester Road Framingham, MA 01702 Senior Resident Inspector Pilgrim Nuclear Power Station
ATTACHMENT 1 Enterqy Application for Exemption from the Schedule Requirement of 10 CFR 50.75(f)(3).
(3 Pages)
Attachment 1 to Letter 2.08.014 Page 1 of 3 d"
Entergv Application for Exemption from the Schedule Requirement of 10 CFR 50.75(f)(3).
Specific Exemption Requested Entergy Nuclear Operations, Inc. (Entergy) owns and operates Pilgrim Nuclear Power Station (Pilgrim) in Plymouth, Massachusetts. The current Operating License for Pilgrim expires on June 8, 2012.
Pursuant tol0 CFR 50.12, Entergy hereby requests an exemption to the schedule requirement of 10 CFR 50.75(f)(3) that a preliminary decommissioning cost estimate be submitted to the NRC "at or about five years prior to the projected end of operations," including an up-to-date assessment of the major factors that have the potential to impact the cost of decommissioning.
Specifically, Entergy requests an exemption to allow for the preparation, review, and submittal of this cost estimate document by August 1, 2008, which is approximately 4 years from the expiration date of the current operating license. This request only applies to the timing requirements for submittal of these documents and does not seek exemption from any of the material requirements of the regulations.
Circumstances Necessitating the Exemption Request Entergy submitted a license renewal application (LRA) for Pilgrim in a letter dated January 25, 2006, approximately 6.5 years prior to the expiration date for Pilgrim Station. The NRC staff issued the final supplemental environmental impact statement (SEIS) on July 27, 2007 and final safety evaluation report (SER) on June 28, 2007. Entergy anticipates that the NRC will render a final decision on the Pilgrim LRA on or about August 1, 2008, 30 months from submittal of the application. August 2008 is approximately 4 years prior to expiration of the current operating license.
In the proposed rulemaking for nuclear power plant license renewal published in the Federal Register [55 FR 29043 Jul 17, 1990], the NRC indicated that "the Commission does not believe that licensees who file their license renewal applications should also be required to proceed as if their facility will be decommissioned at the expiration of the current operating license." The NRC further indicated that the development and submittal of the information required by 10 CFR 50.75(f)(3) (at that time, the specific regulation was 10 CFR 50.75(f)(2)) would require substantial resources that would be wasted ifthe LRA is approved. The NRC also indicated that "the Commission does not believe that any change to 10 CFR 50.75(f) is necessary, since the current wording may be interpreted to exclude licensees who have filed an LRA from the requirements for submission of the interim funding reports."
Entergy concurs with the Commissions belief put forth in the proposed rulemaking that complying with the requirements of 10 CFR 50.75(f)(3) would require significant resources on the part of both Entergy and the NRC at a time when significantresources in both organizations are being expended on the review of the Pilgrim LRA. Further, the preliminary decommissioning cost estimate would be essentially outdated upon approval of the LRA.
In the final rule for nuclear power plant license renewal published in the Federal Register [56 FR 64943, 64968 Dec 13, 1991], the Commission determined that a waiver of the spent fuel management plan and the preliminary decommissioning plan will not automaticallybe provided for plants seeking license renewal. The Commission believes that prudent planning for decommissioning is appropriate and that the waiver of the requirements for preliminary
Attachment 1 to Letter 2.08.014 Page 2 of 3 decommissioning, absent a clear indication that the license will be renewed, would appear to predetermine the outcome of the LRA. The Commission determined that some planning for the possibility that a plant would have to decommission (i.e., the application is denied) is still appropriate. However, the final rule also discusses that the exemption process provided by 10 CFR 54.15 is available to a renewal applicant who would like to seek relief from the need to submit both license renewal and decommissioning information. This exemption request complies with the provisions of 10 CFR 54.15.
The NRC review of the Pilgrim LRA has been underway for over two years and the NRC staff issued the final supplemental environmental impact statement (SEIS) and final safety evaluation report (SER) in mid-2007. Entergy recognizes that the SEIS and SER do not guarantee LRA approval but Entergy believes the level of review accomplished to date, and the achievement of these significant milestones, represent a clear indication that the Pilgrim LRA would be ultimately approved. Entergy also believes that at this time planning for decommissioning is not necessarily appropriate or timely because there is no clear indication present that the LRA would be denied.
Entergy hereby applies for an exemption to the schedule requirements in 10 CFR 50.75(f)(3) to refocus resources and allow Entergy to delay submitting the documents required by these regulations to allow the proper time to prepare, review and submit the cost estimate. On this basis, Pilgrim would submit to the NRC the documents as required by 10 CFR 50.75(f)(3) no later than August 1, 2008, which is approximately four years prior to the expiration date of the current operating license and Entergy believes is in within interpretation of the regulation.
Satisfaction of Specific Exemption Criteria Pursuant to 10 CFR 50.12, an exemption will be granted if it is authorized by law; will not present an undue risk to the public health an safety; is consistent with the common defense and security; and is supported by one or more of the special circumstances identified in 10 CFR 50.12(a)(2). The requested exemption is authorized by law because the underlying requirement is established by an NRC rule for which an exemption may be granted as presented in 10 CFR 54.15. Furthermore, the requested exemption will not present an undue risk to public health and safety and is not inconsistent with the common defense and security because it seeks exemption from the timing for submittal of certain information with no material change to the.
information that will be submitted. The special circumstance identified in 10 CFR 50.12(a)(2)(ii) is applicable, as described below.
Special circumstance 10 CFR 50.12(a)(2)(ii) states that application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.
By comparison to review time for a sufficient LRA, the final rule for nuclear power plant license renewal published in the Federal Register [56 FR 64943, 64962 Dec 13, 1991] estimated that two years is an adequate amount of time for the NRC to technically review a sufficient LRA.
Any necessary hearings could likely add a year or so such that the NRC could reasonably render a decision on a sufficient LRA within approximately three years from the date the LRA was submitted. However, for consistency with the schedule requirements of other regulations related to decommissioning, the NRC in the final rule changed the timing provision for submittal of a sufficient LRA to no less than five years prior to expiration of the existing operating license.
The requirement to submit a sufficient LRA five or more years prior to expiration date of the
Attachment 1 to Letter 2.08.014 Page 3 of 3 existing operating license does not reflect the actual time to complete a final determination on a sufficient LRA.
The NRC has demonstrated that their estimate of three years to review an LRA and issue a renewed license is a sufficient period of time. Renewed operating licenses have been issued for Calvert Cliffs Nuclear Power Plant Units 1 and 2, Oconee Nuclear Station Units 1, 2 and 3, Arkansas Nuclear One Unit 1, and Edwin I. Hatch Nuclear Plants Units 1 and 2 all within three years from submittal of their LRAs.
Given the size and complexity of a LRA and the associated review and hearing processes, Entergy believes that by comparison it is reasonable that the information submitted pursuant to 10 CFR 50.75(f)(3) could be reviewed and approved by the NRC at a time consistent with the LRA approval which Pilgrim is projecting to be August 1, 2008.
Entergy believes that allowing Pilgrim a delay in the schedule for submitting the information required by 10 CFR 50.75(f)(3) is appropriate based on the current status of the Pilgrim LRA, and consistent with the latitude provided in the definition of the regulation. Therefore, submittal of the information required by 10 CFR 50.75(f)(3) five or more years prior to the expiration date of the existing operating license is not necessary to achieve the underlying purpose of those rules.