MONTHYEARML24219A2082024-08-0606 August 2024 Ile Form 5.1-1 Postexamination Check Sheet IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 ML24173A1272024-06-12012 June 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter ML24173A1802024-06-12012 June 2024 Ile Post Exam Comments ML24173A1792024-06-12012 June 2024 Ile Form 2.1-1 Examination Prep Checklist ML24173A1782024-06-12012 June 2024 Ile Form 1.3-1 Examination Security Agreement ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 ML24173A1552024-05-14014 May 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24173A1562024-05-0202 May 2024 Ile Form 2.3-4 Written Examination Quality Checklist SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter ML24173A1262024-01-23023 January 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML24173A1252024-01-23023 January 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21281A1242021-10-0808 October 2021 GFE Results, September 2021 IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3102021-05-0505 May 2021 2021 QC Ile Proposed Simulator and Inplant JPMs ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3122021-05-0505 May 2021 2021 QC Ile Proposed Written Exam-RO and SRO 2024-08-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24219A2082024-08-0606 August 2024 Ile Form 5.1-1 Postexamination Check Sheet IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 ML24173A1792024-06-12012 June 2024 Ile Form 2.1-1 Examination Prep Checklist SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter ML24173A1272024-06-12012 June 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24173A1782024-06-12012 June 2024 Ile Form 1.3-1 Examination Security Agreement ML24173A1802024-06-12012 June 2024 Ile Post Exam Comments ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 ML24173A1552024-05-14014 May 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24173A1562024-05-0202 May 2024 Ile Form 2.3-4 Written Examination Quality Checklist SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter ML24173A1252024-01-23023 January 2024 Ile Form 2.3-1 Examination Outline Quality Checklist ML24173A1262024-01-23023 January 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23216A0362023-08-0707 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23079A2262023-03-20020 March 2023 Form 5.1-1 Post-Examination Check Sheet (Quad Cities, 2023) IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23079A2222023-02-21021 February 2023 Form 2.1-1 Examination Preparation Checklist ML23079A2192023-02-21021 February 2023 Form 1.3-1 Exam Security Agreement SVP-23-007, Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023)2023-02-0909 February 2023 Licensee Post-Exam Submittal Letter (SVP-23-007, Quad Cities, 2023) ML23079A2282023-02-0808 February 2023 Post-Exam Review Comments (None) ML23020A4132023-01-23023 January 2023 Operator License Examination Approval - Quad Cities Nuclear Power Station, January 2023 ML23079A2072023-01-13013 January 2023 Form 2.3-4 Written Examination Quality Checklist (Quad Cities, 2023) ML23079A2042023-01-13013 January 2023 Form 2.3-2 Operating Test Quality Checklist (Quad Cities, 2023) ML23079A2032022-11-11011 November 2022 Licensee Proposed Exam Cover Letter (SVP-22-065, Quad Cities, 2023) ML23079A0432022-10-17017 October 2022 Form 2.3-1 Examination Outline Quality Checklist (Quad Cities, 2023).pdf ML23079A0842022-10-17017 October 2022 Form 3.4-1 Events and Evolutions Checklist (Quad Cities, 2023) ML23079A0272022-10-0505 October 2022 Licensee Outline Submittal Email (Quad Cities, 2023) ML22188A1752022-07-11011 July 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 ML22192A2052021-07-0909 July 2021 2021 QC Ile ES-401-9 Written Examination Review Worksheet-Final ML22192A2062021-07-0909 July 2021 2021 QC Ile Outline Submittal Comments ML22192A2032021-07-0909 July 2021 2021 QC Ile ES-301-7 Operating Test Review Worksheet-Final ML22192A1922021-07-0909 July 2021 2021 QC Ile ES-201-1 ML22192A2042021-07-0909 July 2021 2021 QC Ile ES-401-4 Rejected KAs ML22192A1932021-07-0909 July 2021 2021 QC Ile ES-201-3 Security Agreement-Final ML22192A1952021-07-0909 July 2021 2021 QC Ile ES-403-1 Written Exam Quality Checklist