ML072480257

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment 119, Technical Specification 3.7.1 Regarding Ultimate Heat Sink Temperature Limits
ML072480257
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/04/2007
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
david marshall NRR/DORL 415-1547
References
TAC MD4031
Download: ML072480257 (3)


Text

(1) Maximum Power Level Nine Mile Point Nuclear Station, LLC, is authorized to operate the facility at reactor core power levels not in excess of 3467 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 119 are hereby incorporated into this license. Nine Mile Point Nuclear Station, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Fuel Storage and Handling (Section 9.1, SSER 4)*

a. Fuel assemblies, when stored in their shipping containers, shall be stacked no more than three containers high.
b. When not in the reactor vessel, no more than three fuel assemblies shall be allowed outside of their shipping containers or storage racks in the New Fuel Vault or Spent Fuel Storage Facility.
c. The above three fuel assemblies shall maintain a minimum edge-to-edge spacing of twelve (12) inches from the shipping container array and approved storage rack locations.
d. The New Fuel Storage Vault shall have no more than ten fresh fuel assemblies uncovered at any one time.

(4) Turbine System Maintenance Program (Section 3.5.1.3.10, SER)

The operating licensee shall submit for NRC approval by October 31, 1989, a turbine system maintenance program based on the manufacturer's calculations of missile generation probabilities.

(Submitted by NMPC letter dated October 30, 1989, from C.D. Terry and approved by NRC letter dated March 15, 1990, from Robert Martin to Mr. Lawrence Burkhardt, Ill).

The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.

Renewed License No. NPF-69 Amrh.t N:). 119

SW System and UHS 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Service Water (SW) System and Ultimate Heat Sink (UHS)

LCO 3.7.1 a. Division 1 and 2 SW subsystems and UHS shall be OPERABLE.

I AND b.1 Four OPERABLE SW pumps shall be in operation when water temperature of one or two SW subsystem supply headers is < 82°F.

OR b.2 Five OPERABLE SW pumps shall be in operation when water temperature of one or two SW subsystem supply headers is > 82°F and < 84 0F.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SW supply header A. 1 Open the SW supply 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cross connect valve header cross connect inoperable, valve.

AND A.2 Restore the SW supply 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> header. cross connect valve to OPERABLE status.'

B. One or more non-safety B.1 Isolate the affected 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> related SW flow paths non-safety related SW with one SW isolation flow path(s).

valve inoperable.

C. One SW subsystem C.1 Restore SW subsystem 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons to OPERABLE status.

other than Conditions A andd B 0.

(continued)

NMP2 3.7.1-1 Amendment 04, 119

SW System and UHS 3.7.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. One division of intake D.1 Restore intake deicer 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> deicer heaters heater division to inoperable. OPERABLE status.

E. One required SW pump E.1 Restore required SW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> not in operation. pump to operation.

F. Two or more required F.1 Restore all but one 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SW pumps not in required SW pump to operation. operation.

G. Required Action and ----- NOTE.

associated Completion Enter applicable Conditions Time of Condition A, and Required Actions of B, C, D, E, or F not LCO 3.4.9, "Residual Heat I met. Removal (RHR) Shutdown Cooling System - Hot OR Shutdown," for RHR Shutdown Cooling subsystem(s) made Both SW subsystems inoperable by SW System or inoperable for reasons UHS.

other than Conditions A, B, and C. G.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I OR AND UHS inoperable G.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I for reasons other I than Condition D.

NMP2 3.7.1-2 Amendment 94,-113, 119

SW System and. UHS 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 NOTE Not required to be met if SR 3.7.1.5 and SR 3.7.1.8 satisfied.

Verify the water temperature of the intake 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> tunnels is Ž_38 0F.

SR 3.7.1.2 Verify the water level in the SW pump 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> intake bay is -a233.1 ft.

SR 3.7.1.3 Verify the water temperature bf 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> each SW subsystem supply header is

  • 840F. I AND 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> when supply header water temperature is

>_78 0 F I

SR 3.7.1.4 Verify each required SW pump is in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> operation.

(continued)

NMP2 3.7.1-3 Amendment 94, 119