NEI 99-04, McGuire Units 1 & 2, Annual Commitment Change Report

From kanterella
(Redirected from ML080850559)
Jump to navigation Jump to search
McGuire Units 1 & 2, Annual Commitment Change Report
ML080850559
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/12/2008
From: Hamilton B H
Duke Energy Carolinas, Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NEI 99-04
Download: ML080850559 (3)


Text

Duke BRUCE H HAMILTON Ener Vice President McGuire Nuclear Station Duke Energy Corporation MG01 VP / 12700 Hagers Ferry Road Huntersville, NC 28078 704-875-5333 704-875-4809 fax bhhamnilton@duke-energy.

com March 12, 2008 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Duke Power Company LLC dlb/a Duke Energy Carolinas, LLC (Duke)McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Annual Commitment Change Report Attached is a summary report of commitment changes for McGuire Nuclear Station completed during the 2007 calendar year. These changes were made per the guidance defined in NEI 99-04, "Guidelines for Managing NRC Commitments" and have no adverse effect on compliance with NRC rules or regulations.

Questions regarding this submittal should be directed to Kay Crane, McGuire Regulatory Compliance at (704) 875-4306.Bruce H. Hamilton www. duke-energy, corn U. S. Nuclear Regulatory Commission March 12, 2008 Page 2 xc: Mr. Victor M. McCree, Acting Regional Administrator U. S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 Mr. J. F. Stang (Mail Stop 0-8 H 4A)U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC 20555-0001 Mr. Joe Brady NRC Senior Resident Inspector McGuire Nuclear Station CCEF Source Commitment Description New Commitment Number Document 2007-M-0002 NRC Letter Run maximum number of Run maximum number of dated reactor coolant pumps during reactor coolant pumps during August 3, crud burst crud burst OR crud burst will 2004 be initiated after cooldown to a reasonable point, all reactor coolant pumps have been secured and reactor coolant system level has been lowered below 84 inches.2007-M-003 Duke Letter Duke's letter commits to ANSI The Occupational Physical dated July B30.2-1976 for crane operator Examination Requirements for 26, 1982 training and qualification Crane Operators, Guideline (which includes physical and MS-204 Revision 3 dated mental qualifications).

ANSI August 30, 2007 was 30.2, Section 2-3.1.2 (b.1), implemented on August 31, specifies the Snellen method 2007.for test of visual acuity.2007-M-004 Duke Letter Section 5.1.4 states in part: Section 5.1.4 is changed to state dated "Procedures for the removal or in part: "Procedures for the January 31, movement of equipment removal or movement of 1985 associated with special lifting equipment associated with devices were developed or special lifting devices were incorporated in the procedures developed or incorporated in for work on that equipment.

the procedures for work on that The operating procedure does equipment.

The operating not outline maintenance of the procedure does not outline devices, however, there is a maintenance of the devices, yearly preventative however, there is preventative maintenance which covers maintenance prior to use at the inspection, beginning of an outage which covers inspection."