MONTHYEARLR-N07-0005, One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance)2007-01-18018 January 2007 One Time License Change Request LCR S07-01 Steam Generator Alternate Repair Criteria (17 Inch Inspection Distance) Project stage: Request ML0701805112007-01-19019 January 2007 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing on 01/18/07 Application for Amend. Project stage: Other ML0702301402007-01-24024 January 2007 Individual Notice of Consideration of Issuance of Amendment, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing Project stage: Other ML0703202612007-01-31031 January 2007 Draft Request for Additional Information Project stage: Draft RAI ML0705704662007-03-0101 March 2007 Request for Withholding Information from Public Disclosure, Salem Nuclear Generating Station, Unit No. 1, Project stage: Withholding Request Acceptance ML0708704672007-03-27027 March 2007 Technical Specifications, Issuance of Amendment Steam Generator Alternate Repair Criteria Project stage: Approval ML0707900702007-03-27027 March 2007 License Amendment, Issuance of Amendment Steam Generator Alternate Repair Criteria Project stage: Approval 2007-01-24
[Table View] |
Similar Documents at Salem |
---|
Category:Technical Specifications
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements LR-N18-0129, License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements.2019-02-0404 February 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements. ML16096A4192016-04-28028 April 2016 Issuance of Amendments Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML16054A0682016-03-28028 March 2016 Issuance of Amendments Regarding Revision to Reactor Trip System Instrumentation Technical Specifications ML16035A0872016-03-0707 March 2016 Issuance of Amendments New Technical Specifications to Isolate Unborated Water Sources in Mode 6 LR-N16-0044, Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel2016-02-11011 February 2016 Emergency License Amendment Request to Modify Technical Specification Requirements for One Inoperable Subcooling Margin Monitor Channel LR-N15-0224, Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling)2015-11-25025 November 2015 Response to Request for Additional Information License Amendment Request to Isolate Unborated Water Sources and Use Gamma-Metrics Post-Accident Neutron Monitors During Mode 6 (Refueling) LR-N15-0182, License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements2015-10-12012 October 2015 License Amendment Request to Correct a Non-Conservative Technical Specification Applicability Statement and Inconsistent Action Statements ML15245A6362015-09-0404 September 2015 Issuance of Emergency Amendment Regarding Removal of Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Technical Specifications ML15153A2302015-07-30030 July 2015 Issuance of Amendments Adopting Technical Specification Task Force (TSTF)-510, Rev, 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection(Tac Nos. MF4574 & MF457 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML15063A2932015-03-30030 March 2015 Issuance of Amendments Revision to Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor LR-N14-0074, License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor2014-03-24024 March 2014 License Amendment Request to Revise Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor LR-N12-0183, License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System2012-07-17017 July 2012 License Amendment Request: Revision to Technical Specification (TS) 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System LR-N11-0208, Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal2011-07-0606 July 2011 Revised License Condition- Salem-Hope Creek Cyber Security Plan Supplement Submittal ML11175A2072011-06-30030 June 2011 Appendices a, B and C ML11136A0642011-06-30030 June 2011 Issuance of Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Units 1 and 2 LR-N10-0363, License Amendment Request: Changes to Snubber Surveillance Requirements2010-10-0404 October 2010 License Amendment Request: Changes to Snubber Surveillance Requirements ML1020805012010-08-20020 August 2010 License Amendment, Issuance of Amendments Surveillance Requirements for Inservice Inspection and Inservice Testing LR-N10-0098, License Amendment Request - One Time On-Line Safety-Related Battery Replacement2010-03-29029 March 2010 License Amendment Request - One Time On-Line Safety-Related Battery Replacement ML1005704522010-03-29029 March 2010 Issuance of Amendment Steam Generator Inspection Scope and Repair Requirements ML0936308182010-01-12012 January 2010 License Amendment, Revise the Definition of Fully Withdrawn for the Rod Cluster Control Assemblies ML0929605842009-10-0808 October 2009 License Amendment Request, Revision to Technical Specification 6.8.4.i, Steam Generator Program, for One-Time (Interim) Alternate Repair Criteria (H*) LR-N09-0001, License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications2009-01-0505 January 2009 License Amendment Request to Eliminate Unnecessary Reporting Requirements in the Operating License and the Administrative Controls Section of the Technical Specifications ML0823409962008-09-24024 September 2008 Technical Specifications, Issuance of Amendment No. 273 Refueling Operations - Decay Time ML0823409752008-09-24024 September 2008 Technical Specifications, Issuance of Amendment No. 289 Refueling Operations - Decay Time ML0806700642008-03-13013 March 2008 Tech Spec Pages for Amendment 288, Surveillance Requirements for Containment Building Penetrations ML0806700822008-03-13013 March 2008 Tech Spec Pages for Amendment 272, Surveillance Requirements for Containment Building Penetrations LR-N08-0054, License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations2008-03-0505 March 2008 License Amendment Request (LAR) S08-03, Request for Change to Technical Specifications Refueling Operations - Containment Building Penetrations ML0803204342008-03-0505 March 2008 Tech Spec Pages for Amendment 271 Re Refueling Operations - Decay Time ML0802204242008-02-27027 February 2008 Technical Specifications, Amendment. 