Other: CNRO-2007-00023, Proposed License Transfer and Conforming License Amendment in the Matter of Entergy Gulf States, Inc, ML071630019, ML072420498, ML072740029, ML073060003, ML073060006, RBG-46740, Additional Information - Proposed License Transfer and Confirming License Amendment, RBG-46767, Order Approving the Transfer of the Facility Operating License No. NPF-47 and Conforming Amendment, RBG-46780, Order Approving the Transfer of the Facility, Operating License No. NPF-47 and Conforming Amendment, RBG-46795, Order Approving the Transfer of Facility Operating License No. NPF-47 and Conforming Amendment
|
MONTHYEARCNRO-2007-00023, Proposed License Transfer and Conforming License Amendment in the Matter of Entergy Gulf States, Inc2007-05-29029 May 2007 Proposed License Transfer and Conforming License Amendment in the Matter of Entergy Gulf States, Inc Project stage: Other ML0716300192007-07-0202 July 2007 Ltr to License and Individual Fr Notice of Consideration of Approval of Transfer of Control of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing Project stage: Other ML0720706602007-07-25025 July 2007 7/25/07 E-Mail to D. Lorfing, Entergy, Clarification of Draft RAI from Iolb Re License Transfer and Conforming Amendment, RAI Information from Human Performance Project stage: Draft RAI ML0720800022007-07-31031 July 2007 Request for Additional Information Proposed License Transfer and Conforming License Amendment Request Project stage: RAI RBG-46735, Response to Request for Additional Information Regarding Proposed License Transfer and Confirming License Amendment Request2007-08-30030 August 2007 Response to Request for Additional Information Regarding Proposed License Transfer and Confirming License Amendment Request Project stage: Response to RAI RBG-46740, Additional Information - Proposed License Transfer and Confirming License Amendment2007-09-19019 September 2007 Additional Information - Proposed License Transfer and Confirming License Amendment Project stage: Other ML0727105882007-10-26026 October 2007 Conforming License Amendment and Safety Evaluation, Enclosures 2 and 3 to Order Approving Direct Transfer of Facility Operating License No. NPF-47 Project stage: Approval ML0724204982007-10-26026 October 2007 Order Approving the Direct Transfer of Facility Operating License License No. NPF-47 from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC and Conforming Amendment Project stage: Other ML0727400292007-10-26026 October 2007 License Pg 1-4 and Appendix C Pg 1-4 - Conforming Amendment for Order Approving the Direct Transfer of Facility Operating License License from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC Project stage: Other ML0730600062007-11-23023 November 2007 Corrected Page 3 of the Order, Appendix C Project stage: Other ML0730600032007-11-23023 November 2007 Clarifications Order Approving Transfer of Facility Operating License No. NPF-47 and Conforming Amendment (Tac MD5671) Project stage: Other RBG-46767, Order Approving the Transfer of the Facility Operating License No. NPF-47 and Conforming Amendment2007-12-12012 December 2007 Order Approving the Transfer of the Facility Operating License No. NPF-47 and Conforming Amendment Project stage: Other RBG-46780, Order Approving the Transfer of the Facility, Operating License No. NPF-47 and Conforming Amendment2008-01-15015 January 2008 Order Approving the Transfer of the Facility, Operating License No. NPF-47 and Conforming Amendment Project stage: Other RBG-46795, Order Approving the Transfer of Facility Operating License No. NPF-47 and Conforming Amendment2008-02-27027 February 2008 Order Approving the Transfer of Facility Operating License No. NPF-47 and Conforming Amendment Project stage: Other 2007-07-25
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection ML24205A0392024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation 2024-09-24
[Table view] Category:Order
MONTHYEARML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation ML15146A4102015-08-14014 August 2015 Order Approving Direct and Indirect Transfers of License and Conforming Amendment ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML0724204982007-10-26026 October 2007 Order Approving the Direct Transfer of Facility Operating License License No. NPF-47 from Entergy Gulf States, Inc., to Entergy Gulf States Louisiana, LLC and Conforming Amendment ML0309401982003-04-29029 April 2003 Issuance of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel ML0309106252003-04-29029 April 2003 EA-03-039, Addressee List, (Order Issued by Program Office or OE for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Per 2015-08-14
[Table view] |
Text
October 26, 2007 Mr. Michael R. Kansler President and Chief Executive Officer, Nuclear Operations/Chief Nuclear Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995
SUBJECT:
RIVER BEND STATION, UNIT 1 - ORDER APPROVING TRANSFER OF FACILITY OPERATING LICENSE NO. NPF-47 AND CONFORMING AMENDMENT (TAC NO. MD5671)
Dear Mr. Kansler:
The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of your application dated May 29, 2007, as supplemented by letters dated August 30 and September 19, 2007. Your application requested approval of the transfer of Facility Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS), to the extent currently held by Entergy Gulf States, Inc. (EGS) as owner of RBS, to a new Louisiana limited liability company, Entergy Gulf States Louisiana, LLC (EGS-LA), and approval of a conforming amendment, pursuant to Title 10 of the Code of Federal Regulations, Section 50.80, Transfer of Licenses, and 10 CFR 50.90, Application for Amendment of License, Construction Permit, or Early Site Permit. The transfer is associated with the planned restructuring of EGS. Entergy Operations, Inc., currently the licensed operator of RBS, will continue to operate RBS and hold the operating authority under the license.
