January 31, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 - CLOSURE OF CONFIRMATORY ACTION LETTER NRR-07-016 (TAC NO. MD4145)
Dear Mr. Young:
On March 27, 2007, the Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070800327) regarding dissimilar metal welds in the pressurizer at Crystal River Unit 3. This letter acknowledges receipt of your letter dated January 24, 2008 (ADAMS Accession No. ML080280064), informing the NRC of actions taken in response to this CAL.
In your letter, you stated that Crystal River Unit 3 satisfactorily completed structural weld overlays for all Alloy 600/82/182 pressurizer butt weld locations during Refueling Outage 15 in the fall of 2007. Further, you stated that ultrasonic examinations of the applied overlay and adjacent base material were accomplished utilizing personnel and procedures qualified in accordance with American Society of Mechanical Engineers Code Section XI, 1995 Edition including Addenda through 1996, Appendix VIII, Supplement 11, with alternatives used to comply with the Performance Demonstrative Initiative Program. These examinations obtained 100-percent coverage of both the preservice inspection and inservice inspection examination volumes for each weld and identified no reportable indications.
Based on your letter, the NRC has found that all the commitments listed in the CAL and supporting commitment letters dated January 29 and February 22, 2007 (ADAMS Accession Nos. ML070320122 and ML070570118, respectively), have been met. No further response is required regarding the CAL. We consider the CAL closed. As such, it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system. This action closes TAC No. MD4145.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
/RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-302 cc: See next page
ML080300575 NRR-106 OFFICE DCI/CPNB DCI/CPNB LPLII-2/PM LPL II-2/LA LPL II-2/BC NAME JCollins TChan SBailey BClayton TBoyce DATE
/ /
/ /
/ /
01/30/08
/ /
OFFICE DCI/D DRP/D RII DORL/D NAME MEvans JShea by e-mail CHaney DATE
/ /
01/30/08
/ /
Florida Power Corporation Crystal River Nuclear Plant, Unit 3 cc:
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Ms. Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 David T. Conley Associate General Counsel II - Legal Dept.
Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Mr. Daniel L. Roderick Vice President, Nuclear Projects &
Construction Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. David Varner Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708