270, License DPR-75, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System ML0802204142008-02-27027 February 2008 Technical Specifications to Amendment 287, License DPR-70, Steam Generator Feedwater Pump Trip, Feedwater Isolation Valve Response Time Testing and Containment Cooling System ML0734705152008-01-24024 January 2008 Amd 286/License DPR-75, Technical Specifications, Established More Effective & Appropriate Action, Surveillance & Administrative Requirements Re Ensuring the Habitability of the Control Room Envelop ML0734704082008-01-24024 January 2008 Amd 286/License DPR-70, Technical Specifications, Established More Effective & Appropriate Action, Surveillance & Administrative Requirements Re Ensuring the Habitability of the Control Room Envelop ML0717101192007-06-19019 June 2007 Technical Specifications for Amendment No. 266, Issuance of Amendments Relocation of Response Time Testing Limits (TAC Nos. MD2804 & MD2805) ML0717101212007-06-19019 June 2007 Technical Specifications for Amendment No. 283, Issuance of Amendments Relocation of Response Time Testing Limits (TAC Nos. MD2804 & MD2805) ML0715901892007-06-0606 June 2007 Units, 1 and 2, Tech Spec Pages for Amendment 282 Relocation of Technical Specification Requirements for the Movable Incore Detectors and Radioactive Gaseous Effluent Oxygen Monitoring Instrumentation ML0712202912007-05-10010 May 2007 Correction to Technical Specification Pages for Amendment Nos. 276 and 258 LR-N07-0103, Units 1 & 2, Correction to Technical Specification Pages/Amendment 276 and 2582007-05-0404 May 2007 Units 1 & 2, Correction to Technical Specification Pages/Amendment 276 and 258 ML0710906192007-04-19019 April 2007 Tech Spec Pages for Amendment 263 Accident Monitoring Instrumentation and Source Check Definition ML0710906332007-04-19019 April 2007 Tech Spec Pages for Amendment 280 Accident Monitoring Instrumentation and Source Check Definition ML0711503562007-04-19019 April 2007 Technical Specifications Elimination of Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process ML0711503582007-04-19019 April 2007 Technical Specifications Elimination of Requirements for Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process LR-N07-0058, Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-15015 April 2007 Application to Revise Technical Specifications (LCR S07-02) Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0709203782007-03-29029 March 2007 Technical Specifications, Steam Generator Tube Integrity ML0708704672007-03-27027 March 2007 Technical Specifications, Issuance of Amendment Steam Generator Alternate Repair Criteria 2023-08-14
[Table view] |
Text
- 4 -
(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at a steady state reactor core power level not in excess of 3459 megawatts (one hundred percent of rated core power)
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 279 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Deleted Per Amendment 22, 11-20-79 (4) Less than Four Loop Operation PSEG Nuclear LLC shall not operate the reactor at power levels above P-7 (as defined in Table 3.3-1 of Specification 3.3.1.1 of Appendix A to this license) with less than four (4) reactor coolant loops in operation until safety analyses for less than four loop operation have been submitted by the licensees and approval for less than four loop operation at power levels above P-7 has been granted by the Commission by Amendment of this license.
(5) PSEG Nuclear LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Updated Final Safety Analysis Report, and as approved in the NRC Safety Evaluation Report dated November 20, 1979, and in its supplements, subject to the following provision:
PSEG Nuclear LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
Amendment No. 279
ADMINISTRATIVE CONTROLS outage during which the SG tubes are inspected or plugged to confirm that the performance criteria are being met.
- b. Performance criteria for SG tube integrity. SG tube integrity shall be maintained by meeting the performance criteria for tube structural integrity, accident induced. leakage, and operational leakage.
- 1. Structural integrity performance criterion: All in-service steam generator tubes shall retain structural integrity over the full range of normal operating conditions (including startup, operation in the power range, hot standby, and cool down and all anticipated transients included in the design specification) and design basis accidents. This includes retaining, a safety factor of 3.0 against burst under normal steady state full power operation primary-to-secondary pressure differential and a safety factor of 1.4 against burst applied to the design basis accident primary-to-secondary pressure differentials. Apart from the above requirements, additional loading conditions associated with the design basis accidents, or combination of accidents in accordance with the design and licensing basis, shall also be evaluated to determine if the associated loads contribute significantly to burst or collapse. In the assessment of tube integrity, those loads that do significantly affect burst or collapse shall be determined and assessed in combination with the loads due to pressure with a safety factor of 1.2 on the combined primary loads and 1.0 on axial secondary loads.