The enclosed Order (Enclosure 1) approves the proposed transfer, subject to the conditions described therein. The Order also approves a conforming license amendment (Enclosure 2),
which will be issued and made effective at the time the transfer is completed, with the changes indicated in the conforming amendment.
M. R. Kansler Enclosure 3 is the NRCs safety evaluation related to the preceding action, which will be placed in the NRC Public Document Room and added to the Agencywide Documents Access and Management Systems (ADAMS) Publicly Available Records System library. This Order is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Bhalchandra K. Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Order
- 2. Conforming Amendment
- 3. Safety Evaluation cc w/encls: See next page
Pkg ML072420536, Letter and Order ML072420498, Conforming Amendment/SE ML072710588, License/Appendix C ML072740029
- No significant changes to SE **See previous concurrence ***No Legal Objection ADM-012 NRR-043 OFFICE NRR/LPL4/PM NRR/LPL4/LA TechEditor DPR/PFPB/BC DIRS/IOLB/BC NAME BVaidya:sp JBurkhardt Lisa-Ann Culp RCarlson NSalgado DATE 10/5/07 10/5/07 10/3/07 10/12/07 10/9/07 OFFICE NRR/LPL4/BC NRR/DORL/D NRR/ADRO/AD OGC NRR/D NAME THiltz CHaney BBoger SUttal*** JDyer DATE 10/15/07 10/18/07 10/19/07 10/25/07 10/26/07 River Bend Station cc:
Senior Vice President Louisiana Department of Environmental Entergy Nuclear Operations Quality P.O. Box 31995 Radiological Emergency Planning and Jackson, MS 39286-1995 Response Division P.O. Box 4312 Senior Vice President and COO Baton Rouge, LA 70821-4312 Entergy Operations, Inc.
P.O. Box 31995 Louisiana Department of Environmental Jackson, MS 39286-1995 Quality Office of Environmental Compliance Vice President, Operations Support P.O. Box 4312 Entergy Operations, Inc. Baton Rouge, LA 70821-4312 P.O. Box 31995 Jackson, MS 39286-1995 Attorney General State of Louisiana General Manager, Plant Operations P.O. Box 94095 Entergy Operations, Inc. Baton Rouge, LA 70804-9095 River Bend Station 5485 U.S. Highway 61N President of West Feliciana St. Francisville, LA 70775 Police Jury P.O. Box 1921 Director, Nuclear Safety & Licensing St. Francisville, LA 70775 Entergy Services, Inc.
440 Hamilton Avenue Mr. Brian Almon White Plains, NY 10601 Public Utility Commission William B. Travis Building Director, Nuclear Safety Assurance P.O. Box 13326 Entergy Operations, Inc. 1701 North Congress Avenue River Bend Station Austin, Texas 78701-3326 5485 U.S. Highway 61N St. Francisville, LA 70775 Mr. Jim Calloway Public Utility Senior Manager, Nuclear Safety & Commission of Texas Licensing 1701 N. Congress Avenue Entergy Services, Inc. Austin, TX 78711-3326 P.O. Box 31995 Jackson, MS 39286-1995 Ms. H. Anne Plettinger 3456 Villa Rose Drive Manager, Licensing Baton Rouge, LA 70806 Entergy Operations, Inc.
River Bend Station Mr. Richard Penrod, Senior Environmental 5485 U.S. Highway 61N Scientist/State Liaison Officer St. Francisville, LA 70775 Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 September 2007
River Bend Station cc:
Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Mr. Joseph E. Venable Site Vice President Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775 September 2007
ENCLOSURE 1 ORDER APPROVING TRANSFER OF LICENSE AND CONFORMING AMENDMENT
7590-01-P UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
)
ENTERGY GULF STATES, INC. ) Docket No. 50-458
) License No. NPF-47 ENTERGY OPERATIONS, INC. )
)
(River Bend Station, Unit 1) )
ORDER APPROVING TRANSFER OF FACILITY OPERATING LICENSE AND CONFORMING AMENDMENT I.