ML22192A1962021-06-22022 June 2021 2021 QC Ile Post-Exam Submittal Letter-06-22-2021 ML22193A1072021-06-14014 June 2021 2021 QC Ile Administered Simulator Scenarios-Final ML22193A2872021-06-14014 June 2021 2021 QC Ile Administered RO and SRO List of Reference Handouts-Final ML22193A0932021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Admin JPMs-Final ML22193A2862021-06-14014 June 2021 2021 QC Ile Administered RO and SRO Written Exam-Final ML22193A1052021-06-14014 June 2021 2021 QC Ile Administered Simulator and Inplant JPMs-Final ML21152A1022021-06-0202 June 2021 Operator Licensing Examination Approval ML22193A3112021-05-0505 May 2021 2021 QC Ile Proposed Simulator Scenarios ML22193A3012021-05-0505 May 2021 2021 QC Ile ES-301-6 Competencies Checklist ML22193A2992021-05-0505 May 2021 2021 QC Ile ES-301-3 Operating Test Quality Checklist ML22193A3002021-05-0505 May 2021 2021 QC Ile ES-301-4 Simulator Scenario Quality Checklist 2024-08-06
[Table view] |
Text
LlCENSEElNRC COMMENTS TO THE PROPOSED OPERATING TEST FOR THE QUAD CITIES NUCLEAR POWER STATION INITIAL EXAM -JUNE 2007
Operating Test Comments Changes to JPMs as a result of Licensee andlor NRC comments after JPM develoDment:
Admin JPM, Conduct of Operations, Recognize Degraded Voltage Conditions, for both RO and SRO: Deleted this JPM since there was no way to limit the candidates Technical Specification review. (Condition chosen resulted in cascading Technical Specifications). Additionally, there was no reviewing or completion of paperwork associated with this JPM. Replaced this JPM with an SRO review of Electrical Distribution Surveillance Test. SRO applicants had to identify abnormal conditions in the completed ST.
Control Room JPM d, Start RClC and Control Reactor Water Level JPM was replaced since it had the same Safety Function as JPM b, Roll the Main Turbine. Replaced the RClC JPM with Quarterly Testing of Turbine Stop Valves.
Control Room JPM e, Bypass the Rod Worth Minimizer was replaced since this function was duplicated as subsequent actions during scenario instrument malfunctions. Replaced this JPM with Installation of Jumpers to Bypass Group 1 MSlV Isolation Signal.
In-Plant JPM i, Locally Start-up HPCl System to Control RPV Level was replaced since this task was on the candidates audit exam. Replaced this JPM with JPM to Perform 10-minute to de-energize safety-related bus. (Actions for QCARPs - Fire procedures).
On ALL JPMs:
Deleted the JPM Validation Checklist page since not used for NRC-generated exam.
On ALL Simulator JPMs:
Inserted simulator Malfunction codes and IC Setup instructions for all Simulator JPMs.
Modified cue sheet given to operators since this cue sheet did not match the cue sheet read by the examiners to the candidates.
Control Room Simulator JPM a: Added cue for examiner to time MSlV stroking 'light-to-light' time since surveillance procedure was changed to add this additional timing requirement.
Control Room Simulator JPM b: Roll the Main Turbine. Eliminated cues provided to the candidate regarding turbine vibration since turbine vibration is now displayed on control panels.
Control Room Simulator JPM c: Perform SBGT Surveillance Test with Failure of Heater to De-energize. Reduced the scope of this JPM to shutdown SBGT system with failure of heater to de-energize to reduce run time of this JPM.
Control Room Simulator JPM f: Shutdown the U1 EDG with early trip. Reduced scope of initial conditions to eliminate confusion.
In-Plant JPM k, Shift RBCCW Heat Exchangers: Modified cues to more accurately describe valve position (via rising stem valves), and venting via a sight glass (not a vent line).
Admin JPM 1 (RO), Review Thermal Limits: Changed steps in JPM due to deletion of FDLRX thermal limit and resultant licensee procedure change.
Admin JPM 2 (RO & SRO), Review Overtime Schedule: Added Jared as a individual that would exceed 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> requirement.
Admin JPM 3 (RO i3 SRO), Isolate Safe Shutdown Makeup Pump: Added a critical step for mechanical isolation of system since when working on pump/motor mechanical coupling, if mechanical system was not isolated and dlp was sufficient, pump could spin motor.