- 2. Accident induced leakage performance criterion: The primary-to-secondary accident induced leakage rate for any design basis accident, other than a SG tube rupture, shall not exceed the leakage rate assumed in the accident analysis in terms of total leakage rate for all SGs and leakage rate for an individual SG. Leakage is not to exceed 1 gallon per minute per SG.
- 3. The operational leakage performance criterion is specified in LCO 3.4.6.2, "Reactor Coolant System Operational Leakage."
- c. Provisions for SG tube repair criteria. Tubes found by inservice inspection to contain flaws with a depth equal to or exceeding 40% of the nominal tube wall thickness shall be plugged.
The following repair criteria are applicable only for Refueling Outage 18 and the subsequent operating cycle: In lieu of the 40% of the nominal wall thickness repair criteria, the portion of the tube within the tubesheet of the inspected SGs shall be plugged in accordance with the following alternate repair criteria: Tubes with flaws located below 17 inches from the top of the tubesheet may remain in service regardless of size. Tubes with flaws identified in the portion of the tube from the top of the tubesheet to 17 inches below the top of.the tubesheet shall be plugged on detection.
- d. Provisions for SG tube inspections. Periodic SG tube inspections shall be performed. The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube, from the tube-to-tubesheet weld at the tube inlet to the tube-to-tubesheet weld at the tube outlet, and that may satisfy the applicable tube repair criteria.
SALEM - UNIT 1 6-19c Amendment No. 279
ADMINISTRATIVE CONTROLS In lieu of the above, the following inspection criteria are applicable only for Refueling Outage 18 and the subsequent operating cycle:
The number and portions of the tubes inspected and methods of inspection shall be performed with the objective of detecting.flaws of any type (e.g., volumetric flaws, axial and circumferential cracks) that may be present along the length of the tube beginning 17 inches below the top of the tubesheet on the tube hot leg side to 17 inches below the top of the tubesheet on the tube cold leg side.
The tube-to-tubesheet weld is not part of the tube. In addition to meeting the requirements of d.l, d.2, and d.3 below, the inspection scope, inspection methods, and inspection intervals shall be such as to ensure that SG tube integrity is maintained until the next SG inspection. An assessment of degradation shall be performed to determine the type and location of flaws to which the tubes may be susceptible and, based on this assessment, to determine which inspection methods need to be employed and at what locations.
- 1. Inspect 100% of the tubes in each SG during the first refueling outage following SG replacement.
- 2. Inspect 100% of the tubes at sequential periods of 120, 90, and thereafter, 60 effective full power months. The first sequential period shall be considered to begin after the first inservice inspection of the SGs. In addition, inspect 50% of the tubes by the refueling outage nearest the midpoint of the period and the remaining 50% by the refueling outage nearest the end of the period. No SG shall operate for more than 48 effective full power months or two refueling outages (whichever is less) without being inspected.
- 3. If crack indications are found in any SG tube, then the next inspection for each SG for the degradation mechanism that caused the crack indication shall not exceed 24 effective full power months or one refueling outage (whichever is less). If definitive information, such as from examination of a pulled tube, diagnostic non-destructive testing, or engineering evaluation indicates that a crack-like indication is not associated with a crack(s), then the indication need not be treated as a crack.
- e. Provisions for monitoring operational primary-to-secondary leakage.
SALEM - UNIT 1 c~z\TM - Nn,.
iIT 1Am4-nimpnt 2-79
ADMINISTRATIVE CONTROLS
- h. The following reporting requirements are applicable only for Refueling Outage 18 and the subsequent operating cycle:
The number of indications detected in the upper 17 inches of the tubesheet thickness along with their location, measured size, orientation, and whether the indication initiated on the primary or secondary side.
- i. The following reporting requirement is applicable only for Refueling Outage 18 and the subsequent operating cycle:
The operational primary to secondary leakage rate observed in each steam generator during the cycle preceding the inspection and the calculated accident leakage rate for each steam generator from the lowermost 4 inches of tubing (the tubesheet is nominally 21.03 inches thick) for the most limiting accident. If the calculated leak rate is less than 2 times the total observed operational leakage rate, the 180 day report should describe how the calculated leak rate is determined.
SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the U.S. Nuclear Regulatory Commission, Document Control Desk, Washington, D.C. 20555, with a copy to the Administrator, USNRC Region I within the time period specified for each report.
6,9.3 Violations of the requirements of the fire protection program described in the Updated Final Safety Analysis Report which would have adversely affected the ability to achieve and maintain safe shutdown in the event of a fire shall be submitted to the U. S. Nuclear Regulatory Commission, Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator of the Regional Office of the NRC via the Licensee Event Report System within 30 days.
6.9.4 When a report is required by ACTION 8 or 9 of Table 3.3-11 "Accident Monitoring Instrumentation", a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring for inadequate core cooling, the cause of the inoperability, and the plans and schedule for restoring the instrument channels to OPERABLE status.
SALEM - UNIT 1 6-24b Amendment No. 279