Text
February 29, 2008 Mr. Peter P. Sena III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION RE: THE 2006 STEAM GENERATOR INSPECTION REPORT (TAC NO. MD7489)
Dear Mr. Sena:
By letter dated February 2, 2007, FirstEnergy Nuclear Operating Company submitted information related to the 2006 steam generator (SG) inspections and SG examination results for tubes in the A, B, and C steam generators for Beaver Valley Power Station, Unit No. 2.
The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The NRC staff is requesting a response to the RAI within 30 days of receipt.
Please contact me at (301) 415-1016, if you have any questions regarding this issue.
Sincerely,
/RA/
Nadiyah S. Morgan, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-412
Enclosure:
RAI cc w/encl: See next page
- See memo dated February 1, 2008 OFFICE LPLI-1/PM LPLI-1/LA DCI/CSGB/BC DORL/LPLI-1/BC NAME NMorgan SLittle AHiser*
MKowal DATE 2/29/08 2/28/08 02/01/2008 2/29/08
Beaver Valley Power Station, Unit Nos. 1 and 2 cc:
Joseph J. Hagan President and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 David W. Jenkins, Attorney FirstEnergy Corporation Mail Stop A-GO-18 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44333 Ohio EPA-DERR ATTN: Zack A. Clayton P.O. Box 1049 Columbus, OH 43266-0149 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, Ohio 44333 Manager, Site Regulatory Compliance FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-A P.O. Box 4, Route 168 Shippingport, PA 15077 Commissioner James R. Lewis West Virginia Division of Labor 749-B, Building No. 6 Capitol Complex Charleston, WV 25305 Director, Utilities Department Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573 Director, Pennsylvania Emergency Management Agency 2605 Interstate Dr.
Harrisburg, PA 17110-9364
Beaver Valley Power Station, Unit Nos. 1 and 2 (continued) cc:
Dr. Judith Johnsrud Environmental Coalition on Nuclear Power Sierra Club 433 Orlando Avenue State College, PA 16803 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Mayor of the Borough of Shippingport P.O. Box 3 Shippingport, PA 15077 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 298 Shippingport, PA 150
Enclosure REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE 2006 STEAM GENERATOR INSPECTION REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.
OHIO EDISON COMPANY THE TOLEDO EDISON COMPANY BEAVER VALLEY POWER STATION, UNIT NO. 2 DOCKET NO. 50-412 By letter dated February 2, 2007 (ADAMS Accession No. ML070360529), FirstEnergy Nuclear Operating Company (licensee) submitted information summarizing the results of the 2006 steam generator (SG) tube inspections at Beaver Valley Power Station, Unit No. 2 (BVPS-2). These inspections were performed during the twelfth refueling outage (2R12). In addition to this report, the Nuclear Regulatory Commission (NRC) staff summarized a conference call about the 2006 SG tube inspections at BVPS-2 in a letter dated November 9, 2006 (ADAMS Accession No. ML063100291). In order to complete the review, the NRC staff needs the following additional information:
- 1.
For the tube located at Row 36 Column 18 of SG B, listed on page B-18 of Attachment B to the February 2, 2007, letter, please provide the percent through wall measurement of the volumetric indication.
- 2.
As stated on page A-6 of Attachment A to the February 2, 2007, letter, please provide the cumulative number of indications detected in the tubesheet region as a function of elevation within the tubesheet.
- 3.
During the October 12, 2006, conference call, the licensee provided the scope and results of the secondary side inspection in SG B, but inspection of SG C had not yet commenced. If you could provide similar information for SG C, that would be fine. We are looking for a high level summary of your inspections and results.
See Question 10 in Attachment 1 of the NRC staffs letter dated November 1, 2006 (ADAMS Accession No. ML063060284).
- 4.
You indicate that two tubes (one tube in SG A and one tube in SG B) were plugged for data quality reasons. Please discuss how tube integrity was determined at the locations where the data quality was in question (e.g., were the tubes still able to be inspected or were they in-situ pressure tested).
- 5.
Attachment B to the February 2, 2007, letter, which lists tubes with indications of service induced degradation, includes many tubes that were not plugged. Please confirm that there are no degradation/flaws for those tubes listed as distorted support plate signal
2 with possible indication, non-quantifiable indication, and dent/ding with an indication (i.e.,
the only tubes with flaws are listed as percent through wall, single volumetric indication, single circumferential indication, multiple circumferential indication, and single axial indication).