Admin JPM 5 (SRO), OPRM Trip, Classify Event: Added completion of a NARS form to ensure candidates was credited for creating paper work for this JPM.
Chanaes to Scenarios as a result of Licensee and/or NRC comments after develoment:
SCENARIO 1 Event 3, Fail LPRM Downscale. Changed setup conditions (to increase the number of inoperable LPRMs) to ensure that this was a Tech Spec entry. As written originally, there would be a review of TS but no entry into TS.
Event 4, Fail EHC Pressure Regulator Down Scale. Eliminated this I/C failure for the BOP since crew adjusted turbine pressure regulator set away from limit. When the failure was put in, the resulting condition would not result in an annunciator and the plant would quickly recover without the operators noticing the high pressure transitory condition.
Event 5, RWCU Area Hi Temperature. This event was eliminated since it was not needed to meet crew composition and we could still meet the bean count.
Event 8, Drywell Spray Failure. Eliminated this event as an I/C for all since there were no actions for recovery. Instead, included this as part of the major.
Net effect of incorporating comments for Events 4 and 8 above was to eliminate 1 I/C for the BOP operator (event 5). This should not be a problem due to crew composition, the three crews will see 3 scenarios. So the BOP position will see at least 3 I/C events.
SCENARIO 2 Added items to the initial conditions to make the scenario more realistic. Changed inoperable system from RHRSW to Core Spray system to set up a cascading Tech Spec later in the scenario.
Event 1, Transfer Aux Power. This Normal event was not needed due to crew composition.
We still met the minimum number of competencies for each candidate.
Event 4, Feedwater Regulator Lockup. Removed event since it could not be modeled on the simulator. Additionally, this was similar to a JPM.
Event 4 (Revd), Unit 1 EDG Lube Oil Leak. This event resulted in entry into different Tech Specs than originally intended due to change in Core Spray system being inoperable.
Event 5, Rod Drift. Removed event and placed in Scenario 3
Event 6, Recirculation Suction Line Break. Added this event since the previous 'major' (Station Blackout) did not result in getting into emergency operating procedures.
SCENARIO 3 Event 1, Replaced events. Eliminated Swap 3-Element FW control for Start SBGT system since changing 3 element control for FW using a digital system did not produce any change in water level. No challenge to operators.
Event 2, RHRSWP Inoperable. Changed return to service event since this was not realistic.
The scenario was not a reasonable place to address return to system operability due to time restraints.
Event 4, Rod Drift. Added to scenario to increase I/C for ATC operator Event 5, Loss of Power to Bus 18, Failure of EDG to Start. Added additional items that the BOP operator needs to do to get credit for this event as IIC.
Event 6, Loss of Stator Water Cooling to Main Generator. Added cue of 0.1 umho/cm to prevent crew from tripping unit. This will ensure that the ATC operator will insert control rods.
This event takes credit for reactivity event.
Event 7, Main Steam Line Break with Failure of Group 1 to actuate. Changed the steps on the D-2 sheets to reflect actual operator actions taken as observed during onsite validation week.
SCENARIO 4 Event 1, Start 1B Recirc pump. This event was changed to a Normal for the BOP and we added lowering the 1A recirc pump to match 1B speed as the reactivity change.
Event 2, EDG Monthly Test. Changed normal events from EDG Test to Service Water Pump swap since EDG has already been included in previous scenarios. Also, trying to reduce run time for this scenario. Later eliminated SWP swap as a normal and replaced it with starting the recirc pump.
Event 3, OPRM inoperability. Changed this event to effect all OPRMs not just one, so it drives SRO into Tech Specs. Previous loss of EDG Test reduced Tech Spec reviews to one. Also, this event was labeled as I/C for ATC operator. This is no longer applicable for the operator.
Event 4, Rod Drift. This event was slightly modified since the candidates had a rod drift on their audit exam.
Event 6, Trip of B RFP with Failure of Standby RFP to Start. This event was added as an I/C for the ATC operator since a change in Event 3 eliminated actions for ATC operator.
Event 7, Major event. Reduced number of equipment failures during major since it was not a probable event. This event was generated from licensee's exam bank. NRC exams have different requirements for multiple equipment failures. Entries on D-2 sheets for this event were taken from actions observed during crew validation week.