FENOC FirstEnergy Nuclear Operating Company Peter P. Sena II 724-682-5234 Site Vice President Fax. 724-643-8069 August 27, 2007 L-07-118 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 License Renewal Application Boundary Drawings
Reference:
L-07-113, "License Renewal Application," dated August 27, 2007.
By the referenced letter, FirstEnergy Nuclear Operating Company (FENOC) submitted the License Renewal Application for Beaver Valley Power Station, Unit 1 and Unit 2.
The Application references boundary drawings used in the scoping phase of the license renewal project. Enclosed is a copy of the boundary drawing index and the boundary drawings, which are provided to aid the NRC Staff in the review of the License Renewal Application. A compact disk containing an electronic copy of the drawings is also provided to facilitate NRC review.
No new regulatory commitments are contained in this submittal.
If there are any questions, or if additional information is required, please contact Mr. Clifford Custer, Fleet License Renewal Project Manager, at 724-682-7139.
Sincerely, Peter P. Sena III GO0
Beaver Valley Power Station, Unit Nos. I and 2 License Renewal Application Boundary Drawings L-07-118 Page 2
Enclosures:
1 License Renewal Application Boundary Drawing Index 2
License Renewal Application Boundary Drawings c:
Mr. K. L. Howard, NRR License Renewal Project Manager Mr. S. J. Collins, NRC Region I Administrator Mr. D. L. Werkheiser, NRC Senior Resident Inspector Mr. P. T. Kuo, NRR Director, Division of License Renewal Ms. N. S. Morgan, NRR Project Manager w/o Enclosures w/o Enclosures
Contents
- 1. Cover Letter
- 2. Drawing Index
- 3. License Renewal Drawings Book 1 of 4
- 4. License Renewal Drawings Book 2 of 4
- 5. License Renewal Drawings Book 3 of 4
- 6. License Renewal Drawings Book 4 of 4
The 229 Drawings specifically referenced in the BVPS License Renewal Drawings Index have been processed into ADAMS.
These drawings can be accessed by NRC Staff members within the ADAMS package or by performing. a search on the Document/Report Number.
BVPS LICENSE RENEWAL DRAWING INDEX Note: Parent system drawings are shown in bold.
Drawing Symbol Legend LR 1-00-1 LR 2-00-1 LR 1-00-2 LR 2-00-2 System Numbers & System Names LR 1-00-3 LR 2-00-3
[2.1.2 SCREENING METHODOLOGY UNIT I J
UNIT 2