Entergy Gulf States, Inc. (EGS) and Entergy Operations, Inc. (EOI) are the holders of Facility Operating License NPF-47, issued by the U.S. Nuclear Regulatory Commission (NRC or Commission) pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Domestic Licensing of Production and Utilization Facilities. The license authorizes the operation of River Bend Station, Unit 1 (RBS or facility), in accordance with terms and conditions specified therein. The facility is located in St. Francisville, West Feliciana Parish, Louisiana. The license authorizes EGS to possess the facility with respect to EGSs ownership of RBS, and EOI to use and operate the facility.
II.
By letter dated May 29, 2007, as supplemented by letters dated August 30 and September 19, 2007, EOI, acting on behalf of EGS and itself, submitted an application to the NRC requesting, pursuant to 10 CFR 50.80, approval of the direct transfer of the license for RBS from EGS to Entergy Gulf States Louisiana, LLC (EGS-LA). EOI also requested, pursuant
to 10 CFR 50.90, approval of a conforming license amendment to the RBS, Unit 1, Operating License (NPF-47) to reflect the transfer. The transfer is associated with the planned restructuring of EGS under which ownership of RBS will be transferred from EGS, a Texas corporation, to EGS-LA, Louisiana limited liability company. EOI will continue to operate RBS, and thus there is no transfer of operating authority under the license proposed in the application.
Notice of the requests for approval and an opportunity for a hearing was published in the Federal Register on July 9, 2007 (72 FR 37266). No comments or hearing requests were received.
Pursuant to 10 CFR 50.80, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of the license, unless the Commission shall give its consent in writing. Upon review of the information in the application and other information before the Commission, and relying upon the representations and agreements contained in the application, the NRC staff has determined that EGS-LA is qualified to hold the license for RBS to the extent now held by EGS, and that the transfer of the license to EGS-LA described in the application is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto, subject to the conditions set forth below. The NRC staff has further found that the application for the proposed license amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; the facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; there is reasonable assurance that the activities authorized by the proposed license amendment can be conducted without endangering the health and safety of the public and that such activities will be conducted in compliance with the Commissions regulations; the
issuance of the proposed license amendment will not be inimical to the common defense and security or the health and safety of the public; and the issuance of the proposed amendment will be in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
The findings set forth above are supported by a safety evaluation dated October 26, 2007.
III.
Accordingly, pursuant to Sections 161b, 161i, and 184 of the Atomic Energy Act of 1954, as amended, 42 U.S.C. §§ 2201(b), 2201(i), and 2234, and 10 CFR 50.80, IT IS HEREBY ORDERED that the transfer of the license to EGS-LA, as described herein is approved, subject to the following conditions:
(1) At the time of the closing of the transfer of ownership of and the license for RBS from EGS to EGS-LA, the RBS decommissioning trust agreement(s) shall be amended to reflect EGS-LA as the owner of all the decommissioning trust funds accumulated as of the date of the closing.
(2) Prior to completion of the transfer of ownership of and the transfer for RBS, EGS-LA shall provide the Director of the Office of Nuclear Reactor Regulation satisfactory documentary evidence that it has obtained the appropriate amount of insurance required of licensees under 10 CFR Part 140 of the Commissions regulations.
IT IS FURTHER ORDERED that, consistent with 10 CFR 2.1315(b), a license amendment that makes changes, as indicated in Enclosure 2 to the cover letter forwarding this Order, to conform the license to reflect the subject license transfer, is approved. The amendment shall be issued and made effective at the time the proposed license transfer is completed.
IT IS FURTHER ORDERED that EOI shall inform the Director of the Office of Nuclear Reactor Regulation in writing of the date of closing of the transfer no later than 5 business days prior to such action. Should the transfer of the license not be completed byOctober 25, 2008, this Order shall become null and void, provided, however, that upon written application and for good cause shown, such date may be extended by order.
This Order is effective upon issuance.
For further details with respect to this action, see the application dated May 29, 2007, the supplemental letters dated August 30 and September 19, 2007, and the safety evaluation dated October 26, 2007, which are available for public inspection at the Commission's Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor),
Rockville, Maryland, and accessible electronically through the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet on the NRCs Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the document located in ADAMS, should contact the NRC PDR Reference Staff by telephone at 1-800-397-4209, 301-415-4737, or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 26th day of October , 2007.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation