Letter Sequence Other |
---|
|
|
MONTHYEARML0706701742007-03-0606 March 2007 License Amendment Request - Proposed Change to Technical Specifications Regarding Main Steam Isolation Valve Leakage Project stage: Request ML0718702352007-07-11011 July 2007 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (TAC Nos. MD4823 and MD4824 Project stage: Other ML0719801982007-07-17017 July 2007 Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (TAC MD4823 & MD4824) Project stage: Other ML0726003152007-09-14014 September 2007 Technical Specification Pages Re Main Steam Isolation Valve Leakage Project stage: Other ML0726001892007-09-14014 September 2007 Technical Specification Pages Re Main Steam Isolation Valve Leakage Project stage: Other ML0724707232007-09-14014 September 2007 Issuance of Amendments Main Steam Isolation Valve Leakage Project stage: Approval 2007-07-11
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellations Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Va ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 RS-20-016, County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems2020-04-13013 April 2020 County, Nine Mile Point, Peach Bottom Atomic and Quad Cities - Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Systems ML19266A6222019-10-29029 October 2019 Issuance of Amendment Nos. 328 and 331 Revising Technical Specifications 3.81, AC Sources - Operating, for a One-Time Extension of Completion Time ML19182A0062019-08-28028 August 2019 Issuance of Amendment Nos. 327 and 330 Reduce High Pressure Service Water System Design Pressure and Temporarily Extend Completion Times ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML18263A2322018-10-25025 October 2018 Issuance of Amendment Nos. 321 and 324 to Adopt 10 CFR 50.69 (CAC Nos. MG0181 and MG0181; EPID L-2017-LLA-0281) ML18249A2402018-09-28028 September 2018 Issuance of Amendment Nos. 320 and 323 Regarding the Adoption of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML18257A0172018-09-14014 September 2018 Response to Request for Additional Information Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite Update to ... ML18173A0422018-06-23023 June 2018 Issuance of Amendment Nos. 318 & 321 to Revise Technical Specifications 3.8.1 and 3.8.3, One-Time Change Suspending EDG Surveillance Test Completion Requirements (Emergency Situation) RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML16217A0082016-08-11011 August 2016 Correction to Amendment Nos. 308 and 312 Regarding Surveillance Requirements for High Pressure Coolant Injection System and Reactor Core Isolation Cooling System ML16162A1012016-06-0909 June 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Emergency Diesel Generator Fuel Oil Transfer Surveillance Requirements ML16084A9682016-05-0909 May 2016 Issuance of Amendments Inservice Leak and Hydrostatic Testing Operation ML16034A3722016-03-21021 March 2016 Issuance of Amendments Maximum Extended Load Line Limit Analysis Plus ML15343A1772016-02-0808 February 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15350A1792016-02-0101 February 2016 Issuance of Amendments Secondary Containment Access Openings ML15275A2652015-10-0202 October 2015 License Amendment Request, Proposed Changes to the Technical Specifications for High Pressure Coolant Injection and Reactor Core Isolation Cooling Surveillance Test Pressure and Clarification of Surveillance Requirements ML15196A5592015-09-0808 September 2015 Issuance of Amendments Extension of Type a and Type C Leak Rate Test Frequencies ML15189A1852015-08-11011 August 2015 Issuance of Amendment No. 305 Change to Replacement Steam Dryer License Condition ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15167A4562015-07-28028 July 2015 Issuance of Amendments Eliminate Main Steam Line Radiation Monitor Trip and Isolation Function ML15162A1392015-07-17017 July 2015 Issuance of Amendments Revise Technical Specification Definition for Recently Irradiated Fuel ML15154A6142015-06-30030 June 2015 Issuance of Amendments Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15093A0532015-03-27027 March 2015 (PBAPS) Unit 1 Decommissioning Status Report - 2014 ML14363A2272015-03-11011 March 2015 Issuance of Amendments Revise Facility Operating License and the Technical Specifications to Incorporate Administrative Changes ML15055A5062015-02-23023 February 2015 License Amendment Request - Proposed Changes to the Technical Specifications to Address Administrative Control of Secondary Containment Access Openings ML15041A6302015-02-19019 February 2015 Correction to Amendments Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14247A5242014-09-0303 September 2014 License Amendment Request Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Trip and Isolation Function ML14163A5892014-07-28028 July 2014 Issuance of Amendments Delete Non-Conservative Note from Limiting Condition for Operation 3.5.1 ML14192B1432014-07-11011 July 2014 License Amendment Request to Revise Facility Operating License and the Technical Specifications to Incorporate Administrative Changes ML14136A4852014-06-0505 June 2014 Issuance of Amendments Revise Normal Heat Sink Operability Requirements ML14160A6992014-06-0505 June 2014 Extended Power Uprate License Amendment Request - Supplement 27 Supplemental Information ML14079A1022014-05-0505 May 2014 Issuance of Amendments Safety Relief Valve and Safety Valve Lift Setpoint Tolerance ML14099A5372014-04-0808 April 2014 Response to Request for Additional Information - Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature ML14092A3152014-03-28028 March 2014 Decommissioning Status Report for 2013 ML13109A4632013-06-18018 June 2013 Issuance of Amendments Revise Technical Specifications to Add Residual Heat Removal System Drywell Spray Function Requirements ML13018A2252013-01-17017 January 2013 Response to Request for Additional Information - Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature ML12286A0122012-09-28028 September 2012 License Amendment Request - Extended Power Uprate ML12243A2862012-08-29029 August 2012 License Amendment Request to Add LCO 3.0.8 on the Lnoperability of Snubbers Using the Consolidated Line Item Improvement Process ML12200A3882012-07-18018 July 2012 Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature ML1130814412011-11-0303 November 2011 License Amendment Request - Use of Neutron Absorbing Inserts in Spent Fuel Pool Storage Racks ML1116001802011-06-0808 June 2011 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 2023-08-30
[Table view] |
Text
(5) Exelon Generation Company, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not to separate, such byproduct and special nuclear material as may be produced by operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified below:
(1) Maximum Power Level Exelon Generation Company is authorized to operate the Peach Bottom Atomic Power Station, Unit 2, at steady state reactor core power levels not in excess of 3514 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.263 are hereby incorporated in the license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications.
(3) Physical Protection Exelon Generation Company shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans 1 , submitted by letter dated May 17, 2006, is entitled: "Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 3." The set contains Safeguards Information protected under 10 CFR 73.21.
(4) Fire Protection The Exelon Generation Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report for the facility, and as approved in the NRC Safety Evaluation Report (SER) dated May 23, 1979, and Supplements dated August 14, September 15, October 10 and November 24, 1980, and in the NRC SERs dated September 16, 1993, and August 24, 1994, subject to the following provision:
The Exelon Generation Company may make changes to the approved 1The Training and Qualification Plan and Safeguards Contingency Plan are Appendices to the Security Plan.
Renewed Lcense N,. DEPR-44 Revised by letter dated--ctober 28, 2004 Rlevised by letter dated May 29, 2007-3 Amendment No. 2 6 -
Page 3
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.1.3.14 Verify combined main steam line leakage In accordance rate is ! 46 scfh when tested at with the 25 psig. Primary Containment Leakage Rate Testing Program SR 3.6.1.3.15 Verify each 6 inch and 18 inch primary 24 months containment purge valve and each 18 inch primary containment exhaust valve is blocked to restrict opening greater than the required maximum opening angle.
SR 3.6.1.3.16 Replace the inflatable seal of each 96 months 6 inch and 18 inch primary containment purge valve and each 18 inch primary containment exhaust valve.
PBAIPS U'iT- - J.0-10 Amendment AJn e - No. 263