Technical Specifications, Issuance of Amendment Steam Generator Alternate Repair Criteria
ML070870467
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/27/2007
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Ennis R, NRR/DORL, 415-1420
Shared Package
ml070790081 List:
References
TAC MD4034
Download: ML070870467 (4)


Text

- 4 -

(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at a steady state reactor core power level not in excess of 3459 megawatts (one hundred percent of rated core power)

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 279 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

(3) Deleted Per Amendment 22, 11-20-79 (4) Less than Four Loop Operation PSEG Nuclear LLC shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3.1.1 of Appendix A to this license) with less than four (4) reactor coolant loops in operation until safety analyses for less than four loop operation have been submitted by the licensees and approval for less than four loop operation at power levels above P-7 has been granted by the Commission by Amendment of this license.

(5) PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, and as approved in the NRC Safety Evaluation Report dated November 20, 1979, and in its supplements, subject to the following provision:

PSEG Nuclear LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

Amendment No. 279

ADMINISTRATIVE CONTROLS outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.

b. Performance criteria for SG tube integrity. SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced. leakage, and operational leakage.
1. Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down and all anticipated transients included in the design specification) and design basis accidents. This includes retaining, a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse. In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.
2. Accident induced leakage performance criterion: The primary-to-secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG. Leakage is not to exceed 1 gallon per minute per SG.
3. The operational leakage performance criterion is specified in LCO 3.4.6.2, "Reactor Coolant System Operational Leakage."
c. Provisions for SG tube repair criteria. Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.

The following repair criteria are applicable only for Refueling Outage 18 and the subsequent operating cycle: In lieu of the 40% of the nominal wall thickness repair criteria, the portion of the tube within the tubesheet of the inspected SGs shall be plugged in accordance with the following alternate repair criteria: Tubes with flaws located below 17 inches from the top of the tubesheet may remain in service regardless of size. Tubes with flaws identified in the portion of the tube from the top of the tubesheet to 17 inches below the top of.the tubesheet shall be plugged on detection.

d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria.

SALEM - UNIT 1 6-19c Amendment No. 279

ADMINISTRATIVE CONTROLS In lieu of the above, the following inspection criteria are applicable only for Refueling Outage 18 and the subsequent operating cycle:

The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting.flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube beginning 17 inches below the top of the tubesheet on the tube hot leg side to 17 inches below the top of the tubesheet on the tube cold leg side.

The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.l, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.

1. Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.
2. Inspect 100% of the tubes at sequential periods of 120, 90, and thereafter, 60 effective full power months. The first sequential period shall be considered to begin after the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 48 effective full power months or two refueling outages (whichever is less) without being inspected.
3. If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
e. Provisions for monitoring operational primary-to-secondary leakage.

SALEM - UNIT 1 c~z\TM - Nn,.

iIT 1Am4-nimpnt 2-79

ADMINISTRATIVE CONTROLS

h. The following reporting requirements are applicable only for Refueling Outage 18 and the subsequent operating cycle:

The number of indications detected in the upper 17 inches of the tubesheet thickness along with their location, measured size, orientation, and whether the indication initiated on the primary or secondary side.

i. The following reporting requirement is applicable only for Refueling Outage 18 and the subsequent operating cycle:

The operational primary to secondary leakage rate observed in each steam generator during the cycle preceding the inspection and the calculated accident leakage rate for each steam generator from the lowermost 4 inches of tubing (the tubesheet is nominally 21.03 inches thick) for the most limiting accident. If the calculated leak rate is less than 2 times the total observed operational leakage rate, the 180 day report should describe how the calculated leak rate is determined.

SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the U.S. Nuclear Regulatory Commission, Document Control Desk, Washington, D.C. 20555, with a copy to the Administrator, USNRC Region I within the time period specified for each report.

6,9.3 Violations of the requirements of the fire protection program described in the Updated Final Safety Analysis Report which would have adversely affected the ability to achieve and maintain safe shutdown in the event of a fire shall be submitted to the U. S. Nuclear Regulatory Commission, Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator of the Regional Office of the NRC via the Licensee Event Report System within 30 days.

6.9.4 When a report is required by ACTION 8 or 9 of Table 3.3-11 "Accident Monitoring Instrumentation", a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring for inadequate core cooling, the cause of the inoperability, and the plans and schedule for restoring the instrument channels to OPERABLE status.

SALEM - UNIT 1 6-24b Amendment No. 279