Mid-Cycle 07 Performance Review and Inspection Plan
ML072430334
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/31/2007
From: Vias S
NRC/RGN-II/DRP/RPB3
To: Young D
Progress Energy Florida
Shared Package
ML072430324 List:
References
Download: ML072430334 (5)


Text

August 31, 2007 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CRYSTAL RIVER NUCLEAR PLANT

Dear Mr. Young:

On August 14, 2007, the NRC staff completed its performance review of the Crystal River Nuclear Power Plant for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Overall, Crystal River Unit 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for Crystal River Unit 3 for the most recent quarter was in the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition to the ROP baseline inspections, we plan to conduct a non-baseline inspection involving containment sump blockage.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2009. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review.

FPC 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all baseline inspection procedures.

If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4505 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven J. Vias, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72

Enclosure:

Crystal River Inspection/Activity Plan cc w/encl: (See page 3)

OFFICE RII:DRP RII:DRP SIGNATURE SJV SON NAME SVias:rcm SNinh DATE 08/31/2007 08/31/2007 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

FPC 3

cc w/encl:

Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Daniel L. Roderick Vice President, Nuclear Projects and Construction Crystal River Nuclear Plant Electronic Mail Distribution David M. Varner Manager, Support Services - Nuclear Crystal River Nuclear Plant Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Jim Mallay Framatome Technologies Electronic Mail Distribution Distribution w/encl: (See page 4)

FPC 4

Mid-Cycle Performance Review and Inspection Plan to Dale Young from Steven Vias dated August 31, 2007.

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - CRYSTAL RIVER NUCLEAR PLANT Distribution w/encl:

S. Bailey, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS RIDSNRRDIRS OE Mail (email address if applicable)

PUBLIC