Notification of an NRC Triennial Fire Protection Baseline Inspection 05000313-07-006 and 05000368-07-006
ML072200646
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/08/2007
From: Laura Smith
Division of Reactor Safety IV
To: Mitchell T
Entergy Operations
References
IR-07-006
Download: ML072200646 (9)


See also: IR 05000313/2007006

Text

August 8, 2007

Timothy G. Mitchell

Vice President Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, AR 72802-0967

SUBJECT:

ARKANSAS NUCLEAR ONE - NOTIFICATION OF AN NRC TRIENNIAL FIRE

PROTECTION BASELINE INSPECTION 05000313/2007006 AND

05000368/2007006

Dear Mr. Mitchell:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC),

Region IV staff will conduct a triennial fire protection baseline inspection at Arkansas Nuclear

One, Units 1 and 2, facility in September and October of 2007. The inspection team will be

comprised of reactor inspectors from the NRC Region IV office. The inspection will be

conducted in accordance with Inspection Procedure 71111.05TTP, the NRCs baseline fire

protection inspection procedure for plants in the process of implementing 10 CFR 50.48(c),

NFPA 805. The inspection guidance is different from the regular triennial inspections in that the

inspectors will concentrate on the fire protection program infrastructure and the adequacy of

compensatory measures implemented for identified departures for code requirements. The

inspectors will not routinely inspect for or evaluate circuit related issues.

The schedule for the inspection is as follows:

Information gathering visit: September 12 -13, 2007

Onsite inspection: September 24 - 28, and October 15 - 19, 2007

Members of the inspection team will visit Arkansas Nuclear One on September 12 - 13, 2007, to

gather information and documents needed to support the inspection, obtain unescorted access,

to become familiar with your fire protection program, and to select fire areas on which to focus

the inspection. The enclosure to this letter provides a list of the documents the team will want

to review for use in preparing for the inspection. We would appreciate it if you could send this

information so that it will arrive in our office in Arlington, Texas, no later than noon on

September 17, 2007. Please note that several documents are requested by September 4, 2007

to support the information gathering trip.

Entergy Operations, Inc.

-2-

We request that during the onsite inspection weeks, you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest are those documents that establish that your fire

protection program satisfies NRC regulatory requirements and conforms to applicable NRC

and industry fire protection guidance. Also, appropriate personnel knowledgeable of: (1) those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room, (2) the electrical aspects of the post-fire safe shutdown analyses,

(3) reactor plant fire protection systems, and (4) the fire protection program and its

implementation should be available to support the team at the site during the inspection.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact John M. Mateychick at 817-276-6560.

Sincerely,

/RA/

Linda J. Smith, Chief

Engineering Branch 2

Division of Reactor Safety

Dockets: 50-313

50-368

Licenses: DPR-51

NPF-6

Enclosure: Triennial Fire Protection

Inspection Supporting Documentation

cc/w Enclosure:

Senior Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Entergy Operations, Inc.

-3-

General Manager Plant Operations

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Director, Nuclear Safety Assurance

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Manager, Licensing

Entergy Operations, Inc.

Arkansas Nuclear One

1448 S. R. 333

Russellville, AR 72802

Director, Nuclear Safety & Licensing

Entergy Operations, Inc.

1340 Echelon Parkway

Jackson, MS 39213-8298

Section Chief, Division of Health

Radiation Control Section

Arkansas Department of Health and

Human Services

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Section Chief, Division of Health

Emergency Management Section

Arkansas Department of Health and

Human Services

4815 West Markham Street, Slot 30

Little Rock, AR 72205-3867

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, MD 20852

County Judge of Pope County

Pope County Courthouse

100 West Main Street

Russellville, AR 72801

Entergy Operations, Inc.

-4-

James Mallay

Director, Regulatory Affairs

Framatome ANP

3815 Old Forest Road

Lynchburg, VA 24501

Lisa R. Hammond, Chief

Technological Hazards Branch

National Preparedness Division

FEMA Region VI

800 N. Loop 288

Denton, TX 76209

Entergy Operations, Inc.

-5-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (RWD)

Branch Chief, DRP/E (JAC)

Senior Project Engineer, DRP/E (GDR)

Team Leader, DRP/TSS (CJP)

RITS Coordinator (MSH3)

DRS STA (DAP)

D. Pelton, OEDO RIV Coordinator (DLP1)

ROPreports

ANO Site Secretary (VLH)

SUNSI Review Completed: ljs

ADAMS: Yes

G No Initials: ljs

Publicly Available G Non-Publicly Available

G Sensitive

Non-Sensitive

R:\\_AN\\2007\\AN2007-006-ltr-jmm.wpd

ML

RIV: DRS/E2B/SRI

C: EB2

JM Mateychick

LJSmith

/RA/

/RA/

7/31/07

8/08/07

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

Enclosure

-1-

ENCLOSURE

Triennial Fire Protection Inspection Documentation Requested

Please provide the following documentation prior to the onsite information gathering trip,

preferably no later than September 4, 2007. Where practical, please provide copies

electronically on compact discs.

1.

The current version of your fire protection program and fire hazards analysis.

2.

Post-fire safe shutdown analysis and the supporting calculations which demonstrate

acceptable plant response.

3.

Copies of the licensing basis documents for fire protection (Safety Evaluation Reports,

pertinent sections of the Final Safety Analysis Report, exemptions, deviations, letters

to/from the NRC regarding fire protection/fire safe shutdown, etc.).

4.

The Fire PRA or portions of the plants IPEEE addressing fire events.

Please provide the following documentation, either during the onsite information gathering trip

September 12 - 13, 2007, or by noon on September 17, 2007, in order to support inspection

preparation. Where practical, please provide copies electronically on compact discs. However,

drawings should be provided as paper copies of sufficient size that all details are legible.

5.

Fire protection program implementing procedures (e.g., administrative controls, operator

response procedures for fires, fire fighting procedures, etc.).

6.

Operating procedures used for achieving and maintaining hot and cold shutdown

conditions from the control room in the event of a fire outside the control room (III.G.2

areas).

7.

Operating procedure(s) used to implement an alternative shutdown (III.G.3 areas)

capability with or without control room evacuation.

8.

Pre-fire plans for the selected fire areas (areas to be selected by the team during the

information-gathering trip).

9.

A list of equipment used to achieve and maintain hot standby and cold shutdowns in the

event of a fire (safe shutdown equipment lists).

10.

Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdowns for fires outside the control room and

those components used for those areas requiring alternative shutdown capability. Two

copies of the piping and instrumentation (flow) diagrams for these systems of a size

sufficient to read all details. These should include the systems used for RCS makeup,

RCS pressure control, decay heat removal, and reactivity control, including the essential

support systems.

Enclosure

-2-

11.

Plant layout and equipment drawings for the selected fire areas that identify (a) the

physical plant locations of major hot standby and cold shutdown equipment; (b) plant fire

area and/or fire zone delineation; and (c) the locations of fire protection equipment, such

as detection, suppression, and post-fire emergency lighting units, and (d) fire area

boundaries.

12.

Procedures/instructions that govern the implementation of plant modifications,

temporary modifications, maintenance, and special operations, and their impact on fire

protection.

13.

A listing of design change packages, which were determined to impact fire protection

and post-fire safe shutdowns, performed in the last three years.

14.

Copies of Generic Letter 86-10 evaluations performed in the last three years.

15.

A listing of open and closed action requests initiated in the last three years which relate

to the fire protection program or equipment.

16.

A listing of the applicable codes and standards (e.g. NFPA) related to the design of

plant fire protection features and evaluations of any code deviations.

17.

Drawings of the portions of the emergency lighting system which support fire response.

18.

Procedures used to remove smoke from safety-related areas and the engineering

studies or calculations which support the design basis.

19.

Drawings of communication systems credited in the license basis for firefighting and

plant operations during fires where control room is occupied and/or evacuated.

20.

Piping and instrumentation (flow) diagrams for the fire water and sprinkler systems.

21.

A listing of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

22.

Maintenance Rule performance criteria and a summary of the last three years

performance history for fire protection program systems or functions monitored within

the Maintenance Rule program.

23.

A copy of fire protection program requirements (e.g. limiting conditions for operation,

surveillance test requirements) covered by Technical Specifications, Technical

Requirements Manual, UFSAR, or similar documents.

24.

Copies of internal and external self-assessments, audits, peer-assessments or similar

reviews related to post-fire safe shutdown capability or the fire protection program

completed within the last three years.

25.

A list of manual actions taken outside the control room which are credited to mitigate the

consequences of fires in III.G.2 areas (non-alternative shutdown areas). The list should

group actions by the initiating fire area or zone and indicate where the action must take

place.

Enclosure

-3-

26.

Electronic copies of operator study guides (i.e. lesson plan text and graphics) or design

basis documents that describe the purpose/function/operating characteristics of the safe

shutdown systems (RCS makeup, RCS pressure control, decay heat removal, and

reactivity control, including the essential support systems).

27.

Two copies of one-line diagrams of the electrical distribution system. These should

depict how power gets from the switchyard to ESF loads (480V and 4160V). Also,

include the vital DC distribution system one-line diagrams.

28.

A list of automatic and manually initiated gaseous fire suppression systems in the plant,

giving location and the key equipment being protected.

29.

A list of repairs (and the procedure that controls the actions) needed to: a) reach and/or

maintain hot shutdown; b) reach and/or maintain cold shutdowns.

30.

A list of high to low pressure interface valves.

31.

A copy of procedures governing the training and operation of the fire brigade.

32.

Organization charts of site personnel down to the level of fire protection staff personnel.

33.

A contact list of key site personnel who will be supporting this inspection, giving location

of their office and phone number onsite.

34.

The team would like to observe a fire brigade drill in the plant, if possible, during the

week of October 15, 2007. Please put us in contact with the appropriate personnel for

planning drills during the onsite information gathering trip September 12 - 13, 2007.

35.

The team would like to perform a walkthrough of the procedure for control room due to

fire with qualified operators in the plant during the week of September 24, 2007. Please

put us in contact with the appropriate personnel for planning the walkthrough during the

onsite information gathering trip.