[2.1.2.2.4 Structural Boundary Drawings ILR-STRUCTURES 2.3.1 REACTOR VESSEL, INTERNALS, AND COOLANT SYSTEM UNIT I UNIT 2 2.3.1.1 Reactor Vessel LR 1-06-1 LR 2-06-1 LR 1-06-4 LR 2-06-2 2.3.1.2 Reactor Vessel Internals LR 1-06-1 LR 2-06-1 2.3.1.3 Reactor Coolant System LR 1-06-1 LR 2-06-1 LR 1-06-2 LR 2-06-2 LR 1-06-3 LR 2-06-5 LR 1-06-4 LR 2-07-1A LR 1-07-1 LR 2-07-3 LR 1-07-4 LR 2-09-1 LR 1-09-1 LR 2-10-1 LR 1-10-1 LR 2-11-1 LR 1-11-1 LR 2-11-2 LR 1-11-2 LR 2-15-3 LR 1-15-5 LR 2-21-1 LR 1-21-1 LR 2-24-2A LR 1-24-1 LR 2-25-1 LR 1-25-1 2.3.2 ENGINEERED SAFETY FEATURES UNIT I UNIT 2 2.3.2.1 Containment Depressurization System LR 1-11-1 LR 2-11-1 LR 1-13-1 LR 2-13-1 LR 1-13-2 LR 2-13-2 LR 1-15-5 LR 2-14C-1 LR 1-29-1 LR 2-29-3 LR 1-30-3 LR 2-30-3 2.3.2.2 Residual Heat Removal System LR 1-07-1 LR 2-07-1A LR 1-10-1 LR 2-10-1 LR 1-15-5 LR 2-14A-2 LR 2-15-2 2.3.2.3 Safety Injection System LR 1-06-2 LR 2-07-1A LR 1-07-1 LR 2-11-1 LR 1-11-1 LR 2-11-2 LR 1-11-2 LR 2-13-2 LR 1-13-1 LR 2-14A-1 LR 1-34-6 2.3.3 AUXILIARY SYSTEMS UNIT 1 UNIT 2 2.3.3.1 Area Ventilation Systems - Control Areas LR 1-30-2 LR 2-29-2 LR 1-44A-1 LR 2-30-2 LR 1-44A-2 LR 2-33-1 B LR 1-44A-4 LR 2-33-2A LR 2-33-3 LR 2-44A-1 LR 2-44A-2 LR 2-44A-3 1 of 7
2.3.3 AUXILIARY SYSTEMS (CONTINUED)
UNIT I UNIT 2 2.3.3.2 Area Ventilation Systems - Plant Areas LR 1-16-1 LR 2-12-1 LR 1-29-2 LR 2-15-4 LR 1-33-3 LR 2-29-2 LR 1-44B-1 LR 2-29-3 LR 1-44E-1 LR 2-29-4 LR 1-44E-3 LR 2-30-2 LR 1-44F-1 LR 2-30-3 LR 2-44F-1 LR 2-33-2A LR 2-41A-3 LR 2-41A-4 LR 2-44B-1 LR 2-44B-2
-LR 2-44B-3
-LR 2-44C-1
-LR 2-44C-2
-LR 2-44D-1
-LR 2-44D-2
-LR 2-44D-3
-LR 2-44F-1
-LR 2-44F-3 LR 2-44F-4 LR 2-44F-5 2.3.3.3 Boron Recovery and Primary Grade Water System LR 1-08-1 LR 2-08-1 LR 1-08-2 LR 2-08-2 LR 1-08-3 LR 2-08-3 LR 1-08-4 LR 2-15-1 LR 1-08-5 LR 2-15-6 LR 1-08-6 LR 2-17-1 LR 1-08-7 LR 2-18-1 LR 1-15-2 LR 2-20-1 LR 1-18-3 LR 2-27A-1 LR 1-27-2 2.3.3.4 Building and Yard Drains System LR I-41D-1 LR 2-41D-2 LR 1-41D-2 LR 2-41D-4 LR 1-43-3 2.3.3.5 Chemical and Volume Control System LR 1-06-3 LR 2-07-1A LR 1-07-1 LR 2-07-1 B LR 1-07-2 LR 2-07-2 LR 1-07-3 LR 2-07-3 LR 1-07-4 LR 2-07-5 LR 1-07-5 LR 2-08-1 LR 1-08-1 LR 2-14A-2 LR 1-08-6 LR 2-14C-1 LR 1-14A-2 LR 2-15-2 LR 1-15-2 LR 2-15-5 LR 1-15-4 LR 2-18-1 LR 1-18-3 LR 2-30-2 LR 1-19-1 LR 1-27-2 LR 1-30-2 2.3.3.6 Chilled Water System LR 1-13-1 LR 2-13-2 LR 1-19-1 LR 2-19-1 LR 1-19-2 LR 2-19-2 LR 1-29-1 LR 2-29-2 LR 1-29-2 LR 2-29-3 (continued next page)
I LR 2-29-4 2 of 7
2.3.3 AUXILIARY SYSTEMS (CONTINUED)
UNIT I UNIT 2 2.3.3.6 Chilled Water System (continued)
LR 2-44A-1
-LR 2-44B-1 LR 2-44B-2 LR 2-44B-3
-LR 2-44C-1 LR 2-44D-1 LR 2-44D-2 LR 2-44D-3 2.3.3.7 Compressed Air System LR 1-34-1 LR 2-07-1A LR 1-34-2 LR 2-15-2 LR 1-34-8 LR 2-15-3 LR 2-34-4A LR 2-34-1B LR 2-34-2 LR 2-34-3 LR 2-34-10 LR 2-34-11 2.3.3.8 Containment System LR 1-47-1 LR 2-47-1 2.3.3.9 Containment Vacuum and Leak Monitoring System LR 1-12-1 LR 2-12-1 LR 1-46-1 LR 2-12-2 LR 2-14C-2 LR 2-43-21 2.3.3.10 Domestic Water System LR 1-41 C-1 LR 2-41C-1 2.3.3.11 Emergency Diesel Generators and Air Intake and Exhaust System LR 1-36-5 LR 2-36-2 2.3.3.12 Emergency Diesel Generators - Air Start System LR 1-36-1 LR 2-36-3 2.3.3.13 Emergency Diesel Generators - Crankcase Vacuum System LR 2-36-2 2.3.3.14 Emergency Diesel Generators - Fuel Oil System LR 1-36-2 LR 2-36-1 2.3.3.15 Emergency Diesel Generators - Lube Oil System LR 1-36-3 LR 2-36-4A LR 1-36-4 LR 2-36-4B LR 2-36-5A LR 2-36-5B 2.3.3.16 Emergency Diesel Generators - Water Cooling System LR 1-36-3 LR 2-36-4A LR 1-36-4 LR 2-36-4B LR 2-36-5A LR 2-36-5B 2.3.3.17 Emergency Response Facility Substation System (Common)
LR 1-58E-1 None LR 1-58E-2 LR 1-58E-3 2.3.3.18 Fire Protection System LR 1-06-3 LR 1-33-1 LR 1-30-1 LR 1-33-2 LR 1-33-1 LR 2-06-2 LR 1-33-2 LR 2-16-1 LR 1-33-3 LR 2-16-2 LR 1-33-4 LR 2-30-1 LR 1-33-7 LR 2-33-1A LR 1-33-8 LR 2-33-1B LR 2-33-1A LR 2-33-4C LR 2-33-1 B LR 2-33-1 D LR 2-33-1E LR 2-33-1F LR 2-33-2A LR 2-33-2B LR 2-33-3 LR 2-44A-1 LR 2-44A-2 (continued next page)
LR 2-44B-2 3 of 7
2.3.3 AUXILIARY SYSTEMS (CONTINUED)
UNIT I UNIT 2 2.3.3.18 Fire Protection System (continued)
LR 2-44B-3 LR 2-44C-2 LR 2-44F-5 2.3.3.19 Fuel Pool Cooling and Purification System LR 1-13-1 LR 2-15-5 LR 1-15-2 LR 2-18-1 LR 1-18-3 LR 2-20-1 LR 1-20-1 2.3.3.20 Gaseous Waste Disposal System LR 1-19-1 LR 2-15-6 LR 1-19-2 LR 2-19-1 LR2-19-2 LR 2-29-2 2.3.3.21 Liquid Waste Disposal System LR 1-15-2 LR 2-17-1 LR 1-17-1 LR 1-17-2 LR 1-17-3 LR 1-18-3 LR 1-27-2 2.3.3.22 Post Accident Sample System LR 1-14C-1 LR 2-14C-1 LR 2-14C-2 2.3.3.23 Post Design Basis Accident Hydrogen Control System LR 1-46-1 LR 2-12-1 LR 1-46-2 LR 2-46-1 2.3.3.24 Primary Component and Neutron Shield Tank Cooling LR 1-06-3 LR 2-06-2 Water System LR 1-07-1 LR 2-07-1A LR 1-07-4 LR 2-07-3 LR 1-08-1 LR 2-08-1 LR 1-08-2 LR 2-08-2 LR 1-08-3 LR 2-09-1 LR 1-08-4 LR 2-10-1 LR 1-10-1 LR 2-14A-1 LR 1-14A-1 LR 2-14A-2 LR 1-15-1 LR 2-15-1 LR 1-15-2 LR 2-15-2 LR 1-15-3 LR 2-15-3 LR 1-15-4 LR 2-15-4 LR 1-15-5 LR 2-15-5 LR 1-17-2 LR 2-15-6 LR 1-19-1 LR 2-19-1 LR 1-20-1 LR 2-20-1 LR 1-25-1 LR 2-25-4 LR 1-27-2 LR 2-27A-2 LR 1-30-3 LR 2-30-3 LR 1-43-3 LR 2-34-3 LR 2-43-16 LR 2-44C-2 2.3.3.25 Radiation Monitoring System LR 1-07-1 LR 2-12-1 LR 1-15-1 LR 2-16-1 LR 1-16-1 LR 2-16-2 LR 1-17-1 LR 2-25-4 LR 1-19-1 LR 2-30-3 LR 1-43-2 ILR 2-43-16 LR 1-43-3 LR 2-43-18 LR 1-43-5 LR 2-43-21 LR 2-43-22 2.3.3.26 Reactor Plant Sample System LR 1-06-1 LR 2-06-1 LR 1-06-2 LR 2-14A-1 (continued next page)
LR 1-09-1 LR 2-14A-2 4 of 7
2.3.3 AUXILIARY SYSTEMS (CONTINUED)
UNIT I UNIT 2 2.3.3.26 Reactor Plant Sample System (continued)
LR 1-10-1 LR 2-15-6 LR 1-11-2 LR 2-27A-2 LR 1-14A-1 LR -14A-2 LR 1-14A-3 LR 1-15-2 LR 1-25-1 2.3.3.27 Reactor Plant Vents and Drains System LR 1-06-1 LR 2-06-1 LR 1-06-2 LR 2-07-1A LR 1-07-1 LR 2-07-3 LR 1-07-3 LR 2-08-1 LR 1-07-4 LR 2-09-1 LR 1-09-1 LR 2-09-2 LR 1-09-2 LR 2-09-3 LR 1-09-3 LR 2-10-1 LR 1-09-4 LR 2-15-2 LR 1-10-1 LR 1-14A-2 2.3.3.28 River Water System (Unit I only)
LR 1-07-5 Not applicable LR 1-13-2 LR 1-14C-1 LR 1-15-1 LR 1-20-1 LR 1-24-2 LR 1-29-2 LR 1-30-1 LR 1-30-2 LR 1-30-3 LR 1-30-4 LR 1-32-6 LR 1-36-4 LR 1-43-2 LR 1-43-3 LR 1-44A-2 LR 2-30-1 LR 2-30-1A 2.3.3.29 Security Diesel Generator System (Common)
LR 1-45F-1 None 2.3.3.30 Service Water System (Unit 2 only)
Not applicable LR 1-30-1 LR 2-07-1A LR 2-07-5 LR 2-13-1 LR 2-14C-1 LR 2-15-1 LR 2-24-3 LR 2-29-4 LR 2-30-1 LR 2-30-1A LR 2-30-2 LR 2-30-3 LR 2-36-4A LR 2-36-4B LR 2-43-22 LR 2-44A-2 LR 2-44A-3 LR 2-44B-1 LR 2-44B-3 5 of 7
2.3.3 AUXILIARY SYSTEMS (CONTINUED)
UNIT 1 UNIT 2 2.3.3.31 Solid Waste Disposal System LR 1-07-2 LR 2-07-1 B LR 1-08-2 LR 2-08-2 LR 1-08-5 LR 2-18-1 LR 1-17-2 LR 2-20-1 LR 1-18-1 LR 1-18-2 LR 1-18-3 LR 1-20-1 2.3.3.32 Supplementary Leak Collection and Release System LR 1-12-1 LR 2-16-1 LR 1-16-1 LR 2-16-2 LR 1-33-3 LR 2-26-3 LR 1-34-5 LR 2-33-2A LR 1-34-8 LR 2-44C-2 LR 2-44D-2 2.3.4 STEAM AND POWER CONVERSION SYSTEM UNIT I UNIT 2 2.3.4.1 Auxiliary Feedwater System LR 1-24-1 LR 2-24-3 LR 1-24-2 LR 2-24-5 LR 1-24-3 LR 1-32-7 2.3.4.2 Auxiliary Steam System LR 1-07-3 LR 2-07-2 LR 1-08-1 LR 2-08-1 LR 1-08-3 LR 2-15-6 LR 1-08-5 LR 2-27A-1 LR 1-17-2 LR 2-27A-2 LR 1-27-1 LR 2-27A-3 LR 1-27-2 LR 1-27-4 LR 1-43-2 2.3.4.3 Building Services Hot Water Heating System LR 1-41A-1 LR 2-41A-1 LR 1-41A-2 LR 2-41A-2 LR 1-41A-3 LR 2-41A-3 LR 1-41B-1 LR 2-41A-4 LR 2-44B-1 LR 2-44B-2 LR 2-448-3 LR 2-44D-1 2.3.4.4 Condensate System (Unit I only)
LR 1-22-1 Not applicable LR 1-24-3 LR 1-32-7 2.3.4.5 Glycol Heating System (Unit I only)
LR 1-41 B-1 Not applicable 2.3.4.6 Main Feedwater System LR 1-24-1 LR 2-21-1 LR 1-24-3 LR 2-24-2A LR 2-24-3 2.3.4.7 Main Steam System LR 1-21-1 LR 2-21-1 LR 1-21-2 LR 2-21-2 LR 1-21-3 LR 2-21-3 LR 1-21-4 LR 2-24-5 LR 1-26-4 LR 2-26-1 2.3.4.8 Main Turbine and Condenser System LR 1-26-6 LR 2-26-3 2.3.4.9 Steam Generator Blowdown System LR 1-25-1 LR 2-14A-1 LR 1-43-2 LR 2-15-5 LR 2-25-1 LR 2-25-2 LR 2-25-4 LR 2-25-5 6 of 7
2.3.4 STEAM AND POWER CONVERSION SYSTEM (CONTINUED)
UNIT 1 UNIT 2 2.3.4.10 Water Treatment System LR 1-32-2 LR 2-24-3 LR 1-32-8 LR 2-30-3 LR 1-32-9 LR 2-32-1 LR 2-32-2 LR 2-36-4A LR 2-36-4B LR 2-43-22 12.4 STRUCTURAL BOUNDARY DRAWINGS I
UNIT I UNIT 2 12.4 Structural Boundary Drawings ILR-STRUCTURES 7 